| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹65.3 LAccepted-Finance | 1 | Accepted-Finance Accepted | |
| 2 | Rejected-Technical | - | Rejected-Technical Not Qualified |
Tender Value
₹79.5 L
EMD Value
₹79,500
Closing Date
19 Jan 2024, 3:00 pmClosed
Executive Officer Karunguzhi Town Panchayat
Executive Officer No.1 GST Road, Karunguzhi
STENGTHENING TO BT ROAD AT WARD NO.11, BANGALA NAGAR THIDIR NAGAR AND KILLIYUR ROAD IN KARUNGUZHI TOWN PANCHAYAT
2024_DTP_407650_1
227/2023
Open Tender
Civil Works
Works
90 days
Karunguzhi Town Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹79,500
Yes
Karunguzhi Town Panchayat
12 Mar 2024
13 Jan 2024
19 Jan 2024
13 Jan 2024
19 Jan 2024
13 Jan 2024
18 Jan 2024
Amount
Picking 5cm to 10cm old metalled surface and sectioning the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply Pipes. The Rate inclusive of all charges etc, complete as per standard specifications. - 10 sqm
Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam for required thick specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density,including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers MORTH 406
Providing and laying Priming coat 7Kg / 10 Sq.m over WMM surface using of SSI Emulsion Bitumen for 10 Sq.m and cost Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cast as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bituminous by mechanical sprayer including hire and fuel for all tools and plants employed etc., complete. MORTH Specifications 111,112,501,503 and 900.
Providing and laying Tack coat 2.50 Kg / 10 Sq.m over Wet Mix Mecadam surface using of RS1 Emulsion Bitumen for 10 Sq.m and cost of Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cost as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bituminous by mechanical sprayer including hire and fuel for all tools and plants employed etc., complete as per MORTH Specifications 111,112,501,503 and 900.
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Supplying and laying U/S Gravel to the specified thick including cost and conveyance of Well gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH
Road marking with Hot Applied ThermoPlastic Compound with Reflectorising Glass Beads on Bituminious Surface Proving and Laying of Hot Applied thermoplastic Compound 2.5 mm thick inculding reflectorising glass beads @ 250gms per sqm area thickness of 2.5mm exclusive of surface applied glass beads As Per IRC: 35 The finished surface to be level uniform and free from streaks and holes Inculding all Charges etc.., complete
Retro- Reflectorised Traffic Signs: (Cautionary, Mandatory and Informatory Signs) Providing and Fixing of Retro Reflectorised Cautionary, and Informatory signs (with or without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to IRC 67-2010 and ASTM D 4956-09, Type IV Specification and fixed over 1.5mm thick Aluminium sheet fixed on back supporting frame of 25mmx25mmx3mm Mild steel angle and supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmx45cmx60cm, 60cm below Ground level etc., complete including 7 year warranty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67:2010 Specification (as per Morth Spec.No.801)
Cost of Road
MAINTENANCE
Towards the charges for routine maintenance of the road work executed under NABARD SCHEME including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost.
Clearing and Grubbing by Light Jungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per MORTH Specification 111, 112, 201.
Upkeeping 1st year (50%)
Upkeeping 2nd year (60%)
Upkeeping 3rd year (60%)
Upkeeping 4th year (60%)
Upkeeping 4th year (60%)
Earth Work excavating and deposting on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay, Stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS20A for making up the berms. as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision [Twice in a year]
Upkeeping for 1st year (40%)
Upkeeping for 2nd year (40%)
Upkeeping for 3rd year (40%)
Upkeeping for 4th year (40%)
Upkeeping for 5th year (40%)
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg/sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per clause 503
4 th year 3%
5 th year 5%
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
4 th year 3%
5 th year 5%
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .