Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.8 LAccepted-Finance | L1 | Accepted-Finance accepted | |
| 2 | L2₹48.9 L+₹2.1 L (4.52%)Accepted-Finance NO 87 NEW BALAJI NAGAR ATTIPATTU CHENNAI 600 120 | CHENNAI | CHENNAI | TAMIL NADU | 600120 | L2 | Accepted-Finance accepted |
| Sl No | Description | Qty | Unit | SRI TIRUMALA ENGINEERING WORKS L1 | A.R.C.ENGINEERING L2 |
|---|---|---|---|---|---|
| 1.00 | Unit-I, II & III - HT & LT Switchgear – (1) Carrying out Time bound works for maintenance & overhauling of important critical modules and HT / LT breakers switchgear for the period of 360 days for the year 2026-27
Releasing and cleaning of critical modules, healthiness checking of power Contactor tips and replacing if necessary and terminal tightness of all components and re-fixing the modules in the respective panels. Checking of cable tightness at module end replacing of lugs if necessary for 1 module) LT module 324 Nos for all the 3 units. (Critical modules in USS, BVDC, TVDC, & N/E SWGR) | 495 | Nos | 2,365 ₹13,81,396.5 Lowest | 2,472 ₹14,43,895.2 |
| 2.00 | Releasing and cleaning of defective Soot Blower MCC modules, healthiness checking of power Contactor tips and replacing if necessary and terminal tightness of all components and re-fixing the modules in the respective panels. Checking of cable tightness at module end,(replacing of lugs if necessary for 1 module) LT module (56 Nos per Unit), 168 Nos for all the 3 units. (Critical modules in Soot Blower MCC) | 360 | Nos | 2,365 ₹10,04,652 Lowest | 2,472 ₹10,50,105.6 |
| 3.00 | Releasing, checking and cleaning of finger contacts in breaker with acetone, healthiness of spring charging motors and mechanisms, tightness checking of all components of breakers and lubrication of all moving parts and checking their operations and re fixing the breakers. Opening of breaker panel back doors, checking cable tightness, cleaning and re fixing etc. for 1 No. LT breaker. (Critical modules in SSS, USS, BMCC, BVDC & N/E SWGR) Unit – I 28 Breakers
Unit – II 23 Breakers
Unit – III 20 Breakers | 210 | Nos | 2,365 ₹5,86,047 Lowest | 2,472 ₹6,12,561.6 |
| 4.00 | Replacement of spring charge, motor in 6.6 KV HT breaker
Unit – I 50 Breakers
Unit – II 50 Breakers
Unit – III 36 Breakers | 20 | Nos | 3,401 ₹80,263.6 Lowest | 3,556 ₹83,921.6 |
| 5.00 | Replacement of mechanism in 6.6KV ABB make HT breaker
Unit – I 50 Breakers
Unit – II 50 Breakers
Unit – III 36 Breakers | 20 | Nos | 16,938 ₹3,99,736.8 Lowest | 17,707 ₹4,17,885.2 |
| 6.00 | Charges for cleaning and lubricating of all moving parts of HT breakers, upper and lower pole arms, vacuum bottles with Acetone / IPA. All bolts and nuts tightness checking, checking healthiness of Interrupters, closing / Tripping operations mechanically and checking of IR value for 1 No. breaker. Unit – I, II and III (Station & Unit Switchgear) | 288 | Nos | 610 ₹2,07,302.4 Lowest | 637 ₹2,16,478.08 |
| 7.00 | Unit-I, II & III - HT & LT Switchgear – (2) Annual overhauling & Maintenance of HT / LT Switchgear and all its bus duct for the year 2026-27
cleaning of 6.6KV, 15.75KV and LT Switchgear , busducts(inside and outside)including insulators etc. 6.6KV breakers panels outgoing cable terminals, busbars inside and outside of the panels including insulators etc. checking tightness of joints, minor rectification works such as replacement of damaged bus support insulators , gaskets inspection covers and panel doors and covers paint touchup , lubricating the breakers mechanism , providing insulation tape in outgoing terminals, checking breaker mechanism replacing parts in breakers etc., and assisting re commissioning works.
1. HT Switchgear
Charges for releasing all inspection covers of bus ducts, checking of Initial IR value, thorough cleaning by applying Acetone / IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of healthiness of Rubber bellows for the Incomer & Tie bus ducts of one bus (U1A, U2A & U3A 6.6KV Switchgear bus duct) | 3 | Nos | 11,736 ₹41,545.44 Lowest | 12,269 ₹43,432.26 |
| 8.00 | Charges for releasing all inspection covers of bus ducts, checking of Initial IR value, thorough cleaning by applying Acetone / IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of healthiness of Rubber bellows for the Incomer & Tie bus ducts of one bus (U1B, U2B and U3B 6.6KV Switchgear bus duct) | 3 | Nos | 11,736 ₹41,545.44 Lowest | 12,269 ₹43,432.26 |
| 9.00 | Charges for releasing all inspection covers of bus ducts, checking of Initial IR value, thorough cleaning by applying Acetone / IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of healthiness of Rubber bellows for the Incomer & Tie bus ducts of one bus ( C1A - U1A, C2A-U2A link busduct & C3A-U3A tie busduct ) | 3 | Nos | 11,736 ₹41,545.44 Lowest | 12,269 ₹43,432.26 |
| 10.00 | Charges for releasing all inspection covers of bus ducts, checking of Initial IR value, thorough cleaning by applying Acetone / IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of healthiness of Rubber bellows for the Incomer & Tie bus ducts of one bus (C1B - U1B, C2B-U2B link busduct &C3B-U3B tie bus duct) | 3 | Nos | 11,736 ₹41,545.44 Lowest | 12,269 ₹43,432.26 |
Tender Value
Refer Docs
EMD Value
₹40,400
Closing Date
16 Sept 2026, 2:00 pmClosed
SE/ES/NCTPS-I
SE/ES/NCTPS-I,chennai-120
NCTPS I ES Circle EM I Dn S Dn II Unit I II III Routine maintenance overhauling of important critical modules HT LT breakers switchgears all its busducts for a period of 360 days for the year 2026 27
2026_EB_700060_1
CE/NCTPS-I/SE/ES/WC-43/2026-27
Open Tender
Power/Energy Projects/Products
Works
360 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹40,400
Yes
28 Sept 2026
1 Sept 2026
17 Sept 2026
1 Sept 2026
16 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Unit-I, II & III - HT & LT Switchgear – (1) Carrying out Time bound works for maintenance & overhauling of important critical modules and HT / LT breakers switchgear for the period of 360 days for the year 2026-27
Releasing and cleaning of critical modules, healthiness checking of power Contactor tips and replacing if necessary and terminal tightness of all components and re-fixing the modules in the respective panels. Checking of cable tightness at module end replacing of lugs if necessary for 1 module) LT module 324 Nos for all the 3 units. (Critical modules in USS, BVDC, TVDC, & N/E SWGR) | 495 | Nos | 2,149.95 | ₹10,64,225.25 |
| 2 | Releasing and cleaning of defective Soot Blower MCC modules, healthiness checking of power Contactor tips and replacing if necessary and terminal tightness of all components and re-fixing the modules in the respective panels. Checking of cable tightness at module end,(replacing of lugs if necessary for 1 module) LT module (56 Nos per Unit), 168 Nos for all the 3 units. (Critical modules in Soot Blower MCC) | 360 | Nos | 2,149.95 | ₹7,73,982 |
| 3 | Releasing, checking and cleaning of finger contacts in breaker with acetone, healthiness of spring charging motors and mechanisms, tightness checking of all components of breakers and lubrication of all moving parts and checking their operations and re fixing the breakers. Opening of breaker panel back doors, checking cable tightness, cleaning and re fixing etc. for 1 No. LT breaker. (Critical modules in SSS, USS, BMCC, BVDC & N/E SWGR) Unit – I 28 Breakers
Unit – II 23 Breakers
Unit – III 20 Breakers | 210 | Nos | 2,149.95 | ₹4,51,489.5 |
| 4 | Replacement of spring charge, motor in 6.6 KV HT breaker
Unit – I 50 Breakers
Unit – II 50 Breakers
Unit – III 36 Breakers | 20 | Nos | 3,092.1 | ₹61,842 |
| 5 | Replacement of mechanism in 6.6KV ABB make HT breaker
Unit – I 50 Breakers
Unit – II 50 Breakers
Unit – III 36 Breakers | 20 | Nos | 15,397.8 | ₹3,07,956 |
| 6 | Charges for cleaning and lubricating of all moving parts of HT breakers, upper and lower pole arms, vacuum bottles with Acetone / IPA. All bolts and nuts tightness checking, checking healthiness of Interrupters, closing / Tripping operations mechanically and checking of IR value for 1 No. breaker. Unit – I, II and III (Station & Unit Switchgear) | 288 | Nos | 554.03 | ₹1,59,560.64 |
| 7 | Unit-I, II & III - HT & LT Switchgear – (2) Annual overhauling & Maintenance of HT / LT Switchgear and all its bus duct for the year 2026-27
cleaning of 6.6KV, 15.75KV and LT Switchgear , busducts(inside and outside)including insulators etc. 6.6KV breakers panels outgoing cable terminals, busbars inside and outside of the panels including insulators etc. checking tightness of joints, minor rectification works such as replacement of damaged bus support insulators , gaskets inspection covers and panel doors and covers paint touchup , lubricating the breakers mechanism , providing insulation tape in outgoing terminals, checking breaker mechanism replacing parts in breakers etc., and assisting re commissioning works.
1. HT Switchgear
Charges for releasing all inspection covers of bus ducts, checking of Initial IR value, thorough cleaning by applying Acetone / IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of healthiness of Rubber bellows for the Incomer & Tie bus ducts of one bus (U1A, U2A & U3A 6.6KV Switchgear bus duct) | 3 | Nos | 10,668.9 | ₹32,006.7 |
| 8 | Charges for releasing all inspection covers of bus ducts, checking of Initial IR value, thorough cleaning by applying Acetone / IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of healthiness of Rubber bellows for the Incomer & Tie bus ducts of one bus (U1B, U2B and U3B 6.6KV Switchgear bus duct) | 3 | Nos | 10,668.9 | ₹32,006.7 |
| 9 | Charges for releasing all inspection covers of bus ducts, checking of Initial IR value, thorough cleaning by applying Acetone / IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of healthiness of Rubber bellows for the Incomer & Tie bus ducts of one bus ( C1A - U1A, C2A-U2A link busduct & C3A-U3A tie busduct ) | 3 | Nos | 10,668.9 | ₹32,006.7 |
| 10 | Charges for releasing all inspection covers of bus ducts, checking of Initial IR value, thorough cleaning by applying Acetone / IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of healthiness of Rubber bellows for the Incomer & Tie bus ducts of one bus (C1B - U1B, C2B-U2B link busduct &C3B-U3B tie bus duct) | 3 | Nos | 10,668.9 | ₹32,006.7 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_841511.xls
BOQ • 0.36 MB
corrigendum.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .