Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
9 Jun 2025, 3:00 pmClosed
Block Development Officer (VP), Natham
Block Development Office, Natham
Improvements to burial ground (Waiting shed, Cremation shed, Bath tub, and Water Supply) for Reddiyapatti AD Colony mayanam, H/O Reddiyapatti
2025_RDTN_564407_1
TN-105-Iyothidass-Reddiyapatti
Open Tender
Civil Works - Buildings
Works
Natham
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12,000
Block Development Office, Natham
12 Jun 2025
3 Jun 2025
9 Jun 2025
3 Jun 2025
9 Jun 2025
3 Jun 2025
6 Jun 2025
Amount
1. Improvements to burial ground (Waiting shed, Cremation shed, Bath tub, and Water Supply) for Reddiyapatti AD Colony mayanam, H/O Reddiyapatti ESTIMATE AMOUNT : RS. 12.00 LAKHS
Construction of Waiting Shed
Earthwork excavation for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed.
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Below GL
Above GL
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Providing granolithic floor finish to an average thickness of 25 mm with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Construction of Cremation Shed
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Building work
Filling the basement with excavated earth other than sand including cost of all charges etc.
Filling the carted river sand including cost and conveyance and filling charges etc., as per std. Specification
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete.
RCC 1:1.5 :3 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer
Finishing the top of roof with one course of machine pressed tiles of size 20cmx20cmx20mm of approved quality laid in cement mortar 1:3 mix to 12mm thick mixed with water proofing compound confirming to ISS by 2% weightof cement used and the joint pointed neatly to full depth of tiles with same mortar as per std., specifications etc., complete.
Plastering with CM 1:3 mix 10mm thick including all cost of materials and all labour charges etc., complete
Plastering with CM 1:5 mix 12mm thick including all cost of materials and all labour charges etc., complete
Providing Granolithic pattern floor finish with c.c 1:2:4 mix using 10 to 12mm ISS metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Painting two coats with oil bound distember including all labour charges and all labour charges etc.,
Painting two coats with ready mixed plastic emulsion Paint of first class quality paint and of approved colour over a priming coat , including scrapping cleam removal of dirt etc. complete and including necessary plaster of paris putty where ever required Etc , complete
Construction of Bath Tub
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 (One Cement, Four sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Brick work in Cement Mortar1:5 (one cement and five sand) using best quality of country bricks of size 8-3/4" x 4-1/4" x 2-1/4" for foundation and basement including curing, etc., complete complying with standard specifiction.
Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.
Reinforced Cement Concrete 1:1.5:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labor charges etc complete.
Dadooding wall with glazed tiles of any colour and design including cost and conveyance of all materials and all labour charges, etc complete
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Exterior Emulsion Two coats over priming coat including cost and conveyance of all materials and labor charges etc complete.
Water Supply Arrangements
Towards the cost of Providing Geophysical investigation survey including all charges etc.,complete
Drilling of 180 mm Dia Vertical Borewell in Overburden soil including labour charges for insertion of casing pipe including all charges etc.,complete
Drilling of 150mm dia vertical borewell in hard rock area as per the recommendation of hydrogeolegist including the rig transportation inserting of casing pipe and flushing etc.,complete
Supply and fixing of 180 mm dia PVC casing pipe (PVC) with ISI mark including all charges etc.,complete
Supply and delivery of the following
Single Phase Submersible Pumpset Suitable for 150mm dia borewell with ISI Mark with Panel board having Duty of 20 LPM x 150m Head - 2.00 HP
Pvc insulated and sheathed 3 Core Flat type 2.50 Sq .mm Submersible copper cable with ISI Mark
40mm dia UPVC Pipe
40mm dia GI pipe
40 mm dia G.I Union
40mm G.I Elbow
40 mm dia GM gate valve
40mm G.I Hex Nipple
40mm MS Clampset
Borewell cover PVC
25mm dia PVC pipe (Super thick) for Cable encansing
63mm PVC 4 kg/sqcm Pipe
Supply and delivery and fixing of HDPE water storage Tank of 1000 litres capacity including Cost and conveyance and charges for fixing GI pipes and specials for pipe connection works including cutting and Threading and fixing charges etc., complete
Labour charges for erection of 5.00 HP Submersible pumpset into the Borewell with GI Raiser pipes, cables with proper clamping,valves fixing,cable jointing and wiring from EB pole to Kiosk fixing of main switch Panel board etc Complete and testing the pumpset and trail run for 10 days
Providing of EB service main arrangement from EB post to pump room and fitting service pipe EB board wiring complete including 7/20 PVC overhead wiring main,fuse unit, GI wire and all materials fixing complete.
Construction of Pump room in Brick masonry including cost and conveyance of all materials and all labiur charges
Construction of Brick Masonry in cement mortar for HDPE water storage tank Pedastal of 1.60m Dia as per type design prescribed including waste water collection platform with drain including plastering and colour washing etc complete
Providing bore well pit protection arrangements in Brick work and using CC 1:2:4 including all materials and all labour charges
Earth work excavation hard stiff clay and hard rock earth and pipe laying, Jointing and refilling the trench with excavation soils including all labour charges etc.,complete
63mm PVC 4 kg/sqcm Pipe
cable line
Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
N SATHISH KUMAR (BID ID -1359410)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .