Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹14.3 L+₹76,502 (5.67%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
13 Aug 2026, 4:00 pmClosed
Executive Engineer Hydraulic Division Gurez
Executive Engineer Hydraulic Division Gurez
Laying and Fitting of GI/HDPE pipes and construction of 02 No. Intake collection chambers for water supply scheme Buglinder Tulail
2026_PWDJK_319461_1
PHE E-NIT No 04 of 2026-27 Hyd-Grz-197-203 E-tendering Dated-04-08-2026
Open Tender
Civil Works
Percentage
60 days
Gurez
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer Hydraulic Division Gurez
₹30,000
Executive Engineer Hydraulic Division Gurez
18 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Laying Fitting GI/HDPE and Construction of Infiltration Gallery.
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 93.24 | Cum | 187.3 | ₹17,463.85 |
| 1.01 | Ordinary Rock. | 39.96 | Cum | 392.8 | ₹15,696.29 |
| 2 | Providing and laying of dry stone soiling hand packed tightly including carriage complete job. | 11.02 | Cum | 1,000 | ₹11,020 |
| 3 | Hand-packing stones in wire-crates excluding cost of creates and stones . | 72.82 | Cum | 371.15 | ₹27,027.14 |
| 4 | Dumping stone excluding cost of stone in Horizontal on level. | 72.82 | Cum | 237.9 | ₹17,323.88 |
| 5 | Supply of 4mm dia G.I wire woven crates 4”x4” mesh as per ISI specification .As directed by EIC. | 428.66 | Sqm | 247.48 | ₹1,06,084.78 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 4.54 | Cum | 9,821.85 | ₹44,591.2 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 553 | Kgs | 123.2 | ₹68,129.6 |
| 8 | Centring and shuttermg including strutting, propping etc. and removal of form for: Suspended floors,roofs,landings,balconies and access platform. | 7.2 | Sqm | 718.2 | ₹5,171.04 |
| 9 | Providing of 150mm Dia Perforated Pipe with specification confirming to IS:15801,5mm to 8mm thick,with pressure rating 10kg/sqm,fabricated of out of approved make with nominal dia of 9mm perforation with PVC Tees,end caps etc. | 18 | RM | 1,900 | ₹34,200 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_1058215.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .