| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC | ₹2.5 Cr | L1 | Accepted-AOC LOWEST |
| 2 | L2₹2.5 Cr+₹1.0 L (0.41%)Rejected-Finance NEAR KATI CHAURAHA HUZURPUR ROAD BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | ₹2.5 Cr+₹1.0 L (0.41%) | L2 | Rejected-Finance HIGH RATE BIDDER |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per Clause 8.05 (xxxi) (B), 8.02 (C) Shuddi Patra-20.02.2024, 8.03 C (3) of Bid Document |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per Clause 8.05(xxxi-I), 8.05(xxxi) (B), 8.02(h) of Bid Document |
Tender Value
Refer Docs
EMD Value
₹5.0 L
Closing Date
29 Feb 2024, 12:00 pmClosed
SE IX CIRCLE IW BAHRAICH
OFFICE OF THE SE IX CIRCLE IW BAHRAICH
ANTI EROSION WORK OF VILLAGE GROUP LAXMANPUR BHAGWANPUR (LAXMANPUR KOTHI), PARSA DEHRIYA BETWEEN KM. 0.000 - 0.100 AT D/S LEFT BANK OF RAPTI RIVER BARRAGE DISTRICT - SHRAWASTI.
2024_UPIDC_900664_1
03/SE-IX/2023-24
Open Tender
Civil Works
Item Rate
90 days
SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹5.0 L
28 Mar 2024
20 Feb 2024
29 Feb 2024
20 Feb 2024
29 Feb 2024
20 Feb 2024
Amount
Earth work including lead upto 30M & Lift upto 1.5 M, excluding mechanical compaction but including manual compaction and dressing to profile including all lift rates shall be applicable as per direction of Engineer in charge. including cost of all material, labour, T&P etc. but excluding cost of GST.
Supplying and laying of EC Bag (New) Filled with RBM, striching with sutali and dumping in Nylon Crate (Size 1x1x1 m. & mesh size 200x200 mm) including cost of all material, labour, T&P etc. and all Taxes as per direction of Engineer in charge., but excluding cost of GST.
Supply and Laying Geotextile sheet made of 200 gsm woven multifilament polypropylene yarn Below Boulder Pitching including cost of all material, labour & T&P etc. all tax's as per direction of Engineer in charge but excluding cost of GST.
Supply and Laying Stone Boulder 20-60 Kg. in Slope Pitching without wire crate including Stacking of Boulder in stock yard including cost of all material, labour and T&P etc and all tax's but excluding cost of GST.
Supply and Dumping/Laying Stone Boulder 20-60 Kg in Launching apron in wire crates size 2.0x1.5x1.0 M. including Stacking of Boulder in stock yard, all lead, lift, labour, T&P and cost of all material and all tax's. but excluding cost of GST.
M/S SENGER CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .