| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹7.9 L+₹2.1 L (37.0%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹8.2 L+₹2.5 L (42.5%)Rejected-Finance R O VILLAGE NALAG P O PAHAL SUB TEH SUNI DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | L3 | Rejected-Finance Rejected | |
| 4 | L4₹10.0 L+₹4.2 L (73.2%)Rejected-Finance | L4 | Rejected-Finance Rejected | |
| 5 | L5₹10.8 L+₹5.0 L (85.9%)Rejected-Finance | L5 | Rejected-Finance Rejected |
Tender Value
₹5.3 L
EMD Value
₹10,500
Closing Date
29 Sept 2020, 10:30 amClosed
Executive Engineer RB MC Shimla
Executive Engineer RB MC Shimla
Construction of path from Rana Niwas to Suryanager in ward No 29 Vikasnagar
2020_MC_40794_23
2318Dated05092020
Open Tender
Civil Works
Item Rate
120 days
Shimla
Please refer Tender Documents
6 documents required · 6 mandatory
₹350
Executive Engineer RB MC Shimla
₹10,500
25 Jul 2023
18 Sept 2020
29 Sept 2020
18 Sept 2020
29 Sept 2020
18 Sept 2020
Amount
Cutting in earth work in all kinds of soil including spade work, pick work, jumper work and blasting work and disposal of excavated earth up to all leads and lifts as directed by Engineer-in-Charge. (Disposal of earth/muck in MC dumping site at Bharyal free of cost, transportation charges will be paid extra)
Excavation in earth work in all kinds of earth work including spade work, pick work, jumper work, B/work chiseling wedging out of rock etc. up to all lifts in earth work including dressing of sides and bed and disposing of excavated earth to be leveled and neatly dressed as directed by the Engineer-in-charge. (Disposal of earth/muck in MC dumping site at Bharyal free of cost, transportation charges will be paid extra)
Providing and laying cement concrete 1:6:12 (1 cement: 6 sand: 12 graded stone aggregate 40mm nominal size) and curing complete excluding cost of centring and shuttering in Foundation and plinth
Providing from work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling upto all heights and removal of the same for insitu-reinforced concrete & plain concrete work in Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters buttresses, plinth and string courses and the like
Providing and laying cement concrete 1:5:10 (1 Cement: 5 Sand: 10 graded stone aggregate 40mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining walls/Breast walls, the size of plums shall usually be 150mm to 300mm as per HPPWD specification
P/F 100 mm dia PVC pipe for weep holes
Providing and laying cement concrete 1:2:4 (1 cement: 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in Foundation and plinth.
Steel work welded in built up sections,trusses and framed work,including cutting,hosting,fixing in position and applying a priming coat of red lead paint.In beams joists channels,angles,tee,flats with connecting plates or angle cleats as in main and cross beams,hip and jack rafters,purlins connected to common rafters and the like.
P/F M.S Pipe 40mm nominal bore for railing & fixed in M.S Angle /Channels.
Precast Chequred tiles 20mm thick of chequred tiles specified sizes laid in floors, treads of steps and landings on a bed of 25mm average thickness of cement mortar 1:6 (1cement :6 sand) jointed with neat cement slury mixed with frignest to match the shade of tiles including rubbing and polishing complete with tiles of following shades. (i) 50% Grey and 50% Colour
Painting two costs (excluding priming cost on new steel and other metal surfaces eith enamel paint brushin to give an even shade including cleaning the surface of all dirt,dust and other foregin matters :--Enamel paint other than white
Providing and fixing M.S. pipe railing of standard design 1.65x0.90mtr approximately weight @24.50kg per panel including applying priming coat.
Bhagwan Singh Govt. Contractor
Kuldeep Sharma
CHAUHAN CONSTRUCTIONS
Rakesh Kumar Pundir
Bhaw Singh Chauhan
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .