Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrRejected-Finance | ₹1.2 Cr | L1 | Rejected-Finance ok |
| 2 | L2₹1.3 Cr+₹10.3 L (8.93%)Rejected-Finance NEAR AANGANBADI CENTRE VPO THOBA DHANI TESHIL DISTT FATEHABAD 125050 | HISAR | HARYANA | 125050 | ₹1.3 Cr+₹10.3 L (8.93%) | L2 | Rejected-Finance ok |
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
8 Mar 2021, 12:00 pmClosed
Ramesh Kumar, XEN HWS Div. Hisar
Ramesh Kumar, XEN HWS Div. Hisar
Repair of lining patches Balsamand Sub Branch RD 54000 to RD 69840.
2021_HRY_161339_4
HWS-3/2021
Open Tender
Civil Works - Canal
Item-rate/Agreement basic
25 days
Hisar
Please refer Tender documents.
4 documents required · 4 mandatory
₹15,000
Yes
₹2.4 L
Yes
25 Mar 2021
27 Feb 2021
8 Mar 2021
27 Feb 2021
8 Mar 2021
27 Feb 2021
Amount
75 mm thick cement concrete 1:2:4 cement 240 kg/cum lining on 6 mm thick cement slurry 1:3 including dressing and preparation of sub grade and form work for side slopes and curve portion complete as per HSR item No. 10.41, 19.12, & 19.2
Cement concrete 1:2:4 cement 240 kg/cum with 20 mm nominal size of stone aggregate in foundation and plinth.
Filling expansion joints with special imprevious hot pour 12 mm wide complete as per HSR-19.17 @ 0.35+450%
E/Work excavation in all kind of soils including dressing with lead of 495 mtr @ (586.60 +45.90+15x6+32x13.25+26x12.0)+425%
Extra allowance for compaction of earth to the specification @ (68.10-45.90+32.50)+425% +225+135%
Dismantling of brick work laid in cement sand mortar @ 35.60+550%
Dismantlining of cement concrete 1:4:8 @ 37.40+550 (HSR 8.6 b)
Single layer brick lining on side slopes in 1:3 mortar over 12 mm 1:3 plaster over 10 mm 1:6 plaster i/c preparation of S/grade,scaolding, cuting,templete allowance etc complete in all respect.
1st class brick masonry in cement sand mortar 1:3 in foundation and plinth, including supply of all materis as per HSR11.5 @ 461.40+650%
E/Work excavation in foundation and trenches @ 1108.10+425%
Cement concrete 1:3:6 with 20 mm nominal size of stone aggregate in foundation and plinth,.complete as per HSR 10.40 @ 516.90+450%
1st class brick masonry in cement sand mortar 1:4 in foundation and plinth, including supply of all materis as per HSR11.4 @ 424.600+650%
Laying, cutting, spreaing and fixing 150 micron polythene sheet. (NS)
Supply of 150 micron polythene sheet. (NS)
Credit for old Brick work
Pali Ram Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .