| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.4 LAdmitted-Finance | -25.71% | ₹18.4 L | L1 | Admitted-Finance |
| 2 | L2₹19.3 LAdmitted-Finance | -22.03% | ₹19.3 L | L2 | Admitted-Finance |
| 3 | L3₹20.3 LAdmitted-Finance DELHI ALWAR ROAD SADDIQ NAGAR DISTRICT NUH 122107 | NUH | HARYANA | 122107 | -18.25% | ₹20.3 L | L3 | Admitted-Finance |
| 4 | L4₹20.8 LAdmitted-Finance | -15.99% | ₹20.8 L | L4 | Admitted-Finance |
| 5 | L5₹21.1 LAdmitted-Finance | -14.99% | ₹21.1 L | L5 | Admitted-Finance |
Tender Value
₹24.8 L
EMD Value
₹49,573
Closing Date
24 Apr 2026, 6:00 pmClosed
Executive Officer
Office Nagarpalika Ramgarh
Construction Drain From Main Road to 2.3 MLD SWPS (17 No. Ginani) Ramgarh
2026_DLB_551562_1
npara/26-27/16
Open Tender
Civil Works
120 days
Ramgarh Shekhawati
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Executive Officer, MD RISL
₹49,573
Yes
4 May 2026
15 Apr 2026
27 Apr 2026
15 Apr 2026
24 Apr 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 260 | cum | 229.5 | ₹59,670 |
| 1.2 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. | 150 | cum | 159 | ₹23,850 |
| 1.3 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks | 15 | cum | 678 | ₹10,170 |
| 1.4 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::Sand, bazri, ballast, kankar up to 1 km | - | cum | 129.21 | - |
| 1.5 | Cleaning and removal of earth, silt, sludge, kankar, boulder, building material and garbage in existing nallah/drains including construction of bypass arrangement to bypass water with 1.5m lift from ground level and lead upto 50 m including foul & saturated condition where pumping out or bailing out of water is required, including shoring, shuttering where required and dewatering. Making access for disposal and dressing disposal side as per the directed of the Engineer. For Depth upto 1.50 m | - | cum | 406 | - |
| 1.6 | For depth above 1.50 m and upto 3.00 m | - | cum | 472 | - |
| 1.7 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 6,340 | - |
| 1.8 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery,lighting, guarding and maintenance of diversion. | - | cum | 2,955 | - |
| 1.9 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Mild steel and Medium Tensile steel bar | - | kg | 81.8 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.39 MB
BOQ_983037.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid