Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 CrAdmitted-Finance | ₹9.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹12.3 CrAdmitted-Finance | ₹12.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹12.5 CrAdmitted-Finance | ₹12.5 Cr | L3 | Admitted-Finance |
| 4 | L4₹13.8 CrAdmitted-Finance SECOND FLOOR 210 RAJENDRA PLACE PADMA TOWER CENTRAL DELHI NEW DELHI DELHI DELHI 110008 | WEST DELHI | DELHI | 110008 | ₹13.8 Cr | L4 | Admitted-Finance |
| 5 | L5₹16.7 CrAdmitted-Finance ABC HOUSE PLOT NO 432 5TH FLOOR PHULNAKHARA BHUBANESWAR 754001 ODISHA | CUTTACK | ODISHA | 754001 | ₹16.7 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JAGRUTI WELFARE ORGANISATION L1 | Lion Services Limited L4 | P GOPINATHA REDDY PROPRIETRIX P KAVITHA L2 | BVG INDIA LIMITED L5 | Ourland Engineering works Pvt Ltd L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Mechanical Sweeping and Allied Cleaning of Select Road Stretches under Package-III of Bhubaneswar Municipal Corporation | ||||||||
| 1.10 | Sweeping of assigned roads with Mechanical Road Sweeper in compliance to detailed technical specifications in RFP document and transportation of silt/waste so gerenated from sweeping and collected in hopper to designated site. (Annual Quantity worked out considering 208.40 Lane Kms road length to be swept for minimum 350 days in a year) | 72,940 | Kms | 5,39,02,660 ₹5.4 Cr | 6,85,63,600 ₹6.9 Cr | 6,33,57,872.2 ₹6.3 Cr | 9,62,80,800 ₹9.6 Cr | 6,41,14,260 ₹6.4 Cr |
| 1.20 | Wall to Walll Sweeping,Litter picking,GPS & TPW of road berms and footpath of entire assigned road stretch excluding road portion cleaned by Mechanical Road Sweeper-Non-commercial portion along with transportation of generated waste in segregated manner using LCV vehicle to the designated location. (Annual Quantity worked out considering LHS+RHS Road length of 117.43 Kms out of which 40% assumed as Commercial portion i.e. 46.97 Kms for two times cleaning) | 60,006 | Kms | 3,50,43,504 ₹3.5 Cr | 6,44,46,444 ₹6.4 Cr | 5,48,10,080.46 ₹5.5 Cr | 6,43,86,438 ₹6.4 Cr | 5,53,85,538 ₹5.5 Cr |
| 1.30 | Bush Cutting by engaging 10 nos. of labours and minimum 4 nos. of Bush Cutting machine along with transportation of Bush Cutting waste to the designated location using open LCV vehicle (Annual Quantity worked out considering bush cutting for 2 days in a week i.e. 96 days of operation in a year multiplied with 10 nos. of labours. The unit rate to be adjusted accordingly so as to cover the cost of transportation, engagement of supervisor and also the capital and operation cost of the Bush Cutting machine) | 960 | Mandays | 9,10,080 ₹9.1 L | 10,54,080 ₹10.5 L | 9,45,648 ₹9.5 L | 12,68,160 ₹12.7 L | 9,55,200 ₹9.6 L |
| 1.40 | Engaging labours for manual cleaning of signage, street furniture and statue including cleaning of bushes/grass/litters in the surrounding area within minimum 10 meters radius of any statue and transportation of waste to the designated site (Annual Quantity worked out considering bush cutting for 2 days in a week i.e. 96 days of operation in a year multiplied with 10 nos. of labours) | 960 | Mandays | 6,19,200 ₹6.2 L | 7,48,800 ₹7.5 L | 7,30,723.2 ₹7.3 L | 7,22,880 ₹7.2 L | 7,44,000 ₹7.4 L |
| 1.50 | Mechanised cleaning of signage, street furniture and statue using 1 no. of bolero pick up mounted mechanised water sprinkler with hand gun for cleaning of statues and signage for 2 times in a week (Annual Quantity worked out considering 96 days of operation in a year. rate to be quoted for per day of operation of 8 hours) | 96 | Days | 14,38,944 ₹14.4 L | 10,51,200 ₹10.5 L | 10,31,616 ₹10.3 L | 18,96,000 ₹19.0 L | 13,92,000 ₹13.9 L |
| 1.60 | Deployment of Push Carts and Workmen accessories such as PPE kit, Apron, Uniform,Gum boot, Gloves etc (Lumpsum monthly cost to be quoted) | 12 | Months | 22,17,600 ₹22.2 L | 15,36,000 ₹15.4 L | 14,82,948 ₹14.8 L | 18,00,000 ₹18 L | 16,80,000 ₹16.8 L |
| 1.70 | Capital and Operating cost of IT based equipments that includes GPS machine Mechanical Road Sweepers and other vehciles, Face Recognition Bio-metric attendance machine etc. (Lumpsum monthly cost to be quoted) | 12 | Months | 8,10,000 ₹8.1 L | 5,99,876.04 ₹6.0 L | 5,37,300 ₹5.4 L | 6,00,000 ₹6 L | 5,40,000 ₹5.4 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
30 Mar 2026, 4:00 pmClosed
EE Sanitation
4th floor conference hall icomc tower satyanagar,BMC
M Mechanical Sweeping of and Allied Cleaning Select Road Stretches under Package III of Bhubaneswar Municipal Corporation
2026_ORULB_126852_1
EE/SAN/12393 Dated-02.03.2026
National Competitive Bid
Miscellaneous Works
75 days
ICOMC TOWER, SATYANAGAR, BHUBANESAWR
As per RFP
3 documents required · 3 mandatory
₹10,000
₹5 L
Yes
4th floor conference hall icomc tower satyanagar
15 Apr 2026
3 Mar 2026
30 Mar 2026
3 Mar 2026
30 Mar 2026
3 Mar 2026
3 Mar 2026 - 15 Mar 2026
6 Mar 2026
Sweeping of assigned roads with Mechanical Road Sweeper in compliance to detailed technical specifications in RFP document and transportation of silt/waste so gerenated from sweeping and collected in hopper to designated site. (Annual Quantity worked out considering 208.40 Lane Kms road length to be swept for minimum 350 days in a year)
Wall to Walll Sweeping,Litter picking,GPS & TPW of road berms and footpath of entire assigned road stretch excluding road portion cleaned by Mechanical Road Sweeper-Non-commercial portion along with transportation of generated waste in segregated manner using LCV vehicle to the designated location. (Annual Quantity worked out considering LHS+RHS Road length of 117.43 Kms out of which 40% assumed as Commercial portion i.e. 46.97 Kms for two times cleaning)
Bush Cutting by engaging 10 nos. of labours and minimum 4 nos. of Bush Cutting machine along with transportation of Bush Cutting waste to the designated location using open LCV vehicle (Annual Quantity worked out considering bush cutting for 2 days in a week i.e. 96 days of operation in a year multiplied with 10 nos. of labours. The unit rate to be adjusted accordingly so as to cover the cost of transportation, engagement of supervisor and also the capital and operation cost of the Bush Cutting machine)
Engaging labours for manual cleaning of signage, street furniture and statue including cleaning of bushes/grass/litters in the surrounding area within minimum 10 meters radius of any statue and transportation of waste to the designated site (Annual Quantity worked out considering bush cutting for 2 days in a week i.e. 96 days of operation in a year multiplied with 10 nos. of labours)
Mechanised cleaning of signage, street furniture and statue using 1 no. of bolero pick up mounted mechanised water sprinkler with hand gun for cleaning of statues and signage for 2 times in a week (Annual Quantity worked out considering 96 days of operation in a year. rate to be quoted for per day of operation of 8 hours)
Deployment of Push Carts and Workmen accessories such as PPE kit, Apron, Uniform,Gum boot, Gloves etc (Lumpsum monthly cost to be quoted)
Capital and Operating cost of IT based equipments that includes GPS machine Mechanical Road Sweepers and other vehciles, Face Recognition Bio-metric attendance machine etc. (Lumpsum monthly cost to be quoted)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_583777.pdf
techsummary_583777.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
RFP.pdf
Tender Documents • 1.58 MB
BOQ_583777.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid