Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrQualified 1 KHARASIMALU BISWANATH CHARIALI BISWANATH SONITPUR ASSAM 784176 UDYAM AS 28 0000178 | BISWANATH | ASSAM | 784176 | ₹4.7 Cr | L1 | Qualified MSE, MII, Category: General |
| 2 | L2₹4.7 CrQualified | ₹4.7 Cr | L2 | Qualified MSE, MII, Category: General |
| 3 | L3₹4.8 CrQualified | ₹4.8 Cr | L3 | Qualified MSE, MII, Category: General |
Updated dates
Tender Value
Refer Docs
EMD Value
₹14.4 L
Closing Date
2 May 2026, 6:00 pmClosed
FORCE PRESERVATION BKR
9235602
GEM/2026/B/7455697
Two Packet Bid
Factory made Precast Box CellS, industry made Precast Concrete Elements, B of of 2m X 2m X 1m, Heig
Assam; Kamrup
Total value wise evaluation
BOQ
7 documents required · 7 mandatory
3 yrs
₹2.4 Cr
₹19.2 Cr
80%
EPO, 10 Engineer Regiment, Department of Military Affairs, Indian Army, Ministry of Defence, (P C Piyoosh)
₹14.4 L
6 May 2026
19 Apr 2026
2 May 2026
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Factory made Precast Box CellS, industry made Precast Concrete Elements, B of of 2m X 2m X 1m, Height 2.8 m from bottom to top of Arch Internal, 200 mm Wall Thickness | Factory made Precast Box CellS, industry made Precast Concrete Elements, B of of 2m X 2m X 1m, Height 2.8 m from bottom to top of Arch Internal, 200 mm Wall Thickness | 144 | Nos | Epo@10 | 90 |
| 2 | Cost Cells Sq without Arch, 6 Toilet of 2x2x1.50m Precast Factory Vertically Casted with Dry Cast Tech, Hydraulically Pressed all Side vibrated for Max Str M 40 Gde | Cost Cells Sq without Arch, 6 Toilet of 2x2x1.50m Precast Factory Vertically Casted with Dry Cast Tech, Hydraulically Pressed all Side vibrated for Max Str M 40 Gde | 24 | Nos | Epo@10 | 90 |
| 3 | Cement OPC 43 Grade packed in HDPE bag each 50 kg wt conforming to IS 8112 to 1989 Make Birla Gold or Ambuja or Ultratech or ACC or JK or Dalmiya | Cement OPC 43 Grade packed in HDPE bag each 50 kg wt conforming to IS 8112 to 1989 Make Birla Gold or Ambuja or Ultratech or ACC or JK or Dalmiya | 360 | Bags | Epo@10 | 90 |
| 4 | Course sand free from vegetation | Course sand free from vegetation | 28 | Cum | Epo@10 | 90 |
| 5 | Stone Aggregate | Stone Aggregate | 60 | Cum | Epo@10 | 90 |
| 6 | Water Proofing Compound 20 Ltr confirming to IS 2645 2003 of make Pidilite, Dr.Fixit, Fevicol | Water Proofing Compound 20 Ltr confirming to IS 2645 2003 of make Pidilite, Dr.Fixit, Fevicol | 20 | Drum | Epo@10 | 90 |
| 7 | Quick Setting Compound 20 ltr of make Pidilite, Dr. Fixit, Fevicol | Quick Setting Compound 20 ltr of make Pidilite, Dr. Fixit, Fevicol | 20 | Drum | Epo@10 | 90 |
| 8 | Rolling and Stone Machinary Cost at PCC Level, including Compaction and Leveling Cost | Rolling and Stone Machinary Cost at PCC Level, including Compaction and Leveling Cost | 320 | Cum | Epo@10 | 90 |
| 9 | Geo Textile of 200 GSM to be used above PCC to prevent passage of Water above PCC | Geo Textile of 200 GSM to be used above PCC to prevent passage of Water above PCC. | 600 | Sqm | Epo@10 | 90 |
| 10 | SRF Membrane Cost 500 per 700 Sheet | SRF Membrane Cost 500 per 700 Sheet. | 1,600 | Sqm | Epo@10 | 90 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9235602.pdf
GEM_BID
rfpfpb_2026-04-19-20-25-58_893d9bd1a3cd8cf786bd79f4e13013c2.pdf
BOQ
boq_item_sample_file__2026-04-19-20-25-58_8dba10d9c879588396129d25657bf04a.csv
BOQ
OTHER
gtc.pdf
OTHER
GEM_OTHER • 4.91 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid