Loading…
Loading…
Tender Value
₹20.2 L
EMD Value
₹40,500
Closing Date
27 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Deposit Work
Above/Below/Par
TENDER
42 conditions · 6 needing a document upload
Valid copy of PAN and GSTIN needs to be furnished along with the documents.
Tender Form (First Sheet) as per 'Annexure-I'
For Sole Proprietorship firm a)Affidavit as per 'Proforma I'. b)Special power of Attorney as per proforma given in 'Proforma II' to be submitted by sole proprietor firm duly notarized.(Not required if tender documents are submitted by proprietor himself)
For Partnership firm a)Self/Notary attested copies of Partnership deed. b)Special Power of Attorney as per proforma given in 'Proforma-III' to be submitted by Partnership firm. (Not required if one or more partners are authorized in Parternership deed to sign on behalf of the firm.)
For Limited Company a) Copy of Memorandum & Articles of Association of Company. b)Self /Notary attested copy of resolution passed by Board of Directors authorizing its Director/Employee to deal with tender on behalf of company. c) Attested copy of Notarized Special Power of Attorney including ratification clause duly signed by person authorized by the company.(D) A copy of Certificate of Incorporation
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The total cost is including GST. Hence tenderer are advised to quote the tender inclusive of GST
All the dismantled material should be handed over to E.I.C. at site with proper challan.
All materials which will be utilized for this work shall confirm to relevant IS specifications.
All the materials should be got inspected and approved by the competent representative of Sr.DEE/G/RNY & Engineer in Charge should be contacted before execution of work.
The contractor(s) have to supply all petty stores, which may be required for successful commissioning of the equipments, but not mentioned in the schedule of works. The rate quoted against each item shall be inclusive of those petty stores.
Successful Tenderer shall produce & hand over test and Guarantee certificate issued by manufacturer of all the equipment/ Component at the time of supply to Railways, failing which bill of the work will not be passed.
Joint Test reports with EIC for earth resistance to be submitted with submission of bill.
The Contractor shall execute the work to entire satisfaction of the site Engineer, SR DEE/RNY or his representative.
All Switch, socket, power unit, ceiling rose, holder, AC starter etc make should be of Make :- Crompton Kolors(Kany Kom)/ Anchor/Richa/Havell's/C&S/Legrand.
Switchgear like MCCB,MCB, RCCB , etc. should be make of BCH/C&S/ABB/Geco/ Legrand/ Lauritz Knudsen/Indo Asean.
The LED fittings for Street light and tube light make should be of Phillips/Bajaj/ kolors/ C&S.
GI Tubular/Octagonal pole should be of Make:- J K Industries/Nezone/Bengal pole corporation/Ambica Tube Industries(ATI)/Utkarsh.
GI pipe should be of Make:-Jindal/Bansal/Tata/Nezone
HDPE pipe should be of Make:-AJA Plus/Swastik/Quotone/North East Communication.
Ceiling/Exhuast Fan should be of Make:- Bajaj/Crompton/Orient/Usha.
GO/DO/Isolator Make should be of:- Atlas Electricals/CPL/Oblum/Raychem/RRI.
PVC Casing & Caping should be make of Presto Plast/ Presto Teak/Richa.
Flexible Wire, PVC Cable Make should be of Crompton/Polycab/Richa/Kolors/Anchor /BCH/KEI/Finolex.
AC make should be of Samsung/Voltas/Blue star/LG/Havell's/Godrej
Polymers Insulators Make should be of Atlas Electricals/CPL/ABI/Elpro/RRI.
XLPE Cable should be of Make:-Havell's/ Richa/ Polycab/ Kolors/ Anchor/BCH/ KEI/ Finolex.
Colour coding should be used in all wiring. For Positive- Red, Negative - Black & Earth - green.
The drawing of panel board should be approved by the competent authority before fabrication and commissioning.
Payment Clause:Payment 70/80% of the payment shall be made to the contractor/firm against the supply of material of the work.
Tenderer should submit the documents as per the Annexure-'A' attached at the time of submission of bill.
Successful contractor must follow guidelines as per extant rules of IR Shramik Kalyan Portal.
Penalty :- In case of any damage causes to railway materials at the time execution of work, penalty will be imposed as per railway norms otherwise the same should be rectified as per original.
No work can be carried out without availability of site supervisor. if site supervisor is not available , then work will be stopped and penalty will be imposed as per GCC.
Electrical works in connection with at NBQ- (i) Construction of Relay room at A cabin(ii) Construction of relay room, SM room, S&T Maintenance room, staircase & Fencing at West cabin (iii) Construction of ASM & battery room at A cabin.
RNY-EL-T-06-2026-27
RNY-EL-T-06-2026-27
Open
Works - General
180 Days
Kamrup, Assam
₹0
₹40,500
27 Jul 2026
3 Jul 2026
13 Jul 2026
230 items across 4 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 7,52,144.19 | ||
| — | 16.00 | — | — | ||
| Supply and surface wiring of light/FL point by PVC insulated & un-sheathed FRLSH multi strand copper single core 1.5 sq.mm cable through PVC casing & caping including ceiling rose. Cable connection to be done through 6 A flush type controlling switch installed in suitable size PVC board & connected by Cu flexible wire from ceiling rose to fittings as per direction of EIC at site. | — | — | — | 4,032.8 | |
| — | 4.00 | — | — | ||
| Supply and surface wiring of ceiling fan point by PVC insulated & un-sheathed FRLSH multi strand copper single core 1.5 sq.mm cable through PVC casing & caping including ceiling rose. Cable connection to be done through 6 A flush type controlling switch including 5 point electronic regulator installed in suitable size PVC board with earth continuity by 1.0 sq.mm multistrand copper cable & connected by Cu flexible wire from ceiling rose to fan as per direction of EIC at site. | — | — | — | 2,177.04 | |
| — | 4.00 | — | — | ||
| Supply and surface wiring of exhaust fan point by PVC insulated & un-sheathed FRLSH multi strand copper single core 1.5 sq.mm cable through PVC casing caping including ceiling rose. Cable connection to be done through 6 A flush type controlling switch including suitable size PVC board with earth continuity by 1.0 sq.mm multistrand copper cable & connected by Cu flexible wire from ceiling rose to fan as per direction of EIC at site. | — | — | — | 1,042.68 | |
| — | 4.00 | — | — | ||
| Supply of of 1200mm sweep, BEE star rated - 5 star rated capacitor type ISI marking ceiling fan with 450mm down rod, canopy and all accessories as per direction of EIC at site. | — | — | — | 6,963.92 | |
| — | 4.00 | — | — | ||
| Fixing and commissioning of ceiling fan 1200 mm sweep with suitable size GI pipe, MS hook, clamp, nut & bolts arrangements as required as per direction of EIC at site (Ceiling fan will be supplied by Railway) | — | — | — | 142.76 | |
| — | 4.00 | — | — | ||
| Supply, testing and fixing of 300 mm sweep exhaust fan complete by cutting wall, masonary work as required and fixing by suitable nuts and bolts arrangement as per direction of EIC at site. | — | — | — | 7,359.2 | |
| — | 4.00 | — | — | ||
| Supply and surface wiring of 6A 5 pin plug point by PVC insulated & un-sheathed FRLSH multi strand copper single core 2.5 sq.mm cable through PVC casing & caping, with earth continuity by single core 1.0 sq mm copper cable including suitable size PVC board. Cable connection to be done through 6 A flush type controlling switch , socket installed in PVC board hylum sheet on top and as per direction of EIC at site. | — | — | — | 1,392 | |
| — | 1.00 | — | — | ||
| Supply and surface wiring of 16 A, 6-pin Plug point/geyser point by PVC insulated and un-sheathed FRLS multi stranded copper cable, single core 4.0 sq.mm with earth continuity by 1.0 sq.mm multistand copper cable through PVC casing & caping including suitable size PVC board. Cable connection to be done through 16 A flush type controlling switch, 16A socket installed in board and as per direction of EIC at site. | — | — | — | 601.01 | |
| — | 4.00 | — | — | ||
| Supply, installation, testing & commissioning of 2.0 ton 3 star rated split AC including indoor, outdoor unit compressor rotary type suitable for operation on 230volt/1-ph/50 Hz and copper pipe line along with insulation, wal fixing arrangements and other accessories for connecting indoor unit to outdoor unit with copper piping as per direction of EIC at site. | — | — | — | 1,64,245.64 | |
| — | 4.00 | — | — | ||
| Surface wiring of AC pointcomplete unit of single phase motor starter(16 A-25A) & 25 A socket with 4 module plate and surface box (5 hp)by single core FRLS PVC insulated and unsheathed 4 sq mm stranded copper cable through suitable size PVC casing caping to be drawn from DB and fixed on wall/ceiling by suitable with earth contunity by 1.0 sq mm stranded copper cable including 4 module surface mounted unbreakable gang box as per the direction of EIC at site. | — | — | — | 3,099.84 | |
| — | 200.00 | — | — | ||
| Supply & wiring of earth continuity through the circuit of Main line/ Submain line by 1.0 sq mm PVC insulated & unsheathed, single core,multi stranded FRLS copper conductor cable through PVC Casing capinge as per direction of EIC at site. | — | — | — | 2,062 | |
| — | 200.00 | — | — | ||
| Supply & wiring of Main line/ Submain line by PVC insulated & unsheathed, single core, multi stranded FRLS copper conductor cable 2.5 sq.mm through PVC casing caping with controlling switch as per direction of EIC at site. | — | — | — | 5,018 | |
| — | 100.00 | — | — | ||
| Supply & wiring of Main line/ Submain line by PVC insulated & unsheathed, single core, multi stranded FRLS copper conductor cable 4.0 sq.mm through PVC casing caping with controlling switch as per direction of EIC at site. | — | — | — | 3,805 | |
| — | 50.00 | — | — | ||
| Supply & wiring of Main line line by PVC insulated & unsheathed, single core, multi stranded FRLS copper conductor cable 6.0 sq.mm through consealed PVC heavy gayge pipe with controlling switch as per direction of EIC at site. | — | — | — | 2,839 | |
| — | 100.00 | — | — | ||
| Supply & fixing of PVC casing caping 25x12mm size by surface of wall for drawing of main/submain line as required of EIC at site | — | — | — | 5,093 | |
| — | 2.00 | — | — | ||
| Supply, installation, testing & commissioning of SPN distribution board 8 way double door metal SPN DB consisting 40A, MCB DP - 1 no, 20A, MCB DP - 2 nos, 6A, MCB SP - 2 nos with enclosure and necessary fixing arrangements as per direction of EIC at site. | — | — | — | 10,302.48 | |
| — | 2.00 | — | — | ||
| Supply, testing & commissioning of 25A, 2 pole, 30mA, 10kA RCCB as per direction of EIC at site. | — | — | — | 4,778.62 | |
| — | 16.00 | — | — | ||
| Supply, installation, testing & commissioning of 18/20W LED tube light fitting with polycarbonate housing with THD less than 20% and surge protection 1.5KV 6000K (4 ft) complete with driver circuit etc and all accessories as per direction of EIC at site. Lumens out put should be not less than 100 Lumens/watt, LED should be as per LM-80/IS: 16105. LED driver's efficiency should be minimum 90%, Power factor of complete fitting should be greater than 0.90, Input operating voltage: 140V to 277V AC and driver should be as per IEC: 62384/IS:16104. The LED fittings should be warranted for 5 years. | — | — | — | 5,265.76 | |
| — | 2.00 | — | — | ||
| Supply and erection of earthing by made of B class GI pipe of 3000 mm length, 50 mm diameter & 3.6 mm thickness.The GI Strip ( should be welded with the earth pipe. Thepipe is provided with a tapered casing at the lower end in order to facilitate the driving. A funnel with perforated plate to be provided at the top of the pipe for pouring water during dry season to have an effective earth value.The connecting conductor from earth electrode to the distribution panel board should not be thinner than 8 SWG GI wire to carry the fault current. The earth fill shall be of homogeneous layer of common earth soil. Where soil restivity is high, earth restivity enhancing material may be used, Bentonite or similar earth enhancing material may be used in rocky soil. Earth box to be precasted RCC and The values of earth resistance measured should be painted on the Earth pit cover/lid along with the date of measurement. As per Drg. No. DRG NO:PCEE/ELG/DRG/2024/1 dated 30.09.2024 & as perTechnical circular no. EL/PS/2024/1 (EARTHING SYSTEM). | — | — | — | 2,831.2 | |
| — | 200.00 | — | — | ||
| Laying of above LT XLPE insulated armoured aluminium cables as per instruction of site engineer (Cable should be supplied by Railway) | — | — | — | 2,582 | |
| — | 180.00 | — | — | ||
| Excavation of trench of size 60 Cm width x 90 Cm depth for laying of CI/GI pipe/cable with sand/brick/clamp protection as required and filling of earth / ramming as required as per direction of EIC at site. | — | — | — | 2,286 | |
| — | 174.00 | — | — | ||
| Supply and laying of GI pipe 50 mm dia thickness not less than 3.6 mm for cable protection with necessary bends, sockets, etc partly through underground and partly through trench as per direction of EIC at site. | — | — | — | 97,344.3 | |
| — | 50.00 | — | — | ||
| Horizontal machine borring under track crossing at a depth of 2.0 mtr below GL including required size HDPE pipe observing all necessary safety for human life and others movement as per direction of engineer at site. | — | — | — | 2,83,400 | |
| — | 4.00 | — | — | ||
| Supply, installation, testing & commissioning of 25 watt street light fittings complete including all accessories as per direction of EIC at site (Similar to model no LSTS-25-CDL). Lumens out put should be of 100 Lumens/watt, LED should be as per LM-80/IS: 16105. LED driver's efficiency should be minimum 90%, Power factor of complete fitting should be greater than 0.90, Input operating voltage: 140V to 277V AC and driver should be as per IEC: 62384/IS:16104. The LED fittings should be warranted for 5 years. | — | — | — | 7,197.56 | |
| — | 6.00 | — | — | ||
| Supply,Carrying, loading/unloading, muffing and erection of Galvanised tubular pole 9.0 mtr long , Type-410 SP-33 having weight 164 kgs, 5.00/2.0/2.0 mtr having sectional outer dia 165.1/139.7/114.3 mm and sectional thickness 5.40/4.50/3.65 mm respectively as per IS:2713-1980 including suitable size base plate & cap .The work includes digging the pit to 1/5th of the pole height. Execution of CC foundation work of size 45cmx45cm in ratio 1:2:4 by cement,sand and chips of size 19 mm and down upto full depth & 1ft above the GL as per direction of EIC at site. | — | — | — | 76,911.24 | |
| — | 2.00 | — | — | ||
| Supply and erection of galvanized stay set for 11 KV OH line complete with 20 mm dia, 1.8 mtrs long stay rod, anchor plate of size 23 cm x 23 cm x 6 mm thick, 16 mm dia turn buckle, thimble, stay clamp, 7/10 mm SWG GI stay wire & Strain insulator etc. in CC foundation with 1:3:6 ratio including excavation and refilling. | — | — | — | 1,377.48 | |
| — | 12.00 | — | — | ||
| Supply, installation and commissioning of ball and socket type HT 11 KV Polymeric Composite disc insulator minimum creep age distance 450mm, section length 430mm, rated mechanical tensile load 70KN, Wet power freq 1 min, withstand voltage 48KV, Dry lighting impulse withstand voltage 100KV including all accessories for fixing on the bracket with strain clamps, nuts, bolts & washers etc. as per IEC 1109, ISO 9001 : 2000. (2 nos in a set). | — | — | — | 11,445.6 | |
| — | 18.00 | — | — | ||
| Supply, installation and commissioning of 11 KV HT Polymeric Composite pin insulator size 146mm, minimum failing load 5KN, Wet power freq 1 min, withstand voltage 35KV(RMS), Dry lighting impulse withstand voltage 75Kvp(+ve), including all accessories for fixing on the bracket with nuts, bolts & washers etc. as per IEC 1109, ISO 9001 : 2000. (2 nos in a set). | — | — | — | 6,767.46 | |
| — | 1.00 | — | — | ||
| Supply, installation, commissioning and replacement of HT 11 KV GO switch 200 amps, triple pole and each pole consist of galvanized steel base, HT insulator for replacement of the existing G.O. for the feeders. | — | — | — | 7,534.14 | |
| — | 1.00 | — | — | ||
| Supply, installation, commissioning and replacement of HT 11 KV DO fuse (channel type) complete with all accessories for replacement of the existing G.O. for the feeders. | — | — | — | 4,700.9 | |
| — | 4.00 | — | — | ||
| Supply, fitting and fixing of GI Channel to be fixed on pole with suitable size GI clamp made of 50X5 mm, MS flat with 50X16 mm bolts, nuts and washers etc. The channel to be painted by 2-coats of red oxide as primer and 2 coats of Aluminium paint as final coat as per direction of EIC at site of size - 75x40x40 x6 .0 mm, 2.2 mtr long. | — | — | — | 3,400.56 | |
| — | 4.00 | — | — | ||
| — | 4.00 | — | — | ||
| — | 2.00 | — | — | ||
| — | 2.00 | — | — | ||
| — | 1.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TD-062026-27.pdf
ATTACHMENT
ACS-8_2.pdf
ATTACHMENT
GCC_April-2022_2022.pdf
ATTACHMENT
GCCUpdateduptoACS-11_1.pdf
ATTACHMENT
JPO8.5.24-CablediggingworksNFR.pdf
ATTACHMENT
ACS-09.pdf
ATTACHMENT
ACS-10.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
TechCircularwithDrgforEarthingandCableLayingUG.pdf Drawing for pipe earthing and cable lay
ATTACHMENT
AnnexureNEW.pdf
ATTACHMENT
TechCircularwithDrgforEarthingandCableLayingUG.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .