| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.2 L+₹11,188.84 (3.64%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DHARAM PAL SINGH THEKEDAR L1 | M/s Rakesh Kumar Thekedar L2 |
|---|---|---|---|---|---|
| 1.00Silt clearance And Srcaping work Of Bandi Dy. From 0.000 To Km. 08.180. | |||||
| 1.01 | Scrapping internal section of existing channel i.e. Left & Right Bank Side Slopes Of Dy with Silt Upto 5cm. | 23,340 | Sqm | 4 ₹93,360 | 3 ₹70,020 Lowest |
| 1.02 | Silt clearance/Trench digging including lift up to 1.50 meter & lead up to 6m by JCB/equivalent capacity 60 cum/hour i.e. including cost of Driver/Assistant Driver, POL, Maintenance of Machine, Contractor Profit, Taxes Etc. and also Including Full Dressing of earth. | 5,229.35 | Cum | 27 ₹1,41,192.45 Lowest | 34 ₹1,77,797.9 |
| 1.03 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 2,076.61 | Cum | 35 ₹72,681.35 | 34 ₹70,604.74 Lowest |
Tender Value
Refer Docs
EMD Value
₹48,000
Closing Date
5 Oct 2026, 10:00 amClosed
Executive Engineer
Office Executive Engineer Irrigation Division Agra Road Etah
silt clearance And Scraping work of Bandi dy From Km. 0.000 To km. 08.180.
2026_UPIDC_1188821_2
02/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
30 days
Etah
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹48,000
12 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Silt clearance And Srcaping work Of Bandi Dy. From 0.000 To Km. 08.180. | |||||
| 1.01 | Scrapping internal section of existing channel i.e. Left & Right Bank Side Slopes Of Dy with Silt Upto 5cm. | 23,340 | Sqm | 1.25 | ₹29,175 |
| 1.02 | Silt clearance/Trench digging including lift up to 1.50 meter & lead up to 6m by JCB/equivalent capacity 60 cum/hour i.e. including cost of Driver/Assistant Driver, POL, Maintenance of Machine, Contractor Profit, Taxes Etc. and also Including Full Dressing of earth. | 5,229.35 | Cum | - | - |
| 1.03 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 2,076.61 | Cum | 100 | ₹2,07,661 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_2244571.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .