Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Technical | +0.00% | ₹1.4 L | L1 | Admitted-Technical Responsive |
| 2 | L2₹1.5 L+₹1,606.61 (1.11%)Admitted-Technical | +1.11% | ₹1.5 L+₹1,606.61 (1.11%) | L2 | Admitted-Technical Responsive |
Tender Value
₹1.7 L
EMD Value
₹3,414
Closing Date
3 Apr 2026, 2:00 pmClosed
Ex. Engineer R and B Division Shopian
Shopian
Construction of Girls Toilet at Middle School Rakhama
2026_PWDJK_304085_1
84/8972-81/RnB/SPN/e-tender of 21-02-2026
Open Tender
Civil Works
Percentage
20 days
Shopian
Please refer Tender documents.
5 documents required · 5 mandatory
₹200
Ex. Engineer R and B Division Shopian
₹3,414
8 Apr 2026
21 Feb 2026
4 Apr 2026
22 Feb 2026
3 Apr 2026
22 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by Manual/mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil : | - | Cum | 0.6 | - |
| 2 | Providing and laying stone soling duly hand packed in maintaning level and section including all carriages complete | 1 | Cum | 0.8 | ₹0.8 |
| 3 | Providing and laying in position cement concrete 1:4:8 (1
Cement:4 Corase sand: 8 grade stone aggregate 40 mm
nominal size crushed including curing but excluding the
cost of centring and shuttering. All work upto plinth level
including all carriages complete | 1 | Cum | 0.2 | ₹0.2 |
| 4Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centering, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriages complete | |||||
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including all carriages complete | - | Cum | 0.8 | - |
| 6 | Centering and shuttering (fresh kit ply) including strutting, propping etc. and removal of form work including applying of shuttering oil:Suspended floors, roofs, landings, balconies and access platforms. | - | Sqm | 0.6 | - |
| 7 | Centering and shuttering (fresh kit ply) including strutting, propping etc. and removal of form work including applying of shuttering oil: Foundations, footings, bases of columns | 1 | Sqm | 0.8 | ₹0.8 |
| 8 | Reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all
complete Thermo-Mechanically Treated bars of grade Fe 500D or more. Inculding all carriages complete | 1 | Kgs | 0.8 | ₹0.8 |
| 9Brick work with common burnt clay bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 ( 1 cement : 6 fine sand) including loading unloading etc including all carriages complete | |||||
| 10 | Brick work with common burnt clay bricks of class designation 7.5 in Super structure above plinth level upto floor V level in Cement mortar 1:6 ( 1 cement : 6 fine sand) including loading unloading etc including all carriages complete | - | Cum | 0.8 | - |
stage.html
html • 0.02 MB
tech_eval.pdf
finance_987774.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_987774.xls
BOQ • 0.33 MB
d.pdf
PDF • 0.76 MB
fr.pdf
PDF • 0.76 MB
d.pdf
PDF • 0.76 MB
Extension8.pdf
PDF • 0.76 MB
Extension7.pdf
PDF • 0.76 MB
E.pdf
PDF • 0.76 MB
Extension1.pdf
PDF • 0.76 MB
Extension4.pdf
PDF • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .