Loading…
Loading…
Tender Value
₹21.3 L
EMD Value
₹42,510
Closing Date
4 Aug 2026, 5:00 pm3d left
ANKIT VASHISHT
MC CHARKHI DADRI
Construction of boundary wall of mc land in MC colony
2026_HRY_537045_1
20268790EBFC 848B 46EC BA44 158930AF85B2341ULB
Open Tender
Civil Works
Works
180 days
Charkhi Dadri
2 documents required · 2 mandatory
₹1,000
₹42,510
Yes
28 Jul 2026
28 Jul 2026
5 Aug 2026
28 Jul 2026
4 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR Item 6.1.1-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
HSR Rate(Rs.) 3975.00 Through Rate | - | cum | 3,975 | - |
| 2 | HSR Item 10.41.1-Providing and fixing of 40 mm thick rubbed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints 3 mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar. 1. Red sand stone
HSR Rate(Rs.) 569.00 Through Rate | - | Sqm | 569 | - |
| 3 | HSR Item 7.22.2-Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in
: 2. Cement mortar 1:6 (1 cement : 6 coarse sand)
HSR Rate(Rs.) 4488.00 Through Rate | 1 | cum | 4,488 | ₹4,483.51 |
| 4 | HSR Item 4.14.1-Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil.
HSR Rate(Rs.) 83.00 Through Rate | - | cum | 83 | - |
| 5 | HSR Item 11.5.3-12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand)
HSR Rate(Rs.) 113.00 Through Rate | 0.6 | Sqm | 113 | ₹67.69 |
| 6 | HSR Item 10.43-Extra for Kota stone/ sand stone in treads of steps and risers using single length up to 1.05 metre.
HSR Rate(Rs.) 14.00 Through Rate | - | Sqm | 14 | - |
| 7 | HSR Item 13.29.2-Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
HSR Rate(Rs.) 83.00 Through Rate | - | Kg. | 83 | - |
| 8 | HSR Item 7.21.2-Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) HSR Rate(Rs.) 3968.00 Through Rate | 0.6 | cum | 3,968 | ₹2,380.8 |
| 9 | HSR Item 10.100.2-Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth.
HSR Rate(Rs.) 1863.00 Through Rate | 1 | cum | 1,863 | ₹1,861.14 |
| 10 | HSR Item 6.33.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps.
Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more
HSR Rate(Rs.) 66.00 Through Rate | 1 | Kg. | 66 | ₹65.93 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_616188.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].