Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance AFCONS HOUSE 16 SHAH INDUSTRIAL ESTATE VEERA DESAI ROAD AZADNAGAR ANDHERI W MUMBAI MAHARASHTRA INDIA400053 | MUMBAI SUBURBAN | MAHARASHTRA | 400053 | Admitted-Finance |
| 2 | Admitted-Finance 2 ARYA NAGAR NARMADA ROAD JABALPUR 482001 | JABALPUR | JABALPUR | MADHYA PRADESH | 482001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 0 NARA MEERUT ROAD MUZAFFARNAGAR UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | Admitted-Finance |
| 5 | Admitted-Finance S 2 TECHNOCRAT INDUSTRIAL ESTATE BALANAGAR HYDERABAD 500 037 TELANGANA INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500037 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1.8 Cr
Closing Date
7 Dec 2020, 2:00 pmClosed
RAJESH SANGIA
TOYO ENGINEERING INDIA PVT LTD, Toyo Technology Centre, 71, Kanjur Village Road, Kanjurmarg (East), Mumbai 400 042.
EPCC PACKAGE (EPCC-03) FOR NEW SULPHUR RECOVERY UNIT (SRU), TAIL GAS TREATMENT UNIT (TGTU), NEW AMINE REGENERATION UNIT (ARU), NEW SOUR WATER STRIPPER UNIT (SWS), SULPHUR YARD AND ALLIED FACILITIES FOR BARAUNI REFINERY CAPACITY EXPANSION (TO 9 MMTPA)
2020_REFHQ_121648_1
IBCE-6373-C00-PJM-TEN-EPCC-03
Global Tenders
Lump Sum TurnKey
750 days
BARAUNI REFINERY
REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹1.8 Cr
Yes
NEW DELHI / ONLINE VC
19 Apr 2021
8 Aug 2020
8 Dec 2020
8 Aug 2020
7 Dec 2020
24 Nov 2020
8 Aug 2020 - 11 Sept 2020
4 Sept 2020
Amount
Project Management, Residual Process Design, Detailed Engineering (including HAZOP/ SIL study), procurement, fabrication, inspection, transportation of all the equipment’s/ materials to work site, storage, assembly, erection, installation, construction and testing of all above mentioned facilities, including statutory approvals, and to achieve mechanical completion, pre-commissioning, commissioning, performance guarantee test run (PGTR) and handing over of all the facilities to Client including supply of mandatory/ recommended spares based on FEED Package provided by Toyo Engineering India Pvt .Ltd. (TOYO) of NEW SULPHUR RECOVERY UNIT (SRU), TAIL GAS TREATMENT UNIT (TGTU), NEW AMINE REGENERATION UNIT (ARU), NEW SOUR WATER STRIPPER UNIT (SWS), SULPHUR YARD AND ALLIED FACILITIES FOR CAPACITY EXPANSION (TO 9.00 MMTPA) PROJECT OF BARAUNI REFINERY OF INDIAN OIL CORPORATION LIMITED AT BARAUNI, BIHAR
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lump-sum Price for Supply Portion for completion of Scope of Work as per Bidding Document
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
ENGINEERING PRICE (RESIDUAL PROCESS DESIGN AND DETAILED ENGINEERING OF EPCC-03 AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT)
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
LUMPSUM PRICE FOR CONSTRUCTION PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
TOTAL OF ENGINEERING AND CONSTRUCTION PRICE [1 +2]
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for ANALYZERS of all types (including Gas Chromatographs) as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for MMS (if applicable) as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
UTILITY GUARANTEES FOR ARU III, SWS II, SRU III & IV UNIT AS PER BIDDING DOCUMENT
GUARANTEED TOTAL POWER CONSUMPTION FOR ARU III, SWS II, SRU III & IV UNIT [AS IDENTIFIED AT SR. NO. 1 to 23 OF TABLE-A OF SCC ANNEXURE A-X(ii))
GUARANTEED TOTAL POWER CONSUMPTION FOR ARU III UNIT [AS IDENTIFIED AT SR. NO. 1 OF TABLE-B OF SCC ANNEXURE A-X(ii))
Megha engineering and Infrastructures Limited
Chemie Tech DMCC
AFCONS Infrastructure Limited
Thermax Limited
Megha engineering and Infrastructures Limited
Chemie Tech DMCC
AFCONS Infrastructure Limited
Thermax Limited
Megha engineering and Infrastructures Limited
Thermax Limited
AFCONS Infrastructure Limited
Chemie Tech DMCC
ISGEC Heavy Engineering Limited
Chemie Tech DMCC
AFCONS Infrastructure Limited
Thermax Limited
Megha engineering and Infrastructures Limited
Chemie Tech DMCC
ISGEC Heavy Engineering Limited
AFCONS Infrastructure Limited
Thermax Limited
Megha engineering and Infrastructures Limited
ISGEC Heavy Engineering Limited
AFCONS Infrastructure Limited
Thermax Limited
Bidder Name
AFCONS Infrastructure Limited
ISGEC Heavy Engineering Limited
Megha engineering and Infrastructures Limited
Chemie Tech DMCC
Thermax Limited
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid