Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 CrAdmitted-Finance RANI KHINDA SASON DIST SAMBALPUR ODISHA | SASON | SAMBALPUR | ODISHA | 768200 | +0.00% | ₹7.9 Cr | L1 | Admitted-Finance |
| 2 | L1₹7.9 CrAdmitted-Finance AT PO MODIPADA DIST SAMBALPUR PIN 768002 | SAMBALPUR | ODISHA | 768002 | +0.00% | ₹7.9 Cr | L1 | Admitted-Finance |
| 3 | L1₹7.9 CrAdmitted-Finance NEAR MEGHANA BIDI OFFICE WARD NO 29 PO BUDHRAJA 768004 DIST SAMBALPUR | SAMBALPUR | SAMBALPUR | ODISHA | 768004 | +0.00% | ₹7.9 Cr | L1 | Admitted-Finance |
| 4 | L1₹7.9 CrAdmitted-Finance | +0.00% | ₹7.9 Cr | L1 | Admitted-Finance |
| 5 | L1₹7.9 CrAdmitted-Finance | +0.00% | ₹7.9 Cr | L1 | Admitted-Finance |
Tender Value
₹7.9 Cr
EMD Value
₹7.9 L
Closing Date
17 Jul 2026, 5:00 pmClosed
Circle Officer
RURAL WORKS CIRCLE , SAMBALPUR
Construction of H.L. bridge over Kharla Nallah on Ghosa to Thakumiktimal road
2026_CERWI_134568_1
Bridge Tender Online RWCSBP-12/2026-27
Open Tender
Civil Works - Bridges
Percentage
450 days
Kuchinda
2 documents required · 2 mandatory
₹10,000
₹7.9 L
Yes
1 Sept 2026
6 Jul 2026
18 Jul 2026
6 Jul 2026
17 Jul 2026
6 Jul 2026
6 Jul 2026 - 15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting in all kind of soil within 50m initial leads &1.5m initial lifts includingrough dressing and breakingclods to max 5cm to 7cm and laying in layers not exceeding 0.3m in depth etc complete as per specification &direction of the Engineer-in-Charge . | 1,587.73 | cum | 311.55 | ₹4,94,655.72 |
| 2 | Providing and Laying Cutting edge of Mild Steel weighing 40 kg per metre including cladding for Well foundation etc. complete as per drawing and technical specifications. | 171.54 | qtl | 12,031.36 | ₹20,63,859.15 |
| 3 | Labour for sinking in all kinds of soil other than rock in lines plumb etc complete.
b) For 6.5m dia. pier wells | 4 | rm | 23,412.36 | ₹93,649.44 |
| 4 | Sinking of R.C.C well sinking in soft rock (Non coring)/ Boulder/ Hard Soil )(wherein SPT>100) to lines levels & plum by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges. | 6.6 | rm | 94,526.62 | ₹6,23,875.67 |
| 5 | Construction of R.C.C well sinking in soft rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges.
For 6.50 mtr dia Well | 2 | rm | 2,58,235.67 | ₹5,16,471.34 |
| 6 | Construction of R.C.C well sinking in Hard rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges.
For 6.50 mtr dia Well | 1.2 | rm | 5,15,726.86 | ₹6,18,872.23 |
| 7 | Earth work excavation in foundation in Hard and compacted sheet rock within all leads and lifts including shoring, shuttering, propping bullahs, piling, dewatering from the foundation, supply & working of pumps stacking the excavated material away from the work in site. | 263.43 | cum | 1,692.1 | ₹4,45,743.13 |
| 8 | Plain Cement Concrete M 15 Grade using 20mm down graded chips in Foundation and Plinth
BOTTOM PLUGGING | 101.07 | cum | 6,752.28 | ₹6,82,419.18 |
| 9 | TOP PLUGGING | 15.91 | cum | 6,357.21 | ₹1,01,117.78 |
| 10 | TOE WALL | 105 | cum | 6,279.93 | ₹6,59,392.65 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 4.46 MB
Tendernotice_1.pdf
PDF • 2.29 MB
BOQ_599885.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .