Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.2 LAccepted-Finance | ₹24.2 L | L1 | Accepted-Finance AS PER BOQ |
| 2 | L2₹24.3 L+₹10,670 (0.44%)Accepted-Finance | ₹24.3 L+₹10,670 (0.44%) | L2 | Accepted-Finance AS PER BOQ |
| 3 | L3₹26.4 L+₹2.2 L (9.16%)Accepted-Finance GRAM POST MAWANA KHURD MAWANA MEERUT | MEERUT | UTTAR PRADESH | 245206 | ₹26.4 L+₹2.2 L (9.16%) | L3 | Accepted-Finance AS PER BOQ |
| Sl No | Description | Qty | Unit | Omveer Singh Contractor and Enggineer L2 | M/S A.K.CONTRACTOR L1 | SHIV CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00Detail of Work | ||||||
| 1.01 | Safely cartage of PCC poles 11 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends. | 110 | No | 2,000 ₹2,20,000 Lowest | 2,500 ₹2,75,000 | 2,600 ₹2,86,000 |
| 1.02 | Erection of single support on PCC poles (11 Mtr long) with complete fitting of all accessories of 33 KV line. complete. | 110 | No. | 4,000 ₹4,40,000 Lowest | 4,650 ₹5,11,500 | 5,000 ₹5,50,000 |
| 1.03 | Safely carriage of 33 KV cable jointing kit outdoor 3x300 sq mm.from ESC, SRE to site of work including loading & unloading at both ends. | 12 | No. | 800 ₹9,600 Lowest | 1,800 ₹21,600 | 2,000 ₹24,000 |
| 1.04 | Installation of 33 KV cable jointing kit Outdoor 3x300 sq mm for XLPE Cable as per RESPO specification. | 12 | No. | 4,000 ₹48,000 | 3,700 ₹44,400 Lowest | 3,800 ₹45,600 |
| 1.05 | Safely cartage of 33 KV XLPE 3x300 sqmm from ESC, SRE store to site of work including loading & unloading at both ends. | 730 | Mtr. | 70 ₹51,100 | 22 ₹16,060 Lowest | 25 ₹18,250 |
| 1.06 | Providing of HDPE Pipe 140mm dia | 520 | Mtr | 770 ₹4,00,400 | 550 ₹2,86,000 Lowest | 600 ₹3,12,000 |
| 1.07 | Drilling of earth under crossing 1.5 mtr. Deep and laying of 2 No. Parreral HDPE pipe 140 mm dia on 0.5 meter distance by drill machine/JCB machine/ labour. | 520 | Mtr | 600 ₹3,12,000 | 500 ₹2,60,000 Lowest | 600 ₹3,12,000 |
| 1.08 | Laying of 33 KV XLPE cable size 3x300 sq mm with HDD (Trenchless) method in the 02 No. HDPE pipe 140 mm dia on 0.5 meter distance. | 520 | Mtr | 340 ₹1,76,800 Lowest | 670 ₹3,48,400 | 670 ₹3,48,400 |
| 1.09 | Laying, lifting, stringing proper sagging of 33 KV XLPE cable 3x300 sq mm of including complete etc | 140 | Mtr | 300 ₹42,000 | 170 ₹23,800 Lowest | 200 ₹28,000 |
Tender Value
₹24.2 L
EMD Value
₹24,220
Closing Date
11 Jun 2026, 12:00 pmClosed
SE EDC II SRE
EDC II SRE
Under the business plan 2026-27 in the area of Electricity Distribution Division NakuR Saharanpur, the work of reconductoring the 33 kV line of 33/11 kV power substation Teetro emanating from 220 kV power substation Teetro
2026_PVVNL_1154798_1
10/W/EDC II/SRE/2026-27
Open Tender
Electrical Works
Lump-sum
90 days
SAHARANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Yes
SE EDC II SRE
₹24,220
Yes
15 Jun 2026
27 May 2026
11 Jun 2026
27 May 2026
11 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detail of Work | |||||
| 1.01 | Safely cartage of PCC poles 11 Mtr. Long from ESC, SRE/JE store to site of work including loading & unloading at both ends. | 110 | No | - | - |
| 1.02 | Erection of single support on PCC poles (11 Mtr long) with complete fitting of all accessories of 33 KV line. complete. | 110 | No. | - | - |
| 1.03 | Safely carriage of 33 KV cable jointing kit outdoor 3x300 sq mm.from ESC, SRE to site of work including loading & unloading at both ends. | 12 | No. | - | - |
| 1.04 | Installation of 33 KV cable jointing kit Outdoor 3x300 sq mm for XLPE Cable as per RESPO specification. | 12 | No. | - | - |
| 1.05 | Safely cartage of 33 KV XLPE 3x300 sqmm from ESC, SRE store to site of work including loading & unloading at both ends. | 730 | Mtr. | - | - |
| 1.06 | Providing of HDPE Pipe 140mm dia | 520 | Mtr | - | - |
| 1.07 | Drilling of earth under crossing 1.5 mtr. Deep and laying of 2 No. Parreral HDPE pipe 140 mm dia on 0.5 meter distance by drill machine/JCB machine/ labour. | 520 | Mtr | - | - |
| 1.08 | Laying of 33 KV XLPE cable size 3x300 sq mm with HDD (Trenchless) method in the 02 No. HDPE pipe 140 mm dia on 0.5 meter distance. | 520 | Mtr | - | - |
| 1.09 | Laying, lifting, stringing proper sagging of 33 KV XLPE cable 3x300 sq mm of including complete etc | 140 | Mtr | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
10.pdf
Tender Documents • 0.68 MB
BOQ_2163128.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .