Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-Finance | L1 | Accepted-Finance Lowest Rate | |
| 2 | L2₹5.6 L+₹446.92 (0.08%)Rejected-Finance | L2 | Rejected-Finance Above to Lowest Rate |
Tender Value
₹5.6 L
EMD Value
₹55,900
Closing Date
16 Jun 2026, 1:00 pmClosed
EXECUTIVE OFFICER
NPP MAU
WARD NO 39 MALIKTAHIRPURA HAJI KHALIL MASJID KE PAS KHALEEL SE ZAHIR KE MAKAN TK V HAJI HAJI AKRAM KE MAKAN SE AYYUB KE MAKAN TK TATATHA INAMULHAQUE KE MAKAN TK INTERLOCKING V NALI KA NIRMAN KARYA.
2026_DOLBU_1130573_2
68-197
Open Tender
Civil Works
Percentage
120 days
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,040
EXECUTIVE OFFICER
₹55,900
17 Jul 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clerance including labour and matrials and including grass cutting and carrage of matrials bv Head load | 1 | job | 5,000 | ₹5,000 |
| 2 | Dismenteling of Brick Work including Stacking of materials as directed by the Engineer-in-Charge with the distance of 60.00m. Work SI No. 692 | 5.23 | Cum | 435 | ₹2,275.05 |
| 3 | E/W in Excavation in ordenery soil in foudation including labour and matrials and T /P with all com. Work SI No. 251 | 63.73 | Cum | 115 | ₹7,328.95 |
| 4 | C.C. Work in 1:6:12 in cement, fine sand and 40 mm Gauge Brick Ballast including labour and matrials , T /P with all com. Work SI No. 273 | 11.59 | Cum | 3,250 | ₹37,667.5 |
| 5 | M-1S0 8/W in 1:4 in cement and coar sand mortar including labour and matrlals , T /P with all com. Work SI No.30S
(Deduction of old Bricks and Brick Blast Rs.6945.00) | 23.44 | Cum | 4,980 | ₹1,16,706.3 |
| 6 | 12 mm thick plaster work in 1 :3 with cement and fine sand etc all complete. SJ.No 584 | 85.92 | Sqm | 189 | ₹16,238.88 |
| 7 | RC.C. Work in 1:1.5:3 in cement coarse sand and 20mm gauge including labour and matrials , T /P with all com. Work SI No,Z!:15 | 0.24 | Cum | 9,430 | ₹2,263.2 |
| 8 | MS work in RC.C. work including 1300.00 8 labour and matrials , T /P with all com. Work SI No.504 | 0.19 | Qtl | 5,650 | ₹1,073.5 |
| 9 | Construction of Granular sub base (GSB) by providing coarse graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and -compacting with vibratory roller to achieve the desired density, complete as per Clause 401. | 12.53 | Cum | 3,492.6 | ₹43,762.28 |
| 10 | P /L of 80 mm thick rubber moulded Zig, Zag interlocking cement concrete Paver . blocks,Work SI No.-NSI | 125.25 | Sqm | 835 | ₹1,04,583.75 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
tech6801.pdf
Tender Documents • 6.53 MB
BOQ_2166719.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .