| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.8 LAccepted-AOC | ₹87.8 L Quoted ₹88.3 L | L1 | Accepted-AOC Low Rate |
| 2 | L2₹88.4 LRejected-Finance 128 283 H 2 BLOCK KIDWAI NAGAR KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹88.4 L | L2 | Rejected-Finance High Rate |
| 3 | Rejected-Technical 117 N 566 KRISHNA DHAM KAKADEO KANPUR NAGAR KANPUR | KANPUR | KANPUR NAGAR | UTTAR PRADESH | - | - | Rejected-Technical Non-Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
Tender Value
Refer Docs
EMD Value
₹6.5 L
Closing Date
15 Dec 2025, 12:00 pmClosed
SE, Kanpur Circle, PWD, Kanpur
SE, Kanpur Circle, PWD, Kanpur
Construction of Approach Road and 2X5X5 Meter Span Minor Bridge of Chaparghata Sihari Kumbhapur to Pathar Road in Km. 1 in Kanpur Dehat
2025_CEKNP_1096685_2
6430C/131C-KV/2025 Dt. 22.11.2025
Open Tender
Civil Works - Bridges
180 days
Kanpur Dehat
Please refer tender documents
2 documents required · 2 mandatory
₹3,853
₹6.5 L
Yes
SE, Kanpur Circle, PWD, Kanpur
3 Feb 2026
6 Dec 2025
15 Dec 2025
6 Dec 2025
15 Dec 2025
6 Dec 2025
10 Dec 2025
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Tech 301.5
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 including cost of emulsion.
Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 including cost of bitumen.
Providing, laying and rolling of open-graded Premix Carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen (VG-10) or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Seal Coat 'Type-C' as per Technical Specification Clause 508 including cost of bitumen.
Providing and laying Seal Coat sealing the voids in a bituminous surface (VG-10) laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 including cost of bitumen.
Construction of subgrade and Earthern shoulders with approved material obtained from borrow pits with a lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Tables 300-2 with a lead upto 1000 m as per Technical specification clause 303.1.
Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapet clause 1100. (1000 mm dia NP-3 pipe)
Laying brick soling on prepared sub-grade with brick on end edging according to lines,graded and cross-section shown on the drawing filling joints with sand and earth,spreading 25 mm thick layer of earth over brick soling,watering and rolling the same with three wheeled road roller 80-100 kN as per Technical Specification Clause 412
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Clauses 1302.
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification Clauses 1302.
Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 25 kg beyond curtain wall per drawing and technical specification Clauses 1300.
Dismantling of existing sutructures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification clause 202.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Providing concrete (1:3:6) for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. (MORD Ch.11 Ref.800-1200)
Filling of Dry 40 mm Brick Ballast of in side of pipe.
Providing and laying reinforced concrete (M-30) in super structure as per drawings and technical specifications Clause 800, 1205.4 & 1205.5 (MORD Ch.13 Ref.13-800)
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications 1000 & 1202.
Providing weep holes in brick masonry/stone masonry, plain / reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Drainage spouts complete as per drawing and technical specifications Clause 1209
stage.html
html • 0.04 MB
tech_eval
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 1.04 MB
BOQ_2019081.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid