| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | ₹4.6 L | L1 | Accepted-AOC l1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical l2 |
| 3 | Rejected-Technical CHENNAI | CHENNAI | TAMIL NADU | 600001 | - | - | Rejected-Technical l4 |
| 4 | Rejected-Technical | - | - | Rejected-Technical l3 |
| Sl No | Description | Qty | Unit | A CHELLADURAI L1 | T THIRUPPATHI L3 | KALIDASS BALU L2 | R JAYARAMAN L4 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of Mini CSC (Model 1) @ P.U.middle school in kaliyandur village in kaliyandur nainarpettai panchayat | |||||||
| 2.00 | Earthwork excavation in all classes of soil with initial lead & lift as per SS 20B for fOUNDATION etc complete | 14.93 | sqm | 216.3 ₹3,229.36 Lowest | 250 ₹3,732.5 | 224.45 ₹3,351.04 | 251 ₹3,747.43 |
| 3.00 | CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete | 4.07 | cum | 4,781.18 ₹19,459.4 Lowest | 5,000 ₹20,350 | 4,961.34 ₹20,192.65 | 5,689 ₹23,154.23 |
| 4.00 | Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement | 3.32 | cum | 5,059.26 ₹16,796.74 | 5,000 ₹16,600 Lowest | 5,249.91 ₹17,429.7 | 5,893 ₹19,564.76 |
| 5.00 | Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Ground floor | 10.43 | cum | 5,051.77 ₹52,689.96 Lowest | 5,500 ₹57,365 | 5,242.14 ₹54,675.52 | 5,893 ₹61,463.99 |
| 6.00 | Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Below Basement | 20.71 | sqm | 448.95 ₹9,297.75 Lowest | 470 ₹9,733.7 | 465.87 ₹9,648.17 | 520 ₹10,769.2 |
| 7.00 | Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Above basement | 24.29 | sqm | 897.9 ₹21,809.99 Lowest | 950 ₹23,075.5 | 931.74 ₹22,631.96 | 935 ₹22,711.15 |
| 8.00 | Supply & cost of fabrication steel including cost of steel & binding wire tying, bending in position etc | 0.7 | Mt | 75,354.15 ₹52,747.91 | 78,200 ₹54,740 | 78,193.71 ₹54,735.6 | 86 ₹60.2 Lowest |
| 9.00 | R.C.C. 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement | 6.72 | cum | 7,841.08 ₹52,692.06 Lowest | 9,000 ₹60,480 | 8,136.55 ₹54,677.62 | 9,402 ₹63,181.44 |
| 10.00 | Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work). | 9.44 | sqm | 151.09 ₹1,426.29 Lowest | 200 ₹1,888 | 156.78 ₹1,480 | 170 ₹1,604.8 |
Tender Value
₹5.9 L
EMD Value
₹5,920
Closing Date
5 Aug 2026, 3:30 pmClosed
BLOCK DEVELOPMENT OFFICER(VPT)
BLOCK DEVELOPMENT OFFICER(VPT),PANCHAYAT UNION THIRUPPUVANAM
Construction of Mini CSC (Type 1) at PU Middel school in Kaliyandur Village in Kaliyandur Nayanarpettai Panchayat
2026_RDTN_687501_1
TPM-2026-2027-MINI CSC-KALIYANDOOR NAYANARPETTAI PANCHAYAT
Open Tender
Civil Works
Item Rate
180 days
PANCHAYAT UNION THIRUPPUVANAM
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,920
Yes
1 Sept 2026
22 Jul 2026
5 Aug 2026
22 Jul 2026
5 Aug 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Mini CSC (Model 1) @ P.U.middle school in kaliyandur village in kaliyandur nainarpettai panchayat | - | - | - | - |
| 2 | Earthwork excavation in all classes of soil with initial lead & lift as per SS 20B for fOUNDATION etc complete | 14.93 | sqm | - | - |
| 3 | CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete | 4.07 | cum | - | - |
| 4 | Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement | 3.32 | cum | - | - |
| 5 | Brick work in Cm 1:5 mix using Country bricks including all cost & conveyance of all materials to site & all labour charges etc complete for Ground floor | 10.43 | cum | - | - |
| 6 | Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Below Basement | 20.71 | sqm | - | - |
| 7 | Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Above basement | 24.29 | sqm | - | - |
| 8 | Supply & cost of fabrication steel including cost of steel & binding wire tying, bending in position etc | 0.7 | Mt | - | - |
| 9 | R.C.C. 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete for Foundation & Basement | 6.72 | cum | - | - |
| 10 | Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work). | 9.44 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_826330.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.26 MB
BOQ_826330.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .