Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | ₹1.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.9 L+₹54,500 (39.4%)Rejected-Finance | ₹1.9 L+₹54,500 (39.4%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.9 L+₹55,000 (39.8%)Rejected-Finance | ₹1.9 L+₹55,000 (39.8%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.7 L+₹1.3 L (97.3%)Rejected-Finance | ₹2.7 L+₹1.3 L (97.3%) | L4 | Rejected-Finance L4 |
| 5 | L5₹3.5 L+₹2.1 L (150.6%)Rejected-Finance | ₹3.5 L+₹2.1 L (150.6%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | AJEET SING CONTRACTOR L4 | SHRI KRISHAN CONTRACTOR L3 | M/s CHANDRA PAL SINGH L2 | DS CONTRACTOR L1 | chahar constructions L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds and moonj with disposal away from site as directed by Engineer-in-Charge. | 3,250 | Sqm | 15 ₹48,750 | 25 ₹81,250 | 15 ₹48,750 | 13 ₹42,250 Lowest | 17 ₹55,250 |
| 2.00 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge.. also including wet earth work under water excluding dewatering with cost of labour and T&P etc. complete | 3,200 | Cum | 70 ₹2,24,000 | 35 ₹1,12,000 | 45 ₹1,44,000 | 30 ₹96,000 Lowest | 91 ₹2,91,200 |
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
3 Jun 2026, 5:00 pmClosed
Executive Engineer
LDAC, AGRA
Clearance of Beman Tikari Drain
2026_UPIDC_1145201_44
01/EE/2026-27
Open Tender
Civil Works
Item Wise
20 days
Clearance of Beman Tikari Drain
Please refer Tender documents.
3 documents required · 3 mandatory
₹177
₹7,000
2 Jul 2026
28 May 2026
4 Jun 2026
28 May 2026
3 Jun 2026
28 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting jhunds and moonj with disposal away from site as directed by Engineer-in-Charge. | 3,250 | Sqm | - | - |
| 2 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge.. also including wet earth work under water excluding dewatering with cost of labour and T&P etc. complete | 3,200 | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.90 MB
BOQ_2163287.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .