| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹2.2 Cr+₹6.9 L (3.21%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.4 Cr+₹30.5 L (14.3%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹2.5 Cr+₹38.8 L (18.1%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹2.5 Cr+₹39.2 L (18.3%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹3.1 Cr
EMD Value
₹6.1 L
Closing Date
14 Sept 2026, 6:00 pmClosed
SE PWD North Jammu, Lok Nirman Bawan
Office of the SUPERINTENDING ENGINEER PWD(R and B) NORTH CIRCLE JAMMU, Lok Nirman Bawan Jammu
Development of parking near Shamshan Ghat Akhnoor
2026_PWDJK_323317_1
(2nd call) e-NIT No. SENJ/18 of 2026-27 dated 02-09-2026
Open Tender
Civil Works
Percentage
272 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
Superintending Engineer PWD Circle North Jammu
₹6.1 L
Office of the SE PWD North Jammu, Lok Nirman Bawan
30 Sept 2026
3 Sept 2026
15 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil 1 meter from cutting edge | 1,820.38 | Cum | 479.3 | ₹8,72,508.13 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 292.5 | Cum | 187.3 | ₹54,785.25 |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) | 6.6 | Cum | 1,725.2 | ₹11,386.32 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 542.18 | Cum | 5,202.9 | ₹28,20,908.32 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 727.37 | Cum | 5,733.6 | ₹41,70,448.63 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 204.22 | Cum | 6,591.25 | ₹13,46,065.08 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 78.53 | Cum | 7,788.4 | ₹6,11,623.05 |
| 8 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 198.45 | Cum | 9,395.75 | ₹18,64,586.59 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | 37,067 | Kg | 123.2 | ₹45,66,654.4 |
| 10Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_1087747.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .