Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.8 L+₹18.96 (<0.01%)Admitted-Fee/PreQual/Technical/Finance | ₹2.8 L+₹18.96 (<0.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.8 L+₹2,407.78 (0.86%)Admitted-Fee/PreQual/Technical/Finance | ₹2.8 L+₹2,407.78 (0.86%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.9 L+₹7,076.78 (2.54%)Admitted-Fee/PreQual/Technical/Finance NO 1007 12TH SECTOR 78TH STREET KCEE MANASA APARTMENTS E BLOCK 3RD FLOOR K K NAGAR CH 600 078 | CHENNAI | CHENNAI | TAMIL NADU | 600078 | ₹2.9 L+₹7,076.78 (2.54%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SRI PUGAZH CONSTRUCTIONS L2 | SS ENGINEERRS L4 | SRI THANGAMMAN CONSTRUCTIONS L3 | SWATHI BUILDERS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Preparing the Existing surface to laying the road toProper Gradient and remove the loose soil withoutdamage the Water Supply and other Pipe lines. The Rateinclusive of all charges such as Earth work and removethe same away from the site etc, complete as perstandard specifications | 49 | m3 | 113.5 ₹5,561.5 | 250 ₹12,250 | 113 ₹5,537 Lowest | 113.05 ₹5,539.52 |
| 2.00 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 49 | m3 | 88.4 ₹4,331.6 | 80 ₹3,920 | 50 ₹2,450 Lowest | 88.4 ₹4,331.65 |
| 3.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 32.4 | m3 | 5,068.06 ₹1,64,205.14 Lowest | 5,080 ₹1,64,592 | 5,200 ₹1,68,480 | 5,068.12 ₹1,64,206.98 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification. | 17 | m3 | 6,176.82 ₹1,05,005.94 Lowest | 6,200 ₹1,05,400 | 6,178 ₹1,05,026 | 6,176.89 ₹1,05,007.07 |
| 5.00Add :- GST @ 18% | |||||||
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
9 Jul 2026, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Providing Cement Concrete Patches at Subbanaikanputhur Nanjegoundan puthur Urumandam palayam areas in ward no 13, North Zone
2026_MAWS_683429_28
E1/NorthZone/2026-27
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹4,000
10 Jul 2026
3 Jul 2026
10 Jul 2026
3 Jul 2026
9 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparing the Existing surface to laying the road toProper Gradient and remove the loose soil withoutdamage the Water Supply and other Pipe lines. The Rateinclusive of all charges such as Earth work and removethe same away from the site etc, complete as perstandard specifications | 49 | m3 | - | - |
| 2 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 49 | m3 | - | - |
| 3 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 32.4 | m3 | - | - |
| 4 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification. | 17 | m3 | - | - |
| 5 | Add :- GST @ 18% | - | - | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
NITE1-Road.pdf
Tender Documents • 0.37 MB
BOQ_822053.xls
BOQ • 0.28 MB
ITBE1.pdf
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .