Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹42.1 LAdmitted-Fee/PreQual/Technical/Finance | -14.86% | ₹42.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
14 Aug 2026, 6:00 pmClosed
EO
NAGAR PALIKA CHHABRA
KATIKHANDI DAMAR SADK SE NEW 33 KV GRID TAK NALA NIRMAN KARYA
2026_DLB_584460_1
4169-75/07-08-2026
Open Tender
Civil Works
Percentage
180 days
NAGAR PALIKA CHHABRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
NAGAR PALIKA CHHABRA
₹1 L
Yes
16 Aug 2026
8 Aug 2026
14 Aug 2026
8 Aug 2026
14 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and
disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 304 | cum | 229.5 | ₹69,768 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 26.88 | cum | 4,575 | ₹1,22,976 |
| 3 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 1,784 | sqm | 367 | ₹6,54,728 |
| 4 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. | 10,224 | kg | 83.3 | ₹8,51,659.2 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 511.2 | cum | 6,340 | ₹32,41,008 |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.15 MB
main.pdf
Tender Documents • 2.14 MB
BOQ_1038153.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .