| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹94.7 LAccepted-AOC | 1 | Accepted-AOC lowest rate quoted | |
| 2 | 2₹94.9 L+₹20,647.72 (0.22%)Rejected-Finance MELANANGOOR KATHIRUPPU POST SIRKALI TALUK TAMIL NADU | 2 | Rejected-Finance Highest Amount Quoted |
Tender Value
₹96.4 L
EMD Value
₹97,000
Closing Date
11 May 2022, 3:00 pmClosed
The District Collector,Mayiladuthurai
The District Collector Office,Mayiladuthurai
Strengthening of Road From Keelaiyur Chellakoil Road Keelaiyur Panchayat in Sembanarkoil Block TNRRIS 2021 -2022
2022_RDTN_231025_1
005/2022/A2 date 26.04.2022
Open Tender
Civil Works - Roads
Item Rate
180 days
Keelaiyur
Strengthening of Road From Keelaiyur Chellakoil Road Keelaiyur Panchayat in Sembanarkoil Block TNRRIS 2021 -2022
9 documents required · 9 mandatory
₹0
₹97,000
Yes
The District Collector Office,Mayiladuthurai
28 Jul 2022
4 May 2022
11 May 2022
4 May 2022
11 May 2022
4 May 2022
4 May 2022 - 6 May 2022
5 May 2022
Amount
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
scarfying the Exting Bitumenos surface to a depth of 150 mm and disposal of scarified matrial with a lift upto 3 m ad lead upto 1000 m as per technical specification 301.4
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over WBM surface using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 23.232 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete .
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting and all other incidental charges such as traffic barricading and providi
Provision for Heactameter stone 0.75x0.23x0.1m
Provision for Kilometre stone 0.75x0.23x0.1m
B) Construction of RCC Culvert 1.50 m Span
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with river sand good quality including cost and conveyance of all materials to site including watering and compacting etc complete.
Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Cement concrete with (1:3:6) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Footing
Super Structure
Steel centering including all labour chargesfor R.C.C works.
Strutting
Plain Cement concrete 1:2:4 using 20mm HBG jelly including cost and conveyance of all labour charges etc.
R.C.C (1:1 1/2:3) using 20mm HBG metal including cost and conveyance of all labour charges etc.
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Gravel fillinng Body wall including cost and conveyance of gravel watering compacteinbg etc completed
Provision for Bitumen Felt 15 mm thick pad
Provision for weep holes in Plain concrete 110mm dia ac PVC pipe for 4ksc
Providing and fixing Tar Pad
C) Construction of RCC Culvert 1.50 m Span
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with river sand good quality including cost and conveyance of all materials to site including watering and compacting etc complete.
Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Cement concrete with (1:3:6) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Footing
Super Structure
Steel centering including all labour chargesfor R.C.C works.
Strutting
Plain Cement concrete 1:2:4 using 20mm HBG jelly including cost and conveyance of all labour charges etc.
R.C.C (1:1 1/2:3) using 20mm HBG metal including cost and conveyance of all labour charges etc.
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Gravel fillinng Body wall including cost and conveyance of gravel watering compacteinbg etc completed
Provision for Bitumen Felt 15 mm thick pad
Provision for weep holes in Plain concrete 110mm dia ac PVC pipe for 4ksc
Providing and fixing Tar Pad
D) Construction of RCC Culvert 3.00 m Span
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with river sand good quality including cost and conveyance of all materials to site including watering and compacting etc complete.
Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Cement concrete with (1:3:6) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Footing
Super Structure
Steel centering including all labour chargesfor R.C.C works.
Shuttring
Plain Cement concrete 1:2:4 using 20mm HBG jelly including cost and conveyance of all labour charges etc.
R.C.C (1:1 1/2:3) using 20mm HBG metal including cost and conveyance of all labour charges etc.
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Gravel fillinng Body wall including cost and conveyance of gravel watering compacteinbg etc completed
Provision for Bitumen Felt 15 mm thick pad
Provision for weep holes in Plain concrete 110mm dia ac PVC pipe for 4ksc
Providing and fixing Tar Pad
Provision For Name Board
Provision For Sign Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VEL BUILDERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .