Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance TAMIL NADU TAMIL NADU TAMIL NADU | TIRUVANNAMALAI | TAMIL NADU | 604407 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance MADURAI MADURAI TAMIL NADU | MADURAI | TAMIL NADU | 625001 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.3 L
EMD Value
₹7,000
Closing Date
10 Aug 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development officer(VP), Ammapettai.
Block Development officer(VP), Ammapettai.
Construction of Waitng shed and Providing approach road for Kullanur Burial Ground in Boothapadi Panchayat , Ammapettai Block of Erode District under AGAMT II 2023-2024 Scheme
2023_RDTN_353728_1
2845/2022/B5 31.07.2023
Open Tender
Civil Works - Buildings
Item Rate
150 days
Block Development officer(VP), Ammapettai.
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹7,000
Yes
10 Aug 2023
2 Aug 2023
10 Aug 2023
2 Aug 2023
10 Aug 2023
2 Aug 2023
Amount
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Complying with standard specification.
Filling the Basement with excavated earth other than sand etc., complete complying to standard specification.
Collection supply and filling of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc. complete
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel angle. Below GL
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel angle. Above GL
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS )
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and
Granoliyhic floor finishing with cc 1:2:4mix, using 10-12mm chips including cost and conveyance of all materials to site and all labour charges etc
Plastering with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Plastering with cement mortar 1:4mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc, complete .
Painting two coats with best approved Exterior Emulsion over cement plastered surface ceiling and other new surface including cleaning, preparing the surface etc. complete
Supply and fixing of Cudappa slab including cost & conveyence of all to site etc complete.
CC road Sub estimate
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm.
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete
Supplying and Errecting cenering for sides and soffits including necessary supports and strurring up to 3.29m hight for plane surface in all floors with all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffened,welded with steel angle. Below GL
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Supply and fixing of Bitumenpad charges
Towards to the Name board charges etc complete.,
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K.S.CONSTRUCTIONS
sri kumaran construction
palanisamy
stage.html
html • 0.02 MB
finance_421782.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .