| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 CrAccepted-AOC 1029 B 2 E WING 2ND FLOOR SHRI KARVIR NIVASINI TOWER BESIDE ZORBA HOTEL SHAHUPURI KOLHAPUR 416001 | KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416001 | ₹6.1 Cr | L1 | Accepted-AOC L1 |
| 2 | Not Admitted-Fee/PreQual/Technical 2784 C JUNA BUDHWAR PETH KOLHAPUR | KOLHAPUR | KOLHAPUR | MAHARASHTRA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹6.1 Cr
EMD Value
₹3.0 L
Closing Date
7 Nov 2025, 6:00 pmClosed
EE MID OROS SINDDHUDURG
EE MID OROS SINDDHUDURG SINDHDURGNAGARI TAL KUDAL DIST SINDHUDURG
Construction of Pipe Distribution Network on Right Bank Canal for Otav MI scheme Tal Kankavali Dist Sindhudurg
2025_CWRDK_1233740_1
MI/N4/PDN/OTAV/2025-26
Open Tender
Civil Works
Percentage
365 days
OTAV TAL KANKAVLI
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
₹3.0 L
24 Mar 2026
24 Oct 2025
10 Nov 2025
24 Oct 2025
7 Nov 2025
24 Oct 2025
24 Oct 2025 - 30 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Item No.01-Cleaning grass and removal of rubbish up to a distance of 50 meters outside the periphery of the area as directed | 0.52 | Sqm | 4.85 | ₹2.51 |
| 3 | Item No.02-Cutting down trees including cutting trunks & branches and stacking the material with all lift including uprooting and refilling the pit with material etc.complete as directed. (excluding extra material required for refilling) | - | - | - | - |
| 4 | A) Girth Between 30 cm to 60 cm. 40 % | 214 | No | 313.65 | ₹67,121.1 |
| 5 | B) Girth Between 60 cm to 90 cm. 30 % | 160 | No | 388.7 | ₹62,192 |
| 6 | C) Girth Between 90 cm to 1.50 cm. 30 % | 160 | No | 688.95 | ₹1,10,232 |
| 7 | Item No.03-Excavation for deep trenches for laying rising main in Earth Soil of all types, sand, gravel and soft murum, Hard murum, soft bhisa, Hard man and boulder and in Soft Rock by crow bar and shavel including trimming to correct line, level and to specified widths including removing the excavated material and stacking or spreading the same upto a distance of 1 Km and all lifts as directed, preparing the bed for foundation and necessary safety precautions , keep the trench undisturbed till pipe laying & fixing necessary specials etc complete as per detailed specifications. As directed (Payable measurements with vertical excavation). | 0.67 | Cum | 169.45 | ₹113.82 |
| 8 | Item No.04- Excavation for deep trenches for laying rising main in Hard murum, soft bhisa, Hard man and boulder including trimming to correct line and level and to specified width, including removing the excavated material and stacking or spreading the same upto a distance of 1 km and all lifts as directed, preparing the bed for foundation and necessary safety precautions , keep the trench undisturbed till pipe laying & fixing necessary specials etc complete as per detailed specifications (Payable measurements with vertical excavation). | 2,467.91 | Cum | 199.8 | ₹4,93,088.42 |
| 9 | Item No.5 -Excavation for deep trenches for laying rising main in Soft Rock by crow bar and shavel including trimming to correct line and level and to specified width including trimming and levelling the bed removing the excavated material and stacking the same upto a distance of 1 km and all lifts as directed and safety precautions to keep the trench undisturbed till pipe laying & fixing necessary specials etc complete as per detailed specifications. (Payable measurements with vertical excavation). | 1,233.95 | Cum | 206.05 | ₹2,54,255.4 |
| 10 | Item No.6- Excavation for deep trenches for laying rising main in Hard Rock of any toughness by breaker to correct line and level and to specified width including trimming and levelling the bed as directed, removing the excavated material and sorting, stacking the same upto a distance of 1 km and all lifts as directed, preparing the bed for foundation and keep the trench undisturbed till pipe laying & fixing necessary specials etc complete as per detailed specifications. (Payable measurements with vertical excavation). | 6,169.77 | Cum | 712.7 | ₹43,97,195.08 |
| 11 | Item No.07- Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 /14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i.e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint including coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete. Note:- H.D.P.E. Pipes shall be as per latest IS Specifications. | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
tenderform.pdf
Tender Documents • 5.42 MB
BOQ_2128906.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .