Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹81.1 LAccepted-AOC PLOT NO 548 3366 SRIRAM ENCLAVE LANE 4 NEAR MANIPAL HOSPITAL P O SANKARPUR P S KHANDAGIRI DIST KHURDA | KHURDA | ₹81.1 L | 1 | Accepted-AOC L1 BIDDER |
| 2 | 2₹85.9 L+₹4.8 L (5.88%)Rejected-AOC 1ST FLOOR SAI COMPLEX BESIDES ADITYA VIP ENCLAVE NEAR GANESH MANDAP CHHAK JHARPADA BHUBANEWAR 751006 | KHORDHA | ODISHA | 751006 | ₹85.9 L+₹4.8 L (5.88%) | 2 | Rejected-AOC L2 BIDDER |
| 3 | 2₹85.9 L+₹4.8 L (5.88%)Rejected-AOC AT BDA COLONY LAXMISAGAR STAGE II BHUBANESWAR | ₹85.9 L+₹4.8 L (5.88%) | 2 | Rejected-AOC L2 BIDDER |
| 4 | 3₹90.2 L+₹9.1 L (11.2%)Rejected-AOC FR 92 6 PHASE II SAILASHREE VIHAR CHANDRASEKHARPUR BBSR 751021 | KHORDHA | ODISHA | 751021 | ₹90.2 L+₹9.1 L (11.2%) | 3 | Rejected-AOC L3 BIDDER |
Tender Value
Refer Docs
EMD Value
₹96,000
Closing Date
1 Aug 2023, 12:00 pmClosed
Divisional Head, Electrical Division, IDCO
Divisional Head, Electrical Division, IDCO, 8th Floor, IDCO Tower, Bhubaneswar
Upgradation of 4Nos of Distribution Transformer, addition of 2Nos new Distribution transformer and Installation of new LT line at Jagatpur Industrial Estate, Cuttack.
2023_IDCO_90705_1
BBSR/ELECT/e-16/2023-24
National Competitive Bid
Electrical Works
Percentage
90 days
Jagatpur Industrial Estate
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
₹96,000
Divisional Head, Electrical Division, IDCO
15 Dec 2023
14 Jul 2023
1 Aug 2023
14 Jul 2023
1 Aug 2023
14 Jul 2023
20 Jul 2023
eProcurement System Government of Odisha Created By: SAROJ KUMAR DASH Created Date/Time: 02-Sep-2023 01:17 PM Tender Title: Upgradation of 4Nos of Distribution Transformer, addition of 2Nos new Distribution transformer and Installation of new LT line at Jagatpur Industrial Estate, Cuttack. Tender ID: 2023_IDCO_90705_1
Tender Inviting Authority: Divisional Head (Electrical), IDCO, Bhubaneswar.
Name of Work: Upgradation of 4Nos of Distribution Transformer, addition of 2Nos new Distribution transformer and installation of new LT line at Jagatpur Industrial Estate, Cuttack. Under MSE-CDP Scheme..
Contract No: BBSR/ELECT/ e-16 / 2023-24
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 AADYA URJA SOLUTIONS PRIVATE LIMITED(GSTN-21AAMCA1775H1ZS) 9543344.579 -9.990 8589964.456 Eighty Five Lakh Eighty Nine Thousand Nine Hundred and Sixty Four
2.00 M/S SARALA ENGINEERING WORKS(GSTN-21AARFS3706J1Z3) 9543344.579 -5.500 9018460.627 Ninty Lakh Eighteen Thousand Four Hundred and Sixty
3.00 Santosh Kumar Biswal(GSTN-21AJTPB1675Q1ZS) 9543344.579 -14.990 8112797.227 Eighty One Lakh Tweleve Thousand Seven Hundred and Ninty Seven
4.00 AYUSH POWER INFRASTRUCTURE(GSTN-NA) 9543344.579 -9.990 8589964.456 Eighty Five Lakh Eighty Nine Thousand Nine Hundred and Sixty Four
Lowest Amount Quoted BY: Santosh Kumar Biswal(8112797.227)
BOQ Summary Details Tender Title: Upgradation of 4Nos of Distribution Transformer, addition of 2Nos new Distribution transformer and Installation of new LT line at Jagatpur Industrial Estate, Cuttack. Tender ID: 2023_IDCO_90705_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Santosh Kumar Biswal 8112797.227 L1
2 AADYA URJA SOLUTIONS PRIVATE LIMITED 8589964.456 L2
3 AYUSH POWER INFRASTRUCTURE 8589964.456 L2
4 M/S SARALA ENGINEERING WORKS 9018460.627 L3
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .