| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC | ₹4.3 L | L1 | Accepted-AOC L1 |
| 2 | l2₹4.8 L+₹50,655 (11.9%)Rejected-AOC | ₹4.8 L+₹50,655 (11.9%) | l2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | THE RAIDHARNA COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED L2 | THE SHIVALIK CO-OP L&C SOCIETY LTD. L1 |
|---|---|---|---|---|---|
| 1.00LINING | |||||
| 2.00(19.38) Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads | |||||
| 3.00 | ((a)) Disposal/carraige from 0 upto 450m | 1 | Cum | 80 ₹80 | 75 ₹75 Lowest |
| 4.00 | ((b)) Disposal/ carraige additional beyond 450m upto 1Km | 1 | Cum | 20 ₹20 | 16 ₹16 Lowest |
| 5.00 | ((c)) Disposal/carraige for every additional Km upto 10Km | 1 | Cum | 250 ₹250 | 225 ₹225 Lowest |
| 6.00 | (19.2) Dressing side slopes and preparation of sub grade for lining. | 1 | Sq.Mtr | 30 ₹30 | 24 ₹24 Lowest |
| 7.00(19.20 (i)) Single layer brick lining for irrigation channels (Distributaries and minors) or section for all depths consisting of :- | |||||
| 8.00((a)) First layer 12.5mm thick cement plaster 1:5 on sub grade and finished. | |||||
| 9.00((b)) Second layer of 10mm thick cement plaster 1:3 properly rendered and finished. | |||||
| 10.00 | ((c) ) 75mm thick bricks laid in 1:3 cement sand mortar over second layer. | 1 | Sq.Mtr | 900 ₹900 | 815 ₹815 Lowest |
Tender Value
₹3.9 L
EMD Value
₹7,888
Closing Date
25 Jan 2024, 12:00 pmClosed
Xen,Kandi Canal Stage2 Division,hoshiarpur
Xen,Kandi Canal Stage2 Division,hoshiarpur
Estimate for raising of kandi canal stage-2 at RD 109862 to RD 109960
2024_WR_115591_1
67
Open Tender
Civil Works - Canal
Item Rate
30 days
Hoshiarpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
₹7,888
Yes
26 Aug 2025
12 Jan 2024
25 Jan 2024
12 Jan 2024
25 Jan 2024
12 Jan 2024
Amount
LINING
(19.38) Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads
((a)) Disposal/carraige from 0 upto 450m
((b)) Disposal/ carraige additional beyond 450m upto 1Km
((c)) Disposal/carraige for every additional Km upto 10Km
(19.2) Dressing side slopes and preparation of sub grade for lining.
(19.20 (i)) Single layer brick lining for irrigation channels (Distributaries and minors) or section for all depths consisting of :-
((a)) First layer 12.5mm thick cement plaster 1:5 on sub grade and finished.
((b)) Second layer of 10mm thick cement plaster 1:3 properly rendered and finished.
((c) ) 75mm thick bricks laid in 1:3 cement sand mortar over second layer.
(19.32) Laying brick on edge coping 356mm wide and 115mm thick in cement sand mortar 1:3
MATERIALS
(M-73) Polythene films/ sheet of 100,125, 150, 200,250 micron
ROAD WORK
( (i)) Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding cost of rolling.
( (ii)) Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction.
((iii)) Extra for rolling to specifications.
any other item
THE RAIDHARNA COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .