Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.4 LAdmitted-Finance | -45.88% | ₹25.4 L | L1 | Admitted-Finance |
| 2 | L2₹29.8 L+₹4.4 L (17.3%)Admitted-Finance MALAN SARKEL DELY JILA DOH | DODA | JAMMU AND KASHMIR | 182129 | -36.54% | ₹29.8 L+₹4.4 L (17.3%) | L2 | Admitted-Finance |
| 3 | L3₹29.8 L+₹4.5 L (17.6%)Admitted-Finance | -36.35% | ₹29.8 L+₹4.5 L (17.6%) | L3 | Admitted-Finance |
| 4 | L4₹32.0 L+₹6.6 L (26.1%)Admitted-Finance | -31.78% | ₹32.0 L+₹6.6 L (26.1%) | L4 | Admitted-Finance |
| 5 | L5₹32.3 L+₹6.9 L (27.1%)Admitted-Finance | -31.21% | ₹32.3 L+₹6.9 L (27.1%) | L5 | Admitted-Finance |
Tender Value
₹46.9 L
EMD Value
₹93,792
Closing Date
22 Jul 2026, 6:00 pmClosed
Executive Engineer
wdsc tonk
Construction os sunken pond in non arable land
2026_WDSC_572807_6
NIT 7-15 2026-27 Div Tonk
Open Tender
Civil Works
Percentage
120 days
tonk
refer bid
2 documents required · 2 mandatory
₹500
refer bids
₹93,792
Yes
4 Aug 2026
3 Jul 2026
23 Jul 2026
3 Jul 2026
22 Jul 2026
3 Jul 2026
3 Jul 2026 - 22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1as per bsr specification | |||||
| 1.01 | taxy dh lQkbZ] Hkkjh >kfM;kas rFkk 30 lseh- yisV rd ds ikS/kksa dks dkVus lesrA (Gramin BSR Deoli 2026-27) item no. (192) | 20,482.58 | Sqm | 3.6 | ₹73,737.29 |
| 1.02 | Mkx csfyax djuk 5-0 lseh- ls 7-5 lseh- xgjkbZ rd | 2,911.8 | mtr | 1.71 | ₹4,979.18 |
| 1.03 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य@ मशीनरी कार्य सख्त मिट्टी (in Hard Soil) H/3 x (A1A2+B1B2+1/2(A1B2+A2B1) = Earth work calculation calculated by this formula | - | - | - | - |
| 1.04 | 20% मशीनरी कार्य सख्त मिट्टी (in Hard Soil) 196(ब) | 9,856.13 | cum | 50.35 | ₹4,96,256.15 |
| 1.05 | Excavation including loading, unloading, disposal and dressing of excavated earth
within initial lead of 50m and lift up to 1.5m including dressing of excavated area
and dewatering wherever required complete in all respect @ Hard soil mixed with Kankar/ boulders, Murram | - | - | - | - |
| 1.06 | 80% Hard soil mixed with Kankar/ boulders, Murram WRD 2026 (part A 1c) | 39,424.52 | cum | 98 | ₹38,63,602.96 |
| 1.07 | Add extra for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required | 24,640.32 | cum | 8.5 | ₹2,09,442.72 |
| 1.08 | Display board (iron) | 26 | No. | 1,600 | ₹41,600 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_1019081.xls
BOQ • 0.29 MB
datecorrigendum.pdf
PDF • 1.50 MB
BID.pdf
PDF • 1.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .