Loading…
Loading…
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
1 Sept 2026, 3:00 pm
Assistant Commissioner
South Zone, Coimbatore Corporation, Kuniyamuthur, Coimbatore 641008
Formation of cement concrete flooring at Vinayagar kovil street, Kurichi in Ward No 85, South Zone.
2026_MAWS_692579_8
e3/South zone/2026
Open Tender
Civil Works
Works
120 days
South Zone, Coimbatore Corporation, Kuniyamuthur
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹4,000
1 Sept 2026
10 Aug 2026
2 Sept 2026
10 Aug 2026
1 Sept 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work for CC Flooring to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting | 28 | Cum | - | - |
| 2 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 28 | Cum | - | - |
| 3 | Providing and laying well gravel including cost and conveyance of all materials from approved quarries as noted in lead chart to the road side including loading, unloading and stacking the well gravel at road side to departmental gauge for pre-measurement including labour charges for laying spreading leveling to camper etc., complete as per specifications. | 28 | Cum | - | - |
| 4 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 26 | Cum | - | - |
| 5 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights. | 7 | Sqm | - | - |
| 6 | Supply and fixing of 12mm thick Bituman pad with all labour charges etc complete., | 8 | Sqm | - | - |
| 7 | Plain cement concrete 1:2:4 mix (One part of cement, two parts of sand and four aggregates) using 20mm gauge hard stones complying with standard specification. | 20 | Cum | - | - |
| 8 | Add :- GST @ 18% | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_832866.xls
BOQ • 0.33 MB
TenderDocument.pdf
Tender Documents • 0.23 MB
ITB.pdf
Additional Documents • 0.09 MB
E32026EOTExtension.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].