Tender Value
₹44.0 Cr
EMD Value
₹23.5 L
Closing Date
27 Feb 2026, 3:00 pmClosed
Providing fencing of Precast/Prestressed Concrete Panel and Cast-in-situ RCC Wall to prevent the CRO and TPRO in FL-MD section along the Rajdhani route under jurisdiction of GM/Co./Jaipur.
JP-EN-FencingWall-2026-01~WDFC
JP-EN-FencingWall-2026-01
Open
Works - General
9 Months
Jaipur, Rajasthan
₹11,800
₹23.5 L
27 Feb 2026
30 Jan 2026
13 Feb 2026
2.8/2.8.1 - Earth work in excavation by cum mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
4.1/4.1.5 - Providing and laying in position cum cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
5.1/5.1.2 - Providing and laying in position cum specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.2/5.2.2 - Reinforced cement concrete cum work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9/5.9.1 including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
5.9.2 - Walls (any thickness) including Sqm attached pilasters, butteresses, plinth and string courses etc.
5.22/5.22.3 - Steel reinforcement for R.C.C. Kg work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
5.22.6 - Thermo-Mechanically Treated bars Kg of grade Fe-500D or more.
5.22A/5.22A.6 - Steel reinforcement for Kg R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo- Mechanically Treated bars of grade Fe- 500D or more.
10.16/10.16.1 - Steel work in built up Kg tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes WDFC FIELD UNIT-JAIPUR-CIVIL/WDFC
13.63/ 13.63.1 - Painting with aluminium Sqm paint of approved brand and manufacture to give an even shade. Two or more coats on new work Total 170625504.43 Schedule Schedule B-Schedule B - NS items Item- 1 Schedule B - NS items S No. Item Description of Item Unit Qty Rate Amount No
NS/1 - "Fabrication, Manufacturing & Numbers Transportation of Precast Prestressed Concrete elements of M45 grade design mix concrete (i) Fabrication &manufacturing of Prestressed Concrete (Pre-tensioned) elements such as panel, column etc. as per approved drawing in Controlled Factory Environment with approved methodology by using Iong line casting method. Concreting should be done by batch mixing plant with capable of producing zero slump concrete, transported through mechanical arrangement & layed on the bed, finishing, curing and also provision of steam curing. Cutting, making necessary cutout/holes of required sizes for services in PSC element after achieving required strength, yard handling &stacking all complete as per approved shop drawings & design mix as per the direction of the Engineer-in-charge. (Cost of HTS wires shall be paid separately under relevant item). (ii) Transportation of Precast PSC Elements from casting yard to site of work by suitable Truck/Trailor with proper accessories, including the cost of loading, unloading & stacking at site with the help of required capacity cranes. (ili) The rate Is inclusive of all ingredients i.e. cement, sand, aggregate, admixtures, water etc. including handling, batching, mixing, transporting, placing and vibrating of concrete, curing, Scaffolding, shuttering, formwork, mould, staging, lifting arrangement as per approved drawing etc. with all lead and lift with contractor's own labour, tools &plants machineries all taxes etc complete as required for successful completion of the item. Note-1: No payment shall be made for damaged Precast elements Note-2: 70% payment shall be made when PSC elements reach to site and balance 30% payment shall be made after erection & placement in position. Note-3: In case of change of size of precast PSC element, payment shall be adjusted on volumetric pro-rata basis. "CEO. Drg.No. CE/621A (Sheet-1) along with CBE Drg.No. CBE/SK/678/2023" -1-A PSC Panel (2.045X0.33X0.075m) WDFC FIELD UNIT-JAIPUR-CIVIL/WDFC
NS/2 - Fabrication, Manufacturing & Numbers Transportation of Precast Prestressed Concrete elements or M45 grade design mix concrete (i) Fabrication & manufacturing of Prestressed Concrete (Pre-tensioned) elements such as panel, column etc. as per approved drawing in Controlled Factory Environment with approved methodology by using long line casting method. Concreting should be done by batch mixing plant with capable of producing zero slump concrete, transported through mechanical arrangement & layed on the bed, finishing, curing and also provision of steam curing. Cutting, making necessary cutout/holes of required sizes for services in PSC element after achieving required strength, yard handling and stacking all complete as per approved shop drawings & design mix as per the direction of the Engineer-in-charge. (Cost of HTS wires shall be paid separately under relevant item). (ii) Transportation of Precast PSC Elements from casting yard to site of work by suitable Truck/Trailor with proper accessories, including the cost of loading, Unloading & stacking at site with the help of required capacity cranes. (iii) The rate is inclusive of all ingredients i.e. cement, sand, aggregate, admixtures, water etc. including handling, batching, mixing, transporting placing and vibrating of concrete, curing, scaffolding, shuttering, formwork, mould, staging, lifting arrangement as per approved drawing etc. with all lead and lift With contractor's own labour, tools & plants machineries all taxes etc complete as required for successful completion of the item. Note-1: No payment shall be made to damaged Precast elements Note-2: 70% payment shall be made when PSC elements reach to site and balance 30% payment shall be made after erection & placement in position. Note-3: In case of change of size of precast PSC element, payment shall be adjusted on volumetric pro-rata basis. "CEO. Drg.No. CE/621A (Sheet-1) along with Drg.No. CBE/SK/678/2023" 1-B PSC Column (2.45X0.225X0.225m) WDFC FIELD UNIT-JAIPUR-CIVIL/WDFC
NS/3 - Fabrication, Manufacturing & Numbers transportation or Precast Prestressed Concrete elements of M45 grade design mix concrete (i) Fabrication &manufacturing of Prestressed concrete (pre-tensioned elements such as panel, column etc. as der approved drawing in Controlled Factory Environment with approved methodology by using long line casting method. Concreting should be done by batch mixing plant with capable of producing zero slump concrete, transported through mechanical arrangement & layed on the bed, finishing, curing and also provision or steam curing. Cutting, making necessary cutout/holes or required sizes for services in PSC element after achieving required strength, yard handling & stacking all complete as preapproved shop drawings & design mix as per the direction of the Engineer-in-charge (Cost of HTS wires shall be paid separately under relevant item). (ii) Transportation of Precast PSC Elements from casting yard To Site of work by suitable Truck/Trailor with proper accessories. Including the cost of loading, unloading & stacking at site with the help of required capacity cranes. (iii) The rate is inclusive of all ingredients i.e. cement, sand, aggregate, admixtures, water etc. including handling, batching, mixing, transporting, placing and vibrating of concrete, curing, scaffolding, shuttering, formwork, mould, staging, lifting arrangement as per approved drawing etc. with all lead and lift with contractor's own labour, tools & plants machineries all taxes etc. complete as required for successful completion of the item. Note-1: No payment shall be made for damaged Precast elements Note-2: 70% payment shall be made when PSC element reach to site and balance 30% payment shall be made after erection & placement in position. Note-3: In case of change of size of precast PSC element, payment shall be adjusted on volumetric pro-rata basis. "CFO.Dra.No.CF/621A| (Sheet-1) along with CBE Drg.No. CBE/SK/678/2023" 1-C PSC Column (2.45X0.225X0.200m) - Expansion area WDFC FIELD UNIT-JAIPUR-CIVIL/WDFC
NS/4 Transportation of Precast RCC elements of M30 grade design mix concrete (i) Fabrication and manufacturing of precast concrete element such as foundation & column cap as per approved drawing, m a n u f a c t u r e d in controlled factory environment with approved methodology including moulds, mixing, transporting and placing of concrete, vibrating, curing, finishing, making necessary cutout/holes of required sizes for services, yard handling & stacking all complete as per IS:11447: 1985 and as per approved shop drawings and design mix as per the direction of Engineer in-Charge (Cost of steel for reinforcement shall be paid separately under relevant item). (ii) Transportation of Precast RCC Elements from casting yard to site of work by suitable Truck/ Trailor with proper accessories, including the cost of loading, unloading & stacking at site with the help of required capacity cranes. (iii) The rate is inclusive of all ingredients i.e. cement, sand, aggregate, admixtures, water etc. including handling, batching, mixing, transporting, placing and vibrating of concrete, curing, scaffolding, shuttering, formwork, mould, staging etc. with all lead and lift with contractor's own labour, tools & plants machineries all taxes etc complete as required for successful completion of the item. Note-1: No payment shall be made for damaged Precast elements. Note-2: 70% payment shall be made when PSC elements reach to site and balance 30% payment shall be made after erection & placement in position. Note-3: In case of change of size of precast RCC element, payment shall be adjusted on volumetric pro-rata basis. "CEO. Drg.No. CE/621A (Sheet- 1) along with CBE Drg.No. CBE/SK/678/2023" 2-A Precast RCC Footing (1.2X1X0.7m) WDFC FIELD UNIT-JAIPUR-CIVIL/WDFC
NS/5 Transportation of Precast RCC elements of Pl30 grade design mix concrete (i) Fabrication and manufacturing of precast concrete element such as foundation & column cap as per approved drawing, m a n u f a c t u r e d in controlled factory environment with approved methodology including moulds, mixing, transporting and placing of concrete, vibrating, curing, finishing, making necessary cutout/holes of required sizes for services, yard handling & stacking all complete as per IS: 11447: 1985 and as per approved shop drawings and design mix as per the direction of Engineer in-Charge (Cost of steel for reinforcement shall be paid separately under relevant item). (ii) Transportation of Precast RCC Elements from casting yard to site of work by suitable Truck/Trailor with proper accessories, including the cost of loading, unloading & stacking at site with the help of required capacity cranes. ((iii) The rate is inclusive of all ingredients i.e. cement, sand, aggregate, admixtures, water etc. including handling, batching, mixing, transporting, placing and vibrating of concrete, curing, scaffolding, shuttering, formwork, mould, staging etc. with all lead and lift with contractor's own labour, tools & plants machineries all taxes etc complete as required for successful completion of the item. Note-1: No payment shall be made for damaged Precast elements. Note-2: 70% payment shall be made when PSC elements reach to site and balance 30% payment shall be made after erection & placement in position. Note-3 : In case of change of size of precast RCC element, payment shall be adjusted on volumetric pro-rata basis. "CEO.Drg.No. CE/621A (Sheet- 1) along with CBE Org.No. CBE/SK/678/2023" 2-B Precast RCC Footing (1.35X1X0.7m) - Expansion area WDFC FIELD UNIT-JAIPUR-CIVIL/WDFC
NS/6 - Fabrication, Manufacturing & Numbers Transportation of Precast RCC elements of M30 grade design mix concrete (i) Fabrication and manufacturing of precast concrete element such as foundation & column cap as per approved drawing, m a n u f a c t u r e d in controlled factory environment with approved methodology including moulds, mixing, transporting and placing of concrete, vibrating, curing, finishing, making necessary cutout/holes of required sizes for services, yard handling & stacking all complete as per IS: 11447: 1985 and as per approved shop drawings and design mix as per the direction of Engineer in-Charge (Cost of steel for reinforcement shall be paid separately under relevant item). (ii) Transportation of Precast RCC Elements from casting yard to site of work by suitable Truck/Trailor with proper accessories, including the cost of loading, unloading & stacking at site with the help of required capacity cranes. ((iii) The rate is inclusive of all ingredients i.e. cement, sand, aggregate, admixtures, water etc. including handling, batching, mixing, transporting, placing and vibrating of concrete, curing, scaffolding, shuttering, formwork, mould, staging etc. with all lead and lift with contractor's own labour, tools & plants machineries all taxes etc complete as required for successful completion of the item. Note-1: No payment shall be made for damaged Precast elements. Note-2: 70% payment shall be made when PSC elements reach to site and balance 30% payment shall be made after erection & placement in position. Note-3: In case of change of size of precast RCC element, payment shall be adjusted on volumetric pro-rata basis. "CEO. Drg.No.CE/621 A (Sheet- 1) along with CBE Org.No.CBE/SK/678/2023" 2-C Column Cap (0.275X0.275X0.15m)
NS/7 - Providing & laying in position Kg 7mm/5mm Dia HTS Indented Wires with UTS of 1470 MPa confirming to IS- 6003 for manufacturing of PSC element by using mechanical pulling arrangement like Rabbit/ Bed master including all accessories for stressing & destressing operations as per approved make etc, complete as per drawings and direction of Engineer -in-charge. Note: The rate is inclusive of all contractors labour, materials including, cutting, pulling arrangement machineries, tools & plants, taxes etc. complete. Payment will not be made for any wastages. "CEO.Drg.No. CE/621A (Sheet- 1 alone with CBE Drg. No. CBE/SK/678/2023" WDFC FIELD UNIT-JAIPUR-CIVIL/WDFC
NS/8 - Erection & Installation of Precast Numbers PSC/RCC elements in correct & final position with proper line, level and plumbat site making all arrangements (i.e. cranes, push-pull jacks & all other T&P) for lifting, placing, Steel Props for holding in position after Erection & Alignment of elements. within erection tolerance as per IS: 15916 as per approved shop drawings and all complete as per the direction of Engineer- in-Charge. (Cost of grouting shall be paid separately). Note-1: The rate is inclusive of all contractors labour, materials including machineries. tools & plants, etc. complete. Note-2: In case of change of size of precast PSC element, payment shall be adjusted on volumetric pro-rata basis "CEO.Drg.No. CE/621A (Sheet- 1) along with CBE Drq.No. CBE/SK/678/2023" PSC Pannel (2.045X0.33X0.075 m)
NS/9 - Erection & Installation of Precast Numbers PSC/RCC elements in correct & final position with proper line, level and plumbat site making all arrangements (i.e cranes, push-pull jacks & all other Tap) for lifting, placing, Steel Props for holding in position after Erection & Alignment of elements, within erection tolerance as per IS: 15916 as per approved shop drawings and all complete as per the direction of Engineer- In-c Charge. (Cost of grouting shall be paid separately). Note-1: The rate is inclusive of all contractors labour, materials including machineries, tools & plants, etc. complete. Note-2: In case of change of size of precast PSC element, payment shall be adjusted on volumetric pro-rata basis. "CEO.Drg.No.CE/621A (Sheet- 1 alongwith CRF Drg.No. CBE/SK/678/2023" PSC Column (2.45X0.225X0.225m)
NS/10 - Erection & Installation of Precast Numbers PSC/RCC elements in correct & final position with Proper line, level and plumbat site making all arrangements (i.e cranes, push-pull jacks & all other T&P) for lifting, placing, Steel Props for holding in position alter erection & Alignment of elements, within erection tolerance as per IS: 15916 as per approved shop drawings and all complete as per the direction of Engineer- in-Charge. (Cost of grouting shall be paid separately). Note-1: line rale is inclusive of all contractors labour, materials including machineries, tools & plants etc. complete. Note-2: In case of change of size of precast PSC element, payment shall be adjusted on volumetric Pro-rata basis "CEO.Drg.No.CE/621A (Sheet- 1) along with CBE Drg. No. CBE/SK/678/2023" PSC Column (2.45X0.225X0.200m) - Expansion area WDFC FIELD UNIT-JAIPUR-CIVIL/WDFC
NS/11 - Erection & Installation of Precast Numbers PSC/RCC elements in correct & final position with proper line, level and plumbat site making all arrangements (i.e. cranes, push-pull jacks & all other T&P) for lifting, placing, Steel Props for holding in position after Erection & Alignment of elements, within erection tolerance as per IS : 15916 as per approved shop drawings and all completes as per the direction of Engineer- in-Charge. (Cost of grouting shall be paid separately). Note-1: The rate is inclusive of all contractors labour, materials including machineries, tools & Plants, etc. complele. Note-2. Incase of change of size of precast PSC element, payment shall be adjusted on volumetric pro-rata basis. "CEO.Drg.No.CE/621A (Sheet- 1) along with CBE Drg.No. CBE/SK/678/2023" Precast RCC Footing (1.2X1X0.7m)
NS/12 - Erection & Installation of Precast Numbers PSC/RCC elements in correct & final position with proper line, level and plumbat site making all arrangements (i.e cranes, push-pull jacks & all other T&P) for lifting, placing, Steel Props for holding in position after Erection & Alignment of elements, within erection tolerance as per IS: 15916 as per approved shop drawings and all complete as per the direction of Engineer- in-Chage. (Cost of grouting shall be paid separately). Note-1 : The rate is inclusive of all contractor's labour, materials including machineries, tools & plants etc. complete. Note-2: In case of change of size of precast PSC element, payment shall be adjusted on volumetric pro-rata basis. "CEO.Drg.No. CE/621A (Sheet- 1) along with CBE Drg.No. CBE/SK/678/2023" Precast RCC footing (1.35x1x.7m)
NS/13 - Erection & Installation of precast Numbers PSC/RCC elements in correct & final position with proper line, level and plumbat site making all arrangements (i.e cranes, push-pull jacks & all other T&P) for lifting, placing, Steel Props for holding in position after Erection & Alignment of elements, within erection tolerance as per IS: 15916 as per approved shop drawings and all complete as per the direction of Engineer- in-Charae. (Cost of grouting shall be paid separately). Note-1: The rate is inclusive of all contractor's labour, materials including machineries, tools & plants, etc. complete. Note-2: In case of change of size of precast PSC element, payment shall be adjusted on volumetric Pro-rata basis. "CEO.Drg.No. CE/621A (Sheet- 1) along with CBE Drg.No. CBE/SK/678/2023" Column Cap (0.275X0.275X0.15m) WDFC FIELD UNIT-JAIPUR-CIVIL/WDFC
NS/14 - Providing & grouting of PSC Column Numbers with Precast RCC Foundation as per approved drawing with M-60 grade cementitious grout (Non Shrink) of approved make by suitable means (Free flowing/pump), curing etc. complete as per directions of Engineer-in-charge. Note: The rate is inclusive of all contractors labour, tools & Plants, all materials including approved quality of non-shrink cementious grout og M60 grade, aggregates, all machineries, placing inposition, etc. Complete in all respect. Payment will not be made for any wastages. "CEO.Drg. No. CE/621A (Sheet-1) along with CBE Drg. No. CBE/SK/678/2023" PSC Column (0.225X0.225X2.45m) Total 260034862.80
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].