| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | -35.71% | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.8 LAdmitted-Finance | -26.20% | ₹1.8 L | L2 | Admitted-Finance |
| 3 | L3₹2.2 LAdmitted-Finance | -11.75% | ₹2.2 L | L3 | Admitted-Finance |
| 4 | L4₹2.2 LAdmitted-Finance | -10.00% | ₹2.2 L | L4 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
9 Feb 2026, 6:00 pmClosed
Executive Engineer PWD RandB PROJECT DIVISION III
Office of the PWD RandB PROJECT DIVISION III JAMMU
Repair/Renovation of Govt. Qtr no. 55-C at Gandhi Nagar Jammu. CNO- 606 NP (2ND CALL)
2026_PWDJK_302192_3
Fresh Short e-NIT No. 135 of 2025-2026 Dated 03-02-2026
Open Tender
Civil Works
30 days
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB PROJECT DIVISION III
₹5,000
Office of the PWD RandB PROJECT DIVISION III JAMMU
14 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
9 Feb 2026
3 Feb 2026
5 Feb 2026
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Sal wood
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. (Note: -Butt hinges and necessary screws shall be paid separately).Second class D- wood : 35mm thick
providing and fixing glazed shutter for doors,windows and clerestory windows using 4mm thick float glass panes including ISI marked M.S pressed butt hinges finished of required size with necessary screws 30 mm second class deodar wood
Providing and fixing wire gauze shutters using galvanized M.S. wire gauze of average width for aperture 1.4 mm in both directions with wire of dia. 0.63 mm for doors, windows and clerestory windows with ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws as per direction of Engineer-in-charge :Second class deodar wood : 30mm thick
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in Superstructure including curing in Cement mortar 1:4 ( 1 cement : 4 coarse sand)including extra for upto five floor
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level
12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand
Providing & fixing 4mm thickness APP superthermoly stp sheet polyester based sheet black finishing( including 2 coats of silver colour paint) with hot torch treatment over RCC /cemented surface by following methods (i)applying with shalitex stp primer for bitumen membrane @0.40 liters/Sqm (ii) Mt. by the 4mm thickness APP superthermoly stp sheet polyester based sheet black finishing manufacturerer of density at@25*C ,0.87-0.89 kg/ liter over primer coated layer shall be laid using butane torch and sealing all the joints longitudinal as well as transverse prepare the surface complete. (iii) cut 1"deep grove above the roof surface on the parapet wall and seal edge of APP superthermoly stp polyester sheet into the groove with polymer modified mortar .(iv)Incase of low height parapets ,terminate APP superthermoly stp polyester sheet over the parapet. (v) For overlapping of joints, rub the polythylene side of membrane by wire brush,apply shali bond APP over the rubbed area ,allow it to the tacky and then fix the bituminous side of APP superthermoly stp sheet polyester with hot application (vi) For longitudinal and transverse joints overlap of 75mm and 100mm respectively is desired. The vital physical and chemical parameter of the membrane shall be as under:- Softening point of membrane not less than 150*C & cold flexibility shall be upto 0*C when tested in accordance with ASTM ,Joint strength in longitudinal amd transverse direction at 23*C as 350/300 N/5cm. Tear strength in longitudinal and transverse direction as 60/80N. in 4mm thick , the weight of Roll (40 kg for 1meter by 10 meter) (vii) incl single coat of aluminium paint at top complete job as per the direction of E.I.C
Providing and laying matt finished vitrified tile of specified size having water absorption less than 0.5% and conforming to IS: 15622 of approved make in all colours and shades in outdoor floors such as footpath, court yard multi models etc., laid on 20mm thick base of cement mortar 1:4 (1cement: 4 coarse sand) in all shapes & patterns including grouting the joints with white cement mixed with matching pigments etc. complete as direction of Engineer-in-Charge. 300x300x9.8 mm
providing and fixing of PVC panelling on walls 8 to 10 mm thick inc, all fitting and fixtures complete
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade, one or more coats on old work.
Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. 1MM THICK PUTTY
2MM THICK PUTTY
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound@ 0.253 kg/sqm.(b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm.(c) third layer of 1.5 mm thickness consisting of slurry of cement @1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg./sqm. and coarse sand @1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours.The entire treatment will be taken upto 30cm on parapet wall and tucked into groove in parapet all around.(d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately)For the purpose of measurement the entire treated surface will be measured.
Distempering with 1st quality acrylic distemper, having VOC (Volatile Organic Compound) content less than 50 grams/ liter, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. 13.89.2 Two coats
engaging unskilled labour for clearance of site
carpenter skilled for carrying out repair
mortice latch and lock
engage trolley for shifting of mulba froim site to outer area of municipality
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_980554.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid