| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹10.7 CrAccepted-AOC NOT AVAILABLE | ₹10.7 Cr Quoted ₹11.1 Cr | L2 | Accepted-AOC Admitted, as agreed with L1 rates and L1 denied to complete the work |
| 2 | L3₹11.7 CrRejected-Finance | ₹11.7 Cr | L3 | Rejected-Finance Due to Higher Rates |
| 3 | L4₹12.1 CrRejected-Finance AGRA ROAD ETA | ETA | ETA | UTTAR PRADESH | ₹12.1 Cr | L4 | Rejected-Finance Due to Higher Rates |
| 4 | L5₹12.2 CrRejected-Finance | ₹12.2 Cr | L5 | Rejected-Finance Due to Higher Rates |
| 5 | L6₹12.3 CrRejected-Finance | ₹12.3 Cr | L6 | Rejected-Finance Due to Higher Rates |
Tender Value
Refer Docs
EMD Value
₹30 L
Closing Date
17 Nov 2023, 12:00 pmClosed
Superintending Engineer Sitapur/Kheri Circle PWD S
Office of SE, Sitapur/Kheri Circile PWD Sitapur
Widening and Strenthening of BILRAYAN PANWARI ROAD (SH21) Km 99 to km 100(800) from 2 Lane to 4 Lane in District Sitapur
2023_CEUCZ_859289_1
4583/352C/E.TENDER/STP-LMP/23 Dt. 17.10.2023
Open Tender
Civil Works - Roads
180 days
Sitapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹30 L
Yes
Office of SE, Sitapur/Kheri Circile PWD Sitapur
15 Jan 2024
3 Nov 2023
17 Nov 2023
3 Nov 2023
17 Nov 2023
3 Nov 2023
6 Nov 2023
Amount
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Providing, Laying and spreading Material on a prepared base (WMM), cement @ 1% and 3.5% emulsion by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired uncofined compressive strength and to form a layer of base.
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of @ 0.25 Kg per sqm. kg per sqm on the prepared surface cleaned with hydraulic broom .
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 percent by weight of total mix and filler , transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 507 complete in all respects.
Providing and laying bituminious concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects.
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 430 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing (M-40 Grade)
600 mm Hume pipe Culvert Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation, protection works,back filling,concrete and masonary works in head walls and parapets
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed, placed in foundation and compected by vibration including curing for 14 days.
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4
Plastering with cement mortar (1:3)on brick work in substructure/superstracutre as per technical specification.1300&2200 s.n.13.3
RCC DRAIN Providing and laying reinforced cement concrete M 20 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5
Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses 1002, 1010 and 1202
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine
M/s Raj Laxmi Enterprises
RAM SANEHI AND SONS
SHAKUNTALA SINGH
M/S SOBTI INFRATECH LIMITED
M/S DEEPAK KUMAR AGARWAL
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid