| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L Quoted ₹3.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.5 L+₹1,313.55 (0.37%)Rejected-AOC | ₹3.5 L+₹1,313.55 (0.37%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | R VIGNESHKUMAR L1 | RAJAGANESH CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00DRAIN | |||||
| 1.01 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 53.7 | M3 | 197.5 ₹10,605.75 Lowest | 199 ₹10,686.3 |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one Part of cement, four Part of M- Sand and Eight Part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 9.7 | M3 | 5,692 ₹55,212.4 Lowest | 5,699 ₹55,280.3 |
| 3.00 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. | 156.3 | M2 | 575 ₹89,872.5 Lowest | 577 ₹90,185.1 |
| 4.00 | Plain Cement Concrete 1:2:4 Mix (one Part of cement, two Part of M- Sand and four Part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 23.5 | M3 | 7,026 ₹1,65,111 Lowest | 7,029 ₹1,65,181.5 |
| 5.00 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one part of cement, two part of M-sand and four part of aggrigate) using 10 to 12mm stone chips – 25mm tk etc., including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. | 38 | M2 | 307.5 ₹11,685 Lowest | 309 ₹11,742 |
| 6.00 | Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3. | 100 | KG | 92.5 ₹9,250 Lowest | 99 ₹9,900 |
| 7.00 | Reinforced Cement Concrete 1:1.5:3 (One Cement, One and half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including Super Plasticiser, mixing charges for machine mix, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix | 1 | M3 | 8,924 ₹8,924 Lowest | 8,999 ₹8,999 |
Tender Value
₹4.2 L
EMD Value
₹4,200
Closing Date
27 Feb 2026, 3:00 pmClosed
EXECUTIVE OFFICER
CHINNALAPATTI TOWN PANCHAYAT
GENERAL FUND 2025-26 CONSTRUCTION OF DRAIN WITH CULVERT ,7TH WARD COUNCILER HOUSE BACK SIDE AND 10TH WARD ROYAL CINEMA STREET IN CHINNALAPATTY TOWN PANCHAYAT
2026_DTP_663638_1
27/2026/HC
Open Tender
Civil Works
Works
30 days
CHINNALAPATTI
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,200
26 Mar 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
DRAIN
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications.
Plain Cement Concrete 1:4:8 Mix (one Part of cement, four Part of M- Sand and Eight Part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86.
Plain Cement Concrete 1:2:4 Mix (one Part of cement, two Part of M- Sand and four Part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one part of cement, two part of M-sand and four part of aggrigate) using 10 to 12mm stone chips – 25mm tk etc., including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications.
Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3.
Reinforced Cement Concrete 1:1.5:3 (One Cement, One and half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including Super Plasticiser, mixing charges for machine mix, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_796725.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .