Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.4 LAccepted-AOC NEW BANSBARI NH 34 PO JHALJHALIA DIST MALDA PIN 732 102 | MALDAH | WEST BENGAL | 732102 | L1 | Accepted-AOC Quoted rate found Lowest (L1) | |
| 2 | L2₹30.5 L+₹14,290.12 (0.47%)Rejected-AOC | L2 | Rejected-AOC Quoted rate found 2nd Lowest (L2) | |
| 3 | L3₹30.6 L+₹21,971.98 (0.72%)Rejected-AOC RAJA SARAT CHANDRA ROAD PURATULI ENGLISHBAZAR DIST MALDA PIN 732101 | MALDAH | WEST BENGAL | 732101 | L3 | Rejected-AOC Quoted rate found 3rd Lowest (L3) |
Tender Value
Refer Docs
EMD Value
₹61,594
Closing Date
8 Apr 2021, 12:00 pmClosed
EXECUTIVE ENGINEER PWD MALDA ELECTRICAL DIVISION
O/O THE EXECUTIVE ENGINEER PWD MALDA ELECTRICAL DIVISION Singatala Malda PIN 732101
Temporary Electrification work with Providing DG sets for preparedness of accommodation centres for CAPF/State Police forces in connection with Assembly Election 2021 - for 26 Nos Schools under Gazole PS as per Annexure - A
2021_WBPWD_330232_1
WBPWD/MED/e-NIQ-58/2021-21
Open Tender
ELECTRICAL WORKS ORG
Item Rate
5 days
Malda
Please refer Tender documents.
6 documents required · 6 mandatory
₹61,594
30 Apr 2021
20 Mar 2021
10 Apr 2021
20 Mar 2021
8 Apr 2021
26 Mar 2021
Amount
(i) Up to 3 days.
(ii) Next 7 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 80 Nos x 7 No of Days = 560 Nos)
S & providing on hire basis 500V/220V, 32A / way, 6 way PDB with isolator on wooden plank board or suitable angle iron frame incl. providing inter coonection, socketing, earthing attachment etc. & dismantling the same at the end of the function (With PWD approve materials).
(i) Up to 3 days.
(ii) Next 7 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 160 Nos x 7 No of Days = 1120 Nos)
S & providing on hire basis Main Switch with 1.1 KV grade PVC / A Al cable of folllowing sizes incl. laying in trench / wall with shadding arrangement dismantling the same & mending good the damage at the end of the program (With PWD approve materials).
(a) 4 core 16 sq. mm. PVC / A cable.
(i) Up to 3 days.
(ii) Next 7 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 1300 Mtrs x 7 No of Days = 9100 Mtrs)
(b) 2 core 4 to10 sq. mm. PVC / A cable.
(i) Up to 3 days -
(ii) Next 7 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 9200 Mtrs x 7 No of Days = 64400 Mtrs)
S & drawing on hire basis 2x1.5 sq. mm. / 4 sq. mm PVC Cu. wire incl. dismantling the same at the end of function.
(i) Upto 3 Days.
(ii) Next 7 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 13000 Mtrs x 7 No of Days = 91000 Mtrs)
S & providing on hire basis 4 Ft. 40 watt Single Tube Light (commercial type) fitings with necessary Tube lamp & replacement of fuse lamp.
(i) Upto 3 Days.
(ii) Next 7 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 500 Nos x 7 No of Days = 3500 Nos)
S & providing on hire basis LED Bulb with necessary accessories.
(i) Upto 3 Days.
(ii) Next 7 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 449 Nos x 7 No of Days = 3143 Nos)
Supplying & Providing on hire basis 200 V AC 1400 mm sweep ceiling fan with down rod as reqd. incl. dismantling the same.
(i) Upto 3 Days.
(ii) Next 7 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 881 Nos x 7 No of Days = 6167 Nos)
Distribution wiring with 2 x 1.5 sq.mm. PVC Cu. Wire to light / fan points in alkathine pipe on hire basis & dismantling the same at the end of the program. (Without individual control switch).
(i) Upto 3 Days.
(ii) Next 7 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 1830 Pts x 7 No of Days = 12810 Pts)
Supplying & Providing on 600 mm sweep Air Circulator.
(i) Upto 3 Days.
(ii) Next 7 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 150 Nos x 7 No of Days = 1050 Nos)
Supplying & Providing on hire basis ( 3 Nos.) 5 amp plug point on casing board with earthing attachment. (For Mobile Charger and Stand Fan).
(i) Upto 3 Days.
(ii) Next 7 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 1521 Pcs x 7 No of Days = 10647 Pcs.)
S & providing on hire basis 250 watt Metal Hallide fitings with necessary clamping arrangemnt to be fixed on existing wooden / bamboo or on wall incl. gear box & replacement of fuse lamp.
(i) Upto 3 Days.
(ii) Next 7 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 128 Nos x 7 No of Days = 896 Nos)
Earthing the installation with 50 mm. dia G. I. pipe 2.5 Mtr. to 3 Mtr. long & 6 / 8 SWG G. I. wire with bolts, nuts etc.below the GL on hire basis & dismantling the same at the end of the program.
(i) Upto 3 Days.
(ii) Next 7 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 292 Nos x 7 No of Days = 2044 Nos)
Hiring & Installation charges for the following capacity DG Sets. incl. All accessories.
(i) 5 KVA DG (Single phase) for 26 Nos School for 10 days. (No of Days 10 x Total no. of DG 28) = 280 Nos.
(ii) 30 KVA DG (Three phase) for 26 Nos School for 10 days. (No of Days 10 x no. of DG 1 x no. of schools 26) = 260 Nos.
To and fro Transportation charges incl. loading & unloading of D.G sets and electrical equipments.
(i) 5 KVA DG sets and electrical equipments for 26 Nos School.
(ii) 30 KVA DG sets and electrical equipments for 26 Nos School.
Charge of Electrical Supervisor 01 No. for each shift x 3 shift per day for 10 days for each of 26 Nos School. (Qty. = No of shift 3 x No of days 10 x no of School 26 = 780)
Fuel consumption for DG Set with during consumption.
(i) For 5 KVA DG Set. @ 2 Ltr./DG/Hr. (Qty. = No. of DG 28 x no of days 10 x no of working hours 4 = 1120 Hrs.).
(ii) For 30 KVA DG Set. @ 8 Ltr./DG/Hr. (Qty. = No. of DG 26 x no of days 10 x no of working hours 4 = 1040 Hrs.).
N.B.: 1) Rate should be inclusive of all taxes, duties & CESS etc including GST which will not be paid extra (on Item No. 01.00 to 15.00). 2) Bidders are requested to quote Rate for the Items Sl. Nos. 01.01, 02.01, 03.02, 3.05, 04.01, 05.01, 06.01, 07.01, 08.01, 09.01, 10.01, 11.01, 12.01, 13.01, 13.02, 14.01, 14.02, 15.00, 16.01 & 16.02 as spelt out in the BOQ . The rate for the items Sl. Nos. 01.02, 02.02, 03.03, 3.06, 04.02, 05.02, 06.02, 07.02, 08.02, 09.02, 10.02, 11.02 & 12.02 will be calculated automatically. 3)The bidder will have to quote the fuel rate based on the market rate on the date of bidding. 4) The cost of fuel may be charged depending on the actual cost of fuel during the time of execution of work. Log book to be maintained strictly on daily basis.
M/S ESAR ENTERPRISE
ARGHYA BHATTACHARYA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .