Tender Value
₹8.2 L
EMD Value
₹8,500
Closing Date
16 Apr 2025, 3:00 pmClosed
Block Development officer VP Pacnchayat union offi
Block Development officer VP Pacnchayat union office Vellakovil
Development of Public Burial Ground at Ponparapi H/O Veeracholapuram waiting shed S.F.No.88 CC Road 30m Compound wall 15 mtr and Pipeline extension 50 mtr
2025_RDTN_542417_4
ROC NO 2260/2024/A1 Dt 03.04.2025
Open Tender
Civil Works - Roads
Item Rate
120 days
Pacnchayat union office Vellakovil
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,500
Yes
Pacnchayat union office Vellakovil
17 Apr 2025
9 Apr 2025
16 Apr 2025
9 Apr 2025
16 Apr 2025
9 Apr 2025
11 Apr 2025
Amount
1.Development of Public Burial Ground at Ponparapi H/O Veeracholapuram (waiting shed -S.F.No.88), CC Road - 30m , Compound wall- 15 mtr , and Pipeline extension -50 mtr
Earth work excavation and depositing on bank with in initial lead lift in Hard gravelly soil for foundation etc. complete.
Cement concrete 1:4:8mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Rrefilling with excavated earth including all labour charges as per standard specification.
Filling the basement with M.sand including cost and conveyance and all labour charges etc complete as per standard specification.
Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
For Foundation and Basement
For Superstructure in ground floor
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00 in height including cost and conveyance of all materials to site and all labour charges etc complete.
Below Ground level
Above Ground level
For roof slab , lintel and beam
Sunshade
Supplying and Fabrication Steel rainforcement including all cost and conveyance etc complete
RCC 1:1.5:3 mix using 20mm HBG ISS Metal including all cost and conveyance etc complete
For Foundation and Basement
For Superstructure in ground floor
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
Supplying and painting the Cieling with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work).
Provding and finishing over slopped RCC roof or Sunshade with one course of Ornamental tiles of size 23 x 15 x1.2cm for front elevation laid with 5c,[ Cement Mortar 1:3 (one cement three sand 20mm thick and pointed with same mortar mixed including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Distempering two coats over NEW Plastered surface using Oil Bound Distemper including cost and all Labour charges etc., complete
CC Pavement
Earth work excavation and depositing on bank with in initial lead lift in hard gravelly soil for foundation etc. complete.
Plain Cement concrete 1:3:6 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, etc.,Complete
Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and and conveyance of all materials to site and all labour charges etc complete.
Provision for Tar Sheet using Bituminious Pad
Providing Compound wall including all cost etc., complete
Earth work excavation and depositing on bank with in initial lead lift in hard gravelly soil for foundation etc. complete.
Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and filling in Basement with filling sand well rammed, watered and consolidated complying with standard specifications etc., complete.
Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, etc.,Complete
Below Ground level
Column
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., Complete complying with standard specification.
RCC 1:1.5:3 mix using 20mm HBG ISS Metal including all cost and conveyance etc complete
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Painting two coats of interior/Exterior emulsion with best approved first quality of emulsion paint of approved colour over one of priming coat etc., complete complying with standard specifications.
Towards Cost and supply of Grill Gate including all cost etc., complete
Water Supply
Earth work excavation below G.L. and depositing on bank within an initial lead of 10.00 m and an initial lift of 2.00 for the following classification of soil
Supply and delivery of 63mm (4KSC) - PVC pipe including all cost etc., complete
Laying and jointing of 63mm OD Pvc Pipe and specials with Proper grade and alignment
Refilling the trenches with exavated soil after the pipes are laid as direted
Provision for specials
Provision for 500 litre Syntex tank and Bed
Provision for Scheme Name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
S.SIVASATHYAMOORTHY (BID ID -1302715)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .