Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 CrAccepted-AOC AT PO CHIKITIPENTHO PS K NUAGAM DIST GANJAM ODISHA PIN 761010 | CHIKITIPENTHO | GANJAM | ODISHA | 761010 | L1 | Accepted-AOC 1st lowest bidder | |
| 2 | L2₹11.0 Cr+₹4.8 L (0.44%)Rejected-AOC KHATA NO 930 38 WARD NO 02 NEAR JAGANNATH TEMPLE DHARMAGARH 766015 DIST KALAHANDI ODISHA | DHARMAGARH | KALAHANDI | ODISHA | 766015 | L2 | Rejected-AOC 2nd lowest bidder | |
| 3 | L3₹11.1 Cr+₹17.3 L (1.58%)Rejected-Finance AT PO BANGOMURDA DIST BALANGIR ODISHA | BANGOMURDA | BALANGIR | ODISHA | L3 | Rejected-Finance 3rd lowest bidder | |
| 4 | L4₹11.2 Cr+₹25.6 L (2.34%)Rejected-Finance AT POST BANGOMUNDA DIST BALANGIR 767040 | BALANGIR | BALANGIR | ODISHA | 767040 | L4 | Rejected-Finance 4th lowest bidder | |
| 5 | L5₹11.7 Cr+₹73.5 L (6.72%)Rejected-Finance NEAR MEGHANA BIDI OFFICE WARD NO 29 PO BUDHRAJA 768004 DIST SAMBALPUR | SAMBALPUR | SAMBALPUR | ODISHA | 768004 | L5 | Rejected-Finance 5th lowest bidder |
Tender Value
₹11.4 Cr
EMD Value
₹11.4 L
Closing Date
21 Jan 2025, 5:00 pmClosed
Chief Engineer, Bridges, Odisha
Nirman Soudha, O/o EIC (Civil), Odisha, Bhubaneswar
Construction of H. L. Bridge over Sanjore Nallah at km 0.840km on Patrapalli to Tengra road (ODR) in the District of Balangir under State Plan for the year 2024-25
2025_EICCL_109014_3
CE-BRIDGES-12/2024-25
Open Tender
Civil Works - Bridges
Percentage
730 days
In the District of Balangir
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹11.4 L
Yes
15 Sept 2025
6 Jan 2025
22 Jan 2025
6 Jan 2025
21 Jan 2025
6 Jan 2025
6 Jan 2025 - 20 Jan 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation in all kinds of soil etc as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required complete in all respect as per Clause 301 & 304 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge. | 1,714.73 | Cum | 59.52 | ₹1,02,060.73 |
| 2 | PCC M-15 Grade of CD & structure work using 40 to 10mm size crushed stone aggregates mixed by Batching plant, laying in layers and compacting including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Section 1700 & 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 110.31 | Cum | 4,078.91 | ₹4,49,944.56 |
| 3 | Supplying, Fitting, Fixing, Placing and Driving in position Steel Liner of 6mm to 10mm thick for Pile shaft including cost, conveyance all materials & cost of all labour etc complete as per approved Drawing & Technical Specifications and Section 1100 & 1900 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 41.79 | MT | 1,00,502 | ₹41,99,978.58 |
| 4 | RCC M-35 grade Bored cast-In-situ pile of 1.200m dia excluding reinforcement complete including removal of excavated earth with all leads & lifts up to 1000mtr including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Section 1100 & 1700 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 850.4 | RM | 8,845.1 | ₹75,21,873.04 |
| 5 | RCC M-35 grade in Pile Cap for abutment and pier with formwork using 20 to 10mm size crushed stone aggregates mixed by Batching plant, laying with all leads and lifts & compacting including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Section 1100/1200, 1500 & 1700 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 790.4 | Cum | 6,704.81 | ₹52,99,481.82 |
| 6RCC M-30 grade in different items of Bridge with formwork using 20 to 10mm size crushed stone aggregates mixed by Batching plant, laying in layers and compacting including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Section 1200, 1500 & 1700 of MoRT&H Specifications for Road & Bridge works (5th Revision). | |||||
| 6.1 | Abutment & Pier Shaft | 215.63 | Cum | 7,812.91 | ₹16,84,697.78 |
| 6.2 | Abutment & Pier Cap | 62.82 | Cum | 7,282.25 | ₹4,57,470.95 |
| 6.3 | Return Wall Foundation | 18.62 | Cum | 6,220.93 | ₹1,15,833.72 |
| 6.4 | Retaining Wall Foundation | 188.5 | Cum | 5,407.12 | ₹10,19,242.12 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_523659.xls
BOQ • 2.69 MB
160168417.pdf
Tender Documents • 3.98 MB
160168419.html
Tender Documents • 0.05 MB
DTCN_SANJORE.pdf
Tender Documents • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .