Tender Value
₹12.5 L
EMD Value
₹13,000
Closing Date
29 Jan 2020, 12:00 pmClosed
SE ETC II MORADABAD
220 KV S/S CAMPUS MAJHOLA MORADABAD
WORK OF REPLACEMENT OF ALL GASKET OF 100 MVA T/F AT 220 KV S/S NEHTAUR (BHEL make) UNDER ETD DHAMPUR.
2019_UPTCL_412635_2
E-T-302/ETC-II/M/2019
Open Tender
Electrical Works
45 days
DHAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
EE ETD AMROHA
₹13,000
31 Jan 2020
17 Jan 2020
29 Jan 2020
17 Jan 2020
29 Jan 2020
17 Jan 2020
Amount
WORK OF REPLACEMENT OF ALL GASKET OF 100 MVA T/F AT 220 KV S/S NEHTAUR (BHEL make) UNDER ETD DHAMPUR.
Shifting of empty oil drums from store to near 100 MVA T/F
Draining of complete oil from 100MVA transformer at 220 KV S/S Nehtaur into 209 litre drums and 20 KL oil tanker.
Partially dismantling & safe stacking of Mulsifire air Pipe line, water pipe line and proper stacking.
Dismantling of 100 MVA Transformer, conservator tank, oil pipe lines, all bushings turrets, fan motors, marshalling box, OLTC panel etc. to complete the job satisfactory, including proper stacking and all T&P etc. shall be arranged by the contractor at his own cost .
Replacement of old and damage gasket of 100 MVA T/F make of good quality rubberized cork sheet Kotika/Telbroze/NU-Cork make at following details below. Providing and making of Top Cover gasket of 100 MVA T/F opening of nut and bolt removal of damage gasket cleaning of top surface & making new gasket & fixing in proper gasket.
Providing and making of HV Turret Gasket.
Providing and making of HV bushing gasket.
Providing and making of LV Turret Gasket.
Providing and making of LV bushing gasket.
Providing and making of Radiator gasket.
Providing and making of Radiator Valve gasket.
Providing and making of gasket of inspection cover.
Providing and making of gasket of 6” butter fly valve.
Providing and making of Radiator pipe line 6” dia.
Providing and making of C.T. inspection cover HV/LV.
Providing and making of C.T. inspection cover TV
Providing and making of C.T. inspection cover N
Providing and making of 1” Dia pipe line Gasket.
Providing and making of Surge Relay gasket.
Providing and making of Gasket Buchholz Relay.
Providing and making of gasket of PRV
Providing and making of OLTC plate.
Providing and making of 1” dia Valve gasket.
Providing and making of 4” dia Valve gasket.
Providing and making of 2” dia Valve gasket.
Providing and making of TV Bushing gasket.
Providing and making of N Bushing gasket.
Providing and making of Flow indicator gasket.
Providing and making of gasket of oil pump
Providing and making of gasket 3” dia Valve.
Providing and making of gasket WT/OTI pocket.
Providing and making of gasket of header.
Providing and making of gasket of conservator tank.
Providing and making of gasket of OLTC tank.
Providing and making of nylon washer of radiator, Bushing, Air releasing plugs.
Providing and making of gasket of NRV.
Providing and making of gasket of MOG.
Replacement of different nut & bolts of main tank oil Pipe line.
Complete evacuation of 100 MVA Transformer main tank and filling of Dry Air/Dry Nitrogen of dew point -50°C or better in vacuum up to pressure of 0.25Kg/Cm² and the again evacuating the Transformer tank after required time interval (approx12/24 Hrs) using centrifushing machine. The work shall including connecting pipe of machine as required measuring Due Point values of N2 after every cycle till the required value is achieved.
Flushing of transformer main tank by hot oil remove of sludge from the bottom of main tank create the vacuum inside the T/F tank and maintain it for 24Hrs.
Overhauling of diverter switch after drain out of dirty oil.
Complete erection of 100 MVA T/F at 220 KV S/S, Nehtaur by erecting radiators, headers, conservator tank HV/LV bushing, all pipe lines, bucholz relay, OSR, PRV, erection of marshaling box, driving mechanism, cooling fans, oil pumps & all other links etc. complete in all respect, radiators, oil pipe lines, conservator tank & attending the oil leakage if any after putting the Transformer in vacuum for 24 Hrs & all other associated work to complete the job satisfactorily as per instruction manual or direction of the Engineer.
Create the vacuum inside the transformer tank & maintain it for 24 Hrs. filling the oil step by step in 100 MVA T/F
Filling the Transformer oil in oil tank and its centrifuging upto required BDV.
Centrifuging of complete transformer oil in transformer main tank by connecting centrifuging machine to be provided by the Contractor and taking the BDV & I.R. values of the oil periodically till the required value is achieved as per direction of supervising engineer & as per Tech Spec.. Enclosed. (Centrifuging Machine shall be provided by the Contractor).
Re erection of Mulsifire air Pipe line, water pipe line and proper checking of leakage.
Carriage of 20 KL empty T/F oil tank for the centrifuging of T/F oil where it is available within distance of 50 Kms approx.
SUN ENGINEERING WORKS
Versha and Brothers
Gupta Elect and Engg Works
Meena Elect and Engg Works
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid