Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹58.3 LAdmitted-Finance | -34.87% | ₹58.3 L | L1 | Admitted-Finance |
| 2 | L2₹64.6 LAdmitted-Finance | -27.86% | ₹64.6 L | L2 | Admitted-Finance |
| 3 | L3₹66.9 LAdmitted-Finance | -25.25% | ₹66.9 L | L3 | Admitted-Finance |
| 4 | L4₹75.2 LAdmitted-Finance | -15.99% | ₹75.2 L | L4 | Admitted-Finance |
Tender Value
₹89.5 L
EMD Value
₹1.8 L
Closing Date
4 Apr 2026, 3:00 pmClosed
Executive Engineer
EE / HCD-2/DDA
Dismantling existing RCC wall and Construction of RCC wall at Ashoka Park, New Friends Colony.
2026_DDA_904022_1
25/EE/HCD-2/DDA/2025-26
Open Tender
Civil Works
150 days
As Per NIT
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.8 L
28 Apr 2026
30 Mar 2026
6 Apr 2026
30 Mar 2026
4 Apr 2026
30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | |||||
| 2Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | |||||
| 3negative of bars | |||||
| 4Earth work in excavation by mechanical means (Hydraulic excavator) / in manual means in foundation trenches or drains (not exceeding 1.5 m width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | |||||
| 5Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | |||||
| 6Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – All work up to plinth level : a) 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size derived from natural sources). | |||||
| 7Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-lll) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | |||||
| 8Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | |||||
| 9Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, girders, bressumers and cantilevers. | |||||
| 10Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_950205.xls
BOQ • 0.36 MB
NIT25.pdf
Tender Documents • 2.71 MB
Download all tender documents and submit your bid