Tender for providing 11 KV HT Line to proposed 11 0.4 KV 100 KVA substation for SOP to 1 x 30 HP motor connection of Tubewell of Jal Shakti Vibhag at village Harwal (Lower Gondpur Banehra) under ESD HPSEBL Daulatpur Chowk. (T.S. No. 10 202627)
2026_HPSEB_138253_1
OCU/01/2026-27
Open Tender
Electrical Works
Tender cum Auction
Village Harwal ED Gagret
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
₹17,919
21 Jul 2026
6 Jul 2026
14 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ERECTION PART of New 11 kV HT line | - | - | - | - |
| 2 | Erection of S.T Single Pole 9 Mtr. Long :- Digging of Pit, fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. | 8 | No. | 6,033.34 | ₹48,266.72 |
| 3 | Erection of S.T Double pole Pole 9 Mtr. Long :- Digging of Pit, fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. | 2 | Set | 12,628.36 | ₹25,256.72 |
| 4 | Erection of S.T Double pole Pole 11 Mtr. Long :- Digging of Pit, fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. | 1 | No. | 6,033.34 | ₹6,033.34 |
| 5 | Erection of HT Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. | 9 | Nos | 1,780.62 | ₹16,025.58 |
| 6 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. | 15 | Set | 2,338.76 | ₹35,081.4 |
| 7 | Stringing and sagging conductor:- Laying of conductor (ACSR 7/4.26 mm 100 mm²) stringing and sagging, binding with insulator complete in all respect. | 2.3 | P/w / P/Kms | 24,731.62 | ₹56,956.92 |
| 8 | Erection Part of 11/0.4 KV, 100KVA Transformer & bus Bar Str. | - | - | - | - |
| 9 | Erection of 11/0.4 KV , 100 KVA S/Stn :- Digging of Pit, Drilling of Holes In X Arms, Preparation of Platform Structure (Members Ci, Ai I.E. X0Arm & Knee Bracing Set), Erection of D Pole, Concreting 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size), Erection of Platform, Erection of X0Arms, Drop0Out, Erection of 2 Nos Stay Set, Erection of Jumper, Digging of pit, Fixing of earth rod, clamp, earth wire and connecting to the structure, Earthing for 3 Nos Earths, Providing Charcoal and Salt for the earthing, Filling of the pit with material, Providing Earthing Conn. To G.O Switch, Lightning Arrestor Etc.& Poles, Providing earthting to the Transformer, LT Box, Meter Box etc, Barbed Wire & Painting. and Erection of 100 kVA Transformer, LT Box, MCCB Switch, Cable, service Cable and Energy Meter. Providing earthing connection to Transformer as per REC Board Standard complete in all respect , includes lifting, loading, unloading, all misc work required to complete the work in all respect. | 1 | No. | 77,052 | ₹77,052 |
| 10 | Erection for underneath DTR Structure:- Digging of Pit, Drilling of Holes In X Arms, Preparation of Platform Structure (Members Ci, Ai I.E. X0Arm & Knee Bracing Set), Erection of D Pole, Concreting 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size), Erection of Platform, Erection of X0Arms, Erection of 2 Nos Stay Set, Erection of Jumper, Digging of pit, Fixing of earth rod, clamp, earth wire and connecting to the structure, Earthing for 3 Nos Earths, Providing Charcoal and Salt for the earthing, Filling of the pit with material, Providing Earthing Conn. To G.O Switch, Lightning Arrestor Etc.& Poles, Barbed Wire & Painting, includes lifting, loading, unloading, all misc work required to complete the work in all respect. | 1 | No. | 56,640 | ₹56,640 |
stage.html
html • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.67 MB
Tendernotice_2.pdf
PDF • 2.34 MB
Tendernotice_3.pdf
PDF • 1.55 MB
Tendernotice_4.pdf
PDF • 4.07 MB
BOQ_204763.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .