Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹62.4 LAdmitted-Finance FF 09 2ND FLOOR SHUBHAM CORPORATE ABOVE INDUS LAND BANK SAPNA SANGEETA INDORE 452004 | 452004 | Admitted-Finance | |
| 2 | ₹69.9 LAdmitted-Finance SP 52 MPPGCL COLONY BIRSINGHPUR DISTT UMARIA 484 552 M P | BIRSINGHPUR | UMARIA | MADHYA PRADESH | 484552 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TROVON INDUSTRIES PRIVATE LIMITED | K K POWER CONSTRUCTION |
|---|---|---|---|---|---|
| 1.00For 4x210MW CHP-I | |||||
| 1.01 | Fabrication & Installation of Extended platform at old track hopper toward CCS yard side. (Approx. length 200 Mtr | 1 | job | 2,42,880 ₹2,86,598.4 Lowest | 2,72,159 ₹3,21,147.62 |
| 1.02 | Dismantling & installation of new fabrication side wall jalli Old track hopper. Size 3450 x 2000mm. As per drawing no. CHP/OTH/Side/jalli/001. | 12 | nos | 1,85,760 ₹2,19,196.8 Lowest | 2,08,320 ₹2,45,817.6 |
| 1.03 | Dismantling & installation of new fabrication side wall jalli Old track hopper. Size 2870 x 2000mm. As per drawing no. CHP/OTH/Side/jalli/002 | 8 | nos | 1,19,992 ₹1,41,590.56 Lowest | 1,34,400 ₹1,58,592 |
| 1.04 | Fabrication and erection of covered shed over conveyor 9A & 9B | 2 | nos | 34,900 ₹41,182 Lowest | 39,200 ₹46,256 |
| 2.00For 4x210MW CHP-II | |||||
| 2.01 | Strengthening by fixing MS plate, channels, beams, angles of structural supports of conveyor belt 1 A/B under tunnel area and one time complete replacement of floor plates along with fixing of support angles from hopper no. 1 to 20. (Approx. length 380 Mtr.) | 1 | job | 4,14,980 ₹4,89,676.4 Lowest | 4,64,800 ₹5,48,464 |
| 2.02 | Fixing of angles in structure and chequered plate of conveyor 1 A/B near stone picker stands. Strengthening of beams & braces by fixing plates/angles/ channels in tower structure. (Approx. length 380 Mtr.) | 1 | job | 4,14,980 ₹4,89,676.4 Lowest | 4,64,800 ₹5,48,464 |
| 2.03 | Strengthening by fixing MS plate, channels, angles of structural supports of conveyor belt 2 A/B along with complete replacement of floor plate and replacement of chequered plate. (Approx. length 340 Mtr.) | 1 | job | 3,74,500 ₹4,41,910 Lowest | 4,20,000 ₹4,95,600 |
| 2.04 | Strengthening by fixing MS plate, channels, angles of structural supports of conveyor belt 4 A/B and Fixing of angles in structure and chequered plate of conveyor 4 A/B near stone picker stands. Complete replacement of floor plate and replacement of chequered plate.
(Approx. length 380 Mtr.) | 1 | job | 4,14,980 ₹4,89,676.4 Lowest | 4,64,800 ₹5,48,464 |
Tender Value
₹62.4 L
EMD Value
₹1.2 L
Closing Date
25 Sept 2025, 3:30 pmClosed
SE PNW SGTPS Birsinghpur
SE PNW SGTPS Birsinghpur
Work proposal for structure strengthening work of various conveyors of 4x 210 MW CHP Wagon Tippler and Fabrication and installation of Extended Platform and Jalli of both side at Old Track Hopper and covered shed for 4X210 MW CHP SGTPS
2025_MPPGC_418102_2
242
Open Tender
Miscellaneous Works
Fixed-rate
180 days
SGTPS
as per NIT
16 documents required · 16 mandatory
₹2,000
Yes
₹1.2 L
Yes
6 Oct 2025
11 Aug 2025
30 Sept 2025
11 Aug 2025
25 Sept 2025
11 Aug 2025
For 4x210MW CHP-I
Fabrication & Installation of Extended platform at old track hopper toward CCS yard side. (Approx. length 200 Mtr
Dismantling & installation of new fabrication side wall jalli Old track hopper. Size 3450 x 2000mm. As per drawing no. CHP/OTH/Side/jalli/001.
Dismantling & installation of new fabrication side wall jalli Old track hopper. Size 2870 x 2000mm. As per drawing no. CHP/OTH/Side/jalli/002
Fabrication and erection of covered shed over conveyor 9A & 9B
For 4x210MW CHP-II
Strengthening by fixing MS plate, channels, beams, angles of structural supports of conveyor belt 1 A/B under tunnel area and one time complete replacement of floor plates along with fixing of support angles from hopper no. 1 to 20. (Approx. length 380 Mtr.)
Fixing of angles in structure and chequered plate of conveyor 1 A/B near stone picker stands. Strengthening of beams & braces by fixing plates/angles/ channels in tower structure. (Approx. length 380 Mtr.)
Strengthening by fixing MS plate, channels, angles of structural supports of conveyor belt 2 A/B along with complete replacement of floor plate and replacement of chequered plate. (Approx. length 340 Mtr.)
Strengthening by fixing MS plate, channels, angles of structural supports of conveyor belt 4 A/B and Fixing of angles in structure and chequered plate of conveyor 4 A/B near stone picker stands. Complete replacement of floor plate and replacement of chequered plate. (Approx. length 380 Mtr.)
Strengthening by fixing MS plate, channels, angles of structural supports of conveyor belt 3 A/B along with complete replacement of floor plate and replacement of chequered plate. (Approx. length 300 Mtr.)
Strengthening by fixing MS plate, channels, angles of structural supports of conveyor belt 5A/B, 6A/B. Complete replacement of floor plate and replacement of chequered plate. (Approx. length 340 Mtr.)
Complete replacement of chequered plate in floor area of SCH along with strengthening of support structure of each floor. (Approx. length 380 Mtr. in all 4 floors)
Complete replacement of chequered plate in floor area of PCH along with strengthening of support structure of each floor. (Approx. length 380 Mtr. in all 3 floors)
Refurbishment of damaged return & carrying adjusting roller stands along with supply of required bushes, aligning plates with pin.
For Wagon tippler
Strengthening by fixing MS plate, channels, beams, angles of structural supports of conveyor belt 19A/B under tunnel area & in tower structure, both transfer point and repairing, refurbishment & strengthening of take-up structure of conveyor 19 A/B. Complete replacement of chequered plate of conveyor 19A/B Complete replacement of chequered plate in stairs of Conveyor 19A/B head along with strengthening of support structure. (Approx. length 750 Mtr.)
Strengthening by fixing MS plate, channels, angles of structural supports of conveyor belt 20A/B along with replacement of chequered plate & refurbishment, repairing and strengthening of its take up structure. (Approx. length 400 Mtr.)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .