Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.2 Cr
EMD Value
₹6.4 L
Closing Date
29 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
ELEC. GENL
18 conditions · 7 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
All financial documents submitted by bidders for financial eligibility, such as audited balance sheets, financial turnover certificates, and banking references towards liquidity (where applicable), and other CA-certified financial documents, shall invariably bear a valid UDIN (Unique Document Identification Number) issued by the Institute of Chartered Accountants of India (ICAI), wherever applicable. The financial documents submitted for evaluation shall be current, valid and relevant to the tender under consideration and shall conform to the eligibilityconditions stipulated in the tender document. Documents not complying with the prescribed requirements, including those not bearing a valid UDIN wherever applicable, shall not be considered for financial evaluation. {Authority: CEGE Letter no: SC/XXIX/Vig dated: 28/07/2026.}
32 conditions · 2 needing a document upload
The Stores materials which are supplied by Railways shall be collected from SSE/E/Works/SA stores duly transporting the same to the site by own cost borne by the contractor only.The released Railway materials if any should be handed over to the maintenance concerned SSE/Power stores duly getting forwarding acknowledgement from SSE/E/Works concerned.
I/We also hereby agree to abide by the updated Regulations of Tenders and Contracts and General Conditions of Contract issued by the Engineering Department of Indian Railways along with correction slips issued from time to time and to carry out the work according to the Special Conditions of Contract and specifications of materials and works as laid down by Railway in the Annexed Special Conditions / Specifications,Schedule of Work for the present contract.
All rates quoted in the tenders shall be deemed to be inclusive of CGST,SGST, IGST etc., payable by the contractor to the Government or any public body and no additional amount/rate or claim will be entertained on this account by the Railways. Also no claim whatsoever will be accepted by Railways on account of revision of tax rates, new taxes of statutory natureby State/Central Govt.
I/We also hereby agree to abide by the Indian Railways Standard General Conditions Of Contract, with all correction slips up-to date and to carry out the work according to the Special Conditions of Contract and Specifications of materials and works as laid down by Railway in the annexed Special Conditions/Specifications, Schedule of Rates with all correction slips up to date for the present contract
I/We have read the various conditions to tender attached hereto and agree to abide by the said conditions
I/We also agree to keep this tender open for acceptance for a period of 60 days from the date fixed for opening the same
I/We offer to do the work for Senior Divisional Electrical Engineer, Electrical General, Salem Division, Salem, at the rates quoted in the attached schedule and hereby bind myself/ourselves to complete the work in all respects within the period of completion stipulated in the tender document, from the date of commencement of work of the tender. The amount as stipulated in the tender document is herewith forwarded as Earnest Money. Full value of the earnest Money shall stand forfeited without prejudice to any other right or remedies in case my/our Tender is accepted and if : (a) I/We do not execute the contract documents as stipulated in performance guarantee clause of GCC 2022 as detailed in general instructions. (b) I/We do not commence the work within seven days after receipt of LOA/orders to that effect.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking. However, Railways shall have the right to incorporate any such condition quoted by us, in the contract, at their discretion, if contract is placed on us.
I/We have read the various conditions attached/ referred to in this tender document, and agree to abide by the said conditions.
All the tenderers/Contractors have to deposit full earnest money and tender document cost as stipulated for the tender, through online modes as permitted in IREPS application through multiple banks net banking, debit and credit cards only. On failing which offer will be summarily rejected.
The Tenderer should submit a copy of GST/PAN and NEFT Form.
The Contractor shall submit a statement to the effect that no retired Engineer or retired Gazetted Officer is associated with the tenderer as per Appendix-D. Tenders without the information above referred to or a statement to the effect that no such retired Engineer or retired Gazetted Officer is so associated with the tenderer, as the case may be, shall be rejected.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Payment of EMD and Tender form cost should be made on line only.
GCC 2022- All GCC clauses (updated including with all correction slips on date) are applicable.
i)For all the tenders having advertised cost of Rs. 10 lakh or above, the contractor shall have the option to take payment from Railways through a letter of credit (LC) arrangement. (ii)This option of taking payment through LC arrangement has to be exercised in IREPS (Indian Railway Electronic Procurement System - the e-application on which tenders are called by Railways) by the tenderer at the time of bidding itself, and the tenderer shall affirm having read over and agreed to the terms and conditions of the LC option.(iii) The option so exercised, shall be an integral part of the bidder's offer.(iv) The above option of taking payment through LC arrangement, once exercised by tenderer at the time of bidding, shall be final and no change shall be permitted, thereafter, during execution of contract.(v)In case tenderer opts for payment through LC, following shall be the procedure to deal release of payment through LC: (a) The LC shall be a sight LC.(b) The contractor shall select his Advising/Negotiating bank for LC. The incidental cost towards issue of LC and its operation thereof shall be borne by the contractor.(c) SBI, NewDelhi, Main Branch will be the nodal branch for issue of LCs based on online requests received from Railway Accounts Units for tenders opened in financial year 2026-27. SBI branches where the respective Railway AccountsOffice has its Account (local SBI branch) will be the issuance/reimbursing branch for LC issued under this arrangement. The Bank shall remain same for this tender till completion of contract. The incidental cost @ 0.15 % per annum of LC value,towards issue of LC and operation thereof shall be borne by the contractor and shall be recovered from his bills. (d)The LC shall be opened initially for duration of 180 to 365 days in consultation with contractor. The LC shall be extended time to time as per the progress of the contract, on the request of the contractor. The value of LC to be opened initially as well as extended thereafter shall be finalised by the engineer in consultation with the contractoron the basis of expected progress of work.(e)The LC terms and conditions shall inter-alia indemnify and save harmless the Railway from and against all losses, claims and demands of every nature and description brought or recovered against the Railways by reason of any actor omission of the contractor, his agents or employees, in relation to the Letter of Credit (LC). All sums payable/borne by Railways on this account shall be considered as reasonable compensation and paid by Contractor.
f)The LC terms and conditions shall inter-alia provide that Railways will issue a Document of Authorisation after passing the bill for completed work, to enable contractor to claim the authorized amount from their bank. (g)The acceptable, agreed upon document for payments to be released under the LC shall be the Document of Authorisation. (h)The Document of Authorisation shall be issued by Railway Accounts Office against each bill passed by Railways. (i)On issuance of Document of Authorisation, a copy of Document of Authorisation shall be posted on IREPS for download by the contractor. A digitally signed copy of Document of Authorisation shall also be sent by Railway Accounts Office to Railway's bank (Local SBI Branch). (j) The contractor shall take print out of the Document of Authorisation available on IREPS and present his claim to his bank (advising Bank) for necessary payments as per LC termsand conditions. The claim shall comprise of copy of Document of Authorisation, Bill of Exchange and Bill. (k) The payment against LC shall be subject to verification from Railway's Bank (Local SBI Branch). (l)The contractor's bank (advising bank) shall submit the documents to the Railways Bank (Local SBI Branch). (m) TheRailway's bank (issuing bank) shall, after verifying the claim so received w.r.t. the digitally signed Document of Authorisation received from Railway Accounts Office, release the payment to contractor's bank (advising bank) for crediting the same to contractor's account. (n)Any number of bills can be dealt within one LC, provided the sum total of payments to contractor is within the amount for which LC has been opened. (o)The LC shall be closed after the release of final payment including PVC amount, if any, to the contractor. (p)The release of performance guarantee or security deposit shall be dealt directly by Railway with the contractor i.e., not through LC
Salem Division-Capacity augmentation upto 300 Locomotives at Electric Loco Shed, Erode- Electrical Arrangements.
SA-E15-2026-27-W2~SR
SA-E15-2026-27-W2
Open
Works - General
12 Months
Salem, Tamil Nadu
₹0
₹6.4 L
6 Oct 2026
6 Oct 2026
15 Oct 2026
188 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 26,48,236 | ||
| — | 600.00 | — | — | ||
| Excavation of Cable trench in all kinds of soil including refilling as per description enclosed in Drg. No. CEE /CN/MS/01-2018. | — | — | — | 3,06,000 | |
| — | 200.00 | — | — | ||
| Excavation of Cable trench across the concrete flooring / road / track as per Drg.No.CEE/CN/MS/01-2018. | — | — | — | 1,44,000 | |
| — | 175.00 | — | — | ||
| Breaking of cement concrete flooring as instructed by Engineer-in-charge at site. | — | — | — | 90,125 | |
| — | 120.00 | — | — | ||
| Supply and provision of mass concrete for platforms or elsewhere with 1:3:6 ratio using 20 mm blue metal complete in a manner as directed by the Section Engineer in charge at site. | — | — | — | 7,38,000 | |
| — | 1000.00 | — | — | ||
| Labour charges for laying of HDPE pipes 50 mm dia PN 6 and PE 100 type in excavated trenches, on walls, platforms, platform shelters or any other required location, complete with suitable fixing arrangements and necessary coupling/jointing works, as directed by the Section Engineer-in-charge at site. Note: Required HDPE pipes will be supplied by Railways. | — | — | — | 34,000 | |
| — | 1747.00 | — | — | ||
| Labour charges for laying of HDPE pipes 110 mm dia PN 6 and PE 100 type in excavated trenches, on walls, platforms, platform shelters or any other required location,complete with suitable fixing arrangements and necessary coupling/jointing works, as directed by the Section Engineer-in-charge at site. Note: Required HDPE pipes will be supplied by Railways. | — | — | — | 83,856 | |
| — | 120.00 | — | — | ||
| Supply and fixing of Cable encasing pipe of 'B' class medium duty GI pipes 50mm Dia including one number of clamp made out of MS flat of 40mm x 6mm size, one per meter length of pipe and cable sealing compound on open end where ever required as directed by Engineer incharge at site. | — | — | — | 78,000 | |
| — | 100.00 | — | — | ||
| Supply and fixing of cable encasing pipe of 'B' class medium duty GI pipe of 100 mm dia, including one number of clamp made out of MS flat of size 40 mm x 6 mm, one clamp per meter length of pipe, and application of cable sealing compound at open ends wherever required, all complete as directed by the Engineer-in-Charge at site. | — | — | — | 89,300 | |
| — | 7455.00 | — | — | ||
| Supply and laying of 6 SWG GI wire along with the LTUG Cable, for earth continuity confirming to IS 12776 complete in an approved manner and as directed by Engineer in charge atsite. | — | — | — | 2,31,105 | |
| — | 100.00 | — | — | ||
| — | 1795.00 | — | — | ||
| — | 6200.00 | — | — | ||
| — | 4000.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
I_CT_GCC-
ATTACHMENT
TenderBooklet.pdf
ATTACHMENT
Drawings.pdf
ATTACHMENT
HTEarthing.pdf
ATTACHMENT
AnnexureI.pdf
ATTACHMENT
AnnexureII.pdf
ATTACHMENT
AnnexureIII.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .