Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.7 LAccepted-AOC NO 306 SCION AVENUE 4TH A CROSS KAGGADASPURA NEAR GANAPATHI TEMPLE BANGALORE 560093 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560093 | ₹30.7 L Quoted ₹31.0 L | L1 | Accepted-AOC BEING LOWEST |
| 2 | L2₹32.8 L+₹1.8 L (5.96%)Rejected-Finance NO 98 MARAPPA ROAD 1ST CROSS NAGAYANA PALYA M S NAGAR POST BANGALORE 560 033 | BENGALURU URBAN | KARNATAKA | 560033 | ₹32.8 L+₹1.8 L (5.96%) | L2 | Rejected-Finance NOT BEING LOWEST |
| 3 | L3₹34.2 L+₹3.2 L (10.3%)Rejected-Finance SR NO 281 3 7 ANAND NAGAR NEAR DHANORI JAKAT NAKA LOHEGAON PUNE 411047 | PUNE | PUNE | MAHARASHTRA | 411047 | ₹34.2 L+₹3.2 L (10.3%) | L3 | Rejected-Finance NOT BEING LOWEST |
| 4 | L4₹34.4 L+₹3.4 L (10.8%)Rejected-Finance | ₹34.4 L+₹3.4 L (10.8%) | L4 | Rejected-Finance NOT BEING LOWEST |
| 5 | L5₹36.2 L+₹5.2 L (16.9%)Rejected-Finance NO 45 5TH CROSS MALLAPPA LAYOUT BABUSAPALYA KALYAN NAGAR BANGALORE 560043 | BENGALURU URBAN | KARNATAKA | 560043 | ₹36.2 L+₹5.2 L (16.9%) | L5 | Rejected-Finance NOT BEING LOWEST |
| Sl No | Description | Qty | Unit | Sathya Sri Construction L2 | ARATHEERTHA CONCEPTS L7 | M/S Suresh Raju L5 | SCION ENTERPRISES L1 | TECKXPERT ENTERPRISES L8 | MAA ENGINEERING SERVICERS L6 | VP DEVELOPERS AND CONTRACTOR L3 | VAJRA CONSTRUCTIONS L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exc 1.5m wide and not exc. 1.5 m deep for foundation, manholes etc not exc. 10 sqm on plan and not exc. 1.5m depth and getting out in soft/loose soil etc complete all as specified and directed. | 200 | CUBIC METRE | 450 ₹90,000 | 555 ₹1,11,000 | 450 ₹90,000 | 500 ₹1,00,000 | 430 ₹86,000 | 600 ₹1,20,000 | 350 ₹70,000 | 200 ₹40,000 Lowest |
| 2.00 | All as per Sl Item No. 2 herein before, but for depth exceeding 1.5m and getting out in soft/loose soil etc complete all as specified and directed. | 32 | CUBIC METRE | 550 ₹17,600 | 625 ₹20,000 | 465 ₹14,880 | 550 ₹17,600 | 480 ₹15,360 | 620 ₹19,840 | 500 ₹16,000 | 300 ₹9,600 Lowest |
| 3.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm thick in any type of soil. | 162 | CUBIC METRE | 250 ₹40,500 | 155 ₹25,110 | 89 ₹14,418 | 200 ₹32,400 | 190 ₹30,780 | 50 ₹8,100 Lowest | 140 ₹22,680 | 100 ₹16,200 |
| 4.00 | Removing excavated material to a distance not exceeding 500m but not exc 1.5 KM and depositing where directed. | 70 | CUBIC METRE | 300 ₹21,000 | 755 ₹52,850 | 102 ₹7,140 | 500 ₹35,000 | 250 ₹17,500 | 50 ₹3,500 Lowest | 400 ₹28,000 | 300 ₹21,000 |
| 5.00 | Demolition of brick work or stone masonary built in cement mortar including quoins, arches, pillars etc and precast concrete articles and depositing off the rubbish materials outside MD land as specified and directed. | 54 | CUBIC METRE | 200 ₹10,800 | 855 ₹46,170 | 528 ₹28,512 | 500 ₹27,000 | 750 ₹40,500 | 300 ₹16,200 | 270 ₹14,580 | 100 ₹5,400 Lowest |
| 6.00 | Material and labour Pre-cast cement concrete block masonry of type C1,(1:3:6) using 20 mm graded stone aggregate of solid blocks exc. 10 cm in width and setting in cement mortar (1:6) complete all as specified and directed | 32 | CUBIC METRE | 8,000 ₹2,56,000 | 7,555 ₹2,41,760 | 6,810 ₹2,17,920 | 8,500 ₹2,72,000 | 6,800 ₹2,17,600 | 7,000 ₹2,24,000 | 6,000 ₹1,92,000 Lowest | 7,000 ₹2,24,000 |
| 7.00 | Material and labour for walling of squared rubble, uncoursed,well bonded,bedded and solidly hearted built in cement mortar (1:4) complete all as specified and directed. | 18 | CUBIC METRE | 7,000 ₹1,26,000 | 6,555 ₹1,17,990 | 6,210 ₹1,11,780 | 9,000 ₹1,62,000 | 6,600 ₹1,18,800 | 8,000 ₹1,44,000 | 6,000 ₹1,08,000 | 4,000 ₹72,000 Lowest |
| 8.00 | All as per Sl Item No. 7 above but except stones.
NOTE :- Serviceable stone as obtained from Sl Item No. 5 shall be re used. | 4 | CUBIC METRE | 4,000 ₹16,000 | 3,855 ₹15,420 | 1,450 ₹5,800 Lowest | 3,500 ₹14,000 | 5,800 ₹23,200 | 4,000 ₹16,000 | 4,000 ₹16,000 | 2,000 ₹8,000 |
| 9.00 | Material and labour rendering 15mm thick in cement plaster (1:4) on fair faces of brick work or concrete surfaces finishing the surfaces even and smooth without extra cement complete all as specified and as directed. | 100 | SQUARE METRE | 425 ₹42,500 | 325 ₹32,500 | 301 ₹30,100 | 300 ₹30,000 | 340 ₹34,000 | 340 ₹34,000 | 230 ₹23,000 Lowest | 300 ₹30,000 |
| 10.00 | Material and labour rendering 15mm thick in cement plaster (1:6) on fair faces of brick work or concrete surfaces finishing the surfaces even and smooth without extra cement etc complete all as specified and as directed. | 100 | SQUARE METRE | 400 ₹40,000 | 325 ₹32,500 | 301 ₹30,100 | 250 ₹25,000 | 320 ₹32,000 | 340 ₹34,000 | 246 ₹24,600 Lowest | 320 ₹32,000 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
2 Oct 2025, 6:00 pmClosed
LT COL CHANDRAKANT JOSHI
DRDO Complex, CV Raman Nagar PO, Bangalore 560 093
REPAIRS AND CLEANING OF SEWAGE LINES MANHOLES SEPTIC TANKS SOAK WELLS FILTER BEDS AND REPAIRS REPLACEMENT OF SEWER LINES MANHOLES AND CONNECTED ITEMS AT PHASE II ZONE A AND ZONE B UNDER GE I R AND D EAST BANGALORE
2025_MES_725455_1
8645/E8
Open Tender
Civil Works
Item Rate
365 days
GE I R AND D EAST BANGALORE
CLASS D CATEGORY a(ii)
8 documents required · 8 mandatory
₹500
Yes
GE I R AND D EAST BANGALORE
₹98,000
Yes
25 Oct 2025
6 Sept 2025
10 Oct 2025
6 Sept 2025
2 Oct 2025
20 Sept 2025
6 Sept 2025 - 19 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .