Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC Eligible |
| 2 | L2₹1.5 Cr+₹2.2 L (1.49%)Rejected-AOC FLAT NO 201 GF KAMAL VIHAR CGHS LTD PLOT NO 5 SECTOR 7 DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | ₹1.5 Cr+₹2.2 L (1.49%) | L2 | Rejected-AOC Not eligible |
| 3 | L3₹1.5 Cr+₹5.7 L (3.91%)Rejected-AOC | ₹1.5 Cr+₹5.7 L (3.91%) | L3 | Rejected-AOC Not eligible |
| 4 | L4₹1.6 Cr+₹16.7 L (11.4%)Rejected-AOC | ₹1.6 Cr+₹16.7 L (11.4%) | L4 | Rejected-AOC Not eligible |
| Sl No | Description | Qty | Unit | SHRI RAMSONS PROJECTS CORPORATION L2 | M/S SUVIDHA ENGINEERS (PROJECT) L3 | shivrefrigeration L4 | Radhe Krishn Engineering L1 |
|---|---|---|---|---|---|---|---|
| 1.00Schedule 'A' Part-I (BUILDING WORK) | |||||||
| 1.01 | Construction of Block of AC Plant Operator room complete all as shown in drawings and as specified. | 1 | Each Block | 14,41,441.41 ₹14,41,441.41 Lowest | 14,85,630 ₹14,85,630 | 21,01,000 ₹21,01,000 | 21,00,000 ₹21,00,000 |
| 1.02 | Construction of Block of AHU Building complete all as shown in drawings and as specified. | 2 | Each Block | 3,31,331 ₹6,62,662 Lowest | 4,95,270 ₹9,90,540 | 4,71,000 ₹9,42,000 | 5,50,000 ₹11,00,000 |
| 2.00Schedule 'A' Part - II (INTERNAL WATER SUPPLY) | |||||||
| 2.01 | Lump sum price worked out by contractor for "INTERNAL WATER SUPPLY ” as listed in Schedule ‘A’ Part- II. | 1 | Lump Sum | 11,111 ₹11,111 | 9,864 ₹9,864 | 9,000 ₹9,000 | 7,662 ₹7,662 Lowest |
| 3.00Schedule 'A' Part - III (INTERNAL ELECTRIC SUPPLY) | |||||||
| 3.01 | Lump sum price worked out by contractor for "“INTERNAL ELECTRIC SUPPLY ” as listed in Schedule ‘A’ Part- III. | 1 | Lump Sum | 1,21,121 ₹1,21,121 Lowest | 1,57,995 ₹1,57,995 | 1,22,867 ₹1,22,867 | 1,22,867 ₹1,22,867 |
| 4.00Schedule 'A' Part- IV (ROAD/ PATH/ CULVERT/ HARDSTANDING) | |||||||
| 4.01 | Lump sum price worked out by contractor for "ROAD/ PATH/ CULVERT" as listed in Schedule 'A' Part- IV. | 1 | Lump Sum | 2,21,221 ₹2,21,221 | 2,38,311 ₹2,38,311 | 2,32,300 ₹2,32,300 | 1,97,592 ₹1,97,592 Lowest |
| 5.00Schedule 'A' Part - V (EXTERNAL WATER SUPPLY) | |||||||
Tender Value
₹1.5 Cr
EMD Value
₹2.2 L
Closing Date
25 Sept 2025, 6:00 pmClosed
CWE AF BIKANER
HQ CWE AF BIKANER
PROVN OF CETNTRAL AC PLANT FOR URP BINS AT AF STN NAL
2025_MES_715840_2
81609/E8
Open Tender
Civil Works
Lump-sum
270 days
GE AF NAL
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
GE AF NAL
₹2.2 L
Yes
19 Nov 2025
28 Aug 2025
27 Sept 2025
28 Aug 2025
25 Sept 2025
11 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .