Loading…
Loading…
Tender Value
₹2.2 L
EMD Value
₹4,473
Closing Date
31 Aug 2026, 2:00 pm7d left
Assistant Engineer, Kalna Sub-Division, PWD
O/O Assistant Engineer, Kalna Sub-Division, PWD Madhuban, Kalna, PIN-713409
Repair work of Sub-Division Office, Section-I and Section-II Office under Kalna Sub Division Office Compound, P.W.D. in the district of Purba Bardhaman.
2026_WBPWD_5019267_1
WBPWD/AE/KAL/NIeT-02/2026-27
Open Tender
CIVIL WORKS
Percentage
Kalna PWD Office
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,473
Yes
Office of the Assistant Engineer, Kalna Sub-Divisi
19 Aug 2026
19 Aug 2026
2 Sept 2026
23 Aug 2026
31 Aug 2026
23 Aug 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. | - | Cum | 939 | - |
| 2 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor ncluding removing rubbish within a ead of 75 m as directed. | - | Sqm | 19 | - |
| 3 | a) Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent: 4 water: 6 cement) as per Manufacturer's specification [Cement to be supplied by the Department] | - | Sqm | 88 | - |
| 4 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar, (a) 20 mm thick plaster | 1 | Sqm | 151.57 | ₹151.42 |
| 4.1 | (b) 15 mm thick plaster | - | Sqm | 133.71 | - |
| 4.2 | (c) 10 mm thick plaster, 1.:4 cement morter | - | Sqm | 120.71 | - |
| 5 | Labour for taking out door and window frame including shutter for repair or replacement of different parts of the frame & refixing the same including mending good all damaes complete. (Concrete and brick work for mending damage will be paid separately) a) Upto area 2.5 Sq.m | 1 | Sqm | 119 | ₹118.88 |
| 6 | Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should
be correted upto three decimals). e) Sal : Malayasian | - | Cum | 75,572 | - |
| 7 | Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (Cost of concrete will be paid separately) (b) 40mm X 6mm, 200mm Length | - | Each | 25 | - |
| 8 | Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark. vi) 100mm. X 50mm. X 1.25mm. | - | Each | 43 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.59 MB
BOQ_5091318.xls
BOQ • 0.37 MB
2911.pdf
Tender Documents • 0.51 MB
Special_Terms_Condition.pdf
Additional Documents • 2.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].