Loading…
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
26 Dec 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Umesh Kumar Yadav
Gurugram
Transmission Line Package TL02 for 400 kV D/C Panchkula - Point PW line (Twin HTLS)[Point PW: First point of 2000 m altitude of Panchkula-Wangtoo line from Panchkula end] associated with Transmission system for evacuation of power from Shongtong Karcham HEP (450 MW) in Himachal Pradesh under TBCB route
CC/T/W-TW/DOM/A00/25/13486
Open
Power/Energy Projects/Products
Works
India
₹25,000
26 Dec 2025
7 Nov 2025
26 Dec 2025
7 Nov 2025
24 Dec 2025
7 Nov 2025
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
01_Section-I IFB.doc
doc • 0.10 MB
02_Annexure-B (IFB) Request Letter.docx
docx • 0.02 MB
03_Annexure-C(IFB)_NDA.docx
docx • 0.04 MB
04_Annexure-A(IFB).doc
doc • 0.05 MB
OBD_Extension_Letter-VII.docx
docx • 0.16 MB
OBD_Extension_Letter-VI.docx
docx • 0.16 MB
OBD_Extension_Letter-V.pdf
pdf • 0.27 MB
OBD_Extension_Letter-IV.docx
docx • 0.16 MB
OBD_Extension_Letter-III.docx
docx • 0.16 MB
Letter_of_Extension-I.pdf
pdf • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .