| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.6 LAccepted-Finance | 1 | Accepted-Finance Satisfied | |
| 2 | 2₹6.1 L+₹46,582 (8.28%)Accepted-Finance 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 2 | Accepted-Finance Satisfied |
Tender Value
Refer Docs
EMD Value
₹7,400
Closing Date
20 Dec 2022, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I CA CWS II Complete dismantling inspection overhaul including renewal of wornout pump components and assembling in any 2 Nos of CWPs in stage II
2022_EB_270456_1
CE / MTPS-I / SE / M-I / CA / OT. 288 /2022-23
Open Tender
Power/Energy Projects/Products
Works
30 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹7,400
Yes
22 Dec 2022
6 Dec 2022
21 Dec 2022
6 Dec 2022
20 Dec 2022
6 Dec 2022
Amount
Charges for dismantling the cooling water pump motor from motor stool assembly, moving to repair bay and positioning on the spare motor stool assembly. Again lifting and moving towards the cooling water pump, positioning and reassembling the motor after completion of cooling water pump overhaul works
Charges for dismantling the flexible coupling assembly, lock nut, bearing plate, thrust bearing, cooling coil & its cooling coil water lines and bearing oil pan. Cleaning and inspection of the components, bearing, renewing the worn-out components and reassembling Of Cooling Water pump
Charges for dismantling of motor stool with pump components of Thrust block, Discharge elbow, Drive shaft, Element – III & II, Intermediate shaft top half coupling, Intermediate shaft, Element – I, pump shaft half coupling, Pump casing, Bearing housing, Pump shaft with impeller, Suction bell mouth assembly, Bell mouth liner, etc Of Cooling Water pump.
Charges for cutting and removal of existing worn-out shaft sleeves (SS) in impeller shaft bottom / impeller shaft top / Intermediate shaft / Drive shaft stuffing box sleeve and assembling of new sleeves by gas flame heating. Of Cooling Water pump
Charges for lifting of impeller along with pump shaft, setting to the impeller stand, removing the impeller from the pump shaft by using hydraulic jack and gas flame heating over the impeller stem portion and reassembling of existing/new impeller with existing / new pump shaft and finally tightening of impeller lock nut and deflector with S.S. Allen screws and tag welding Of Cooling Water pump
After completion of overhaul works, charges for measuring overall lift, providing correct lift and locking with lock nut. Alignment of cooling water pump with motor after tightening of motor bed bolts and finally observation and attending of minor defects noticed during trial run of cooling water pump.
Charges for applying one coat of rust remover, again cleaning the rust, applying one coat of epoxy red oxide primer and one coat of epoxy high built coal tar one over the other for the immersed pump components such as element pipes, pump casing, bearing housing, suction bell mouth assembly & cooling water pump ring guard etc.,
Charges for complete cleaning of pump components above water level with two coats of enamel light / smoke grey, black, green paint over the discharge elbow, thrust pad, motor stool, distance piece, bearing lubricating oil pan (black paint), lubricating oil cooling water lines (green paint) etc
Charges for loading and un loading the shafts and bushes to out side work shop. Of Cooling Water pump Capacity 16,000 M3/ Hr , Single Stage , VMF Model, 1175 KW motor
Transporting of pump components such as element pipes I,II&III, pump casing, bearing housing, suction bell mouth assembly, bearing, shaft sleeve, stuffing box sleeve etc. from stores to site including devolution.(if necessary)
Charges for reconditioning of eroded / porosity of the suction bell mouth assembly by means of cast iron welding electrode over the circumference of 2.82 m of width = 15mm (approx.) and grinding the seating surface of bell mouth liner in suction bell mouth assembly.(Necessary welding generator for welding works will be provided by Board at MTPS workshop. Welding rods are under contractor’s scope.)(This work to be carried out at the time of overhauling, if necessary)
Charges for cutting and removing the existing corroded & damaged cooling water pump ring guard frame structure fabrication & erection of cooling water pump ring guard frame structure
Machining Charges for cleaning and taking measurements of drive shaft, Intermediate shaft and pump shaft -3Nos and checking the trueness of SS shaft of 2.2 meter length [ 800 kg of weight], machining of sleeve to required size and machining of OD of sleeve. For Sl.no 9
Cost of Cutting Gas For Sl.No 2,3,4,5&12
Cost of welding electrode for Sl.No.3
Cost of welding electrode of size 4 mm x 350 mm, packing style 2 kgs. /pkt Suitable for IS 210, Grade 25 grey cast iron.(6 kgs / pump) for Sl.No.11
Cost of S.S. Allen cap screws of size: M12 x 70 mm, full thread for Sl.No.5
Cost of Rust Convertor For Sl.No 7
Cost of Epoxy red oxide primer For Sl.No7
Cost of Epoxy high built coal tar For Sl.No 7
Cost of Epoxy Thinner For Sl.No 7&8
Cost for Two coats of Enamel light/smoke grey paint for Sl.No.8
Consumable and T&P Cost for SL.No.1 to 12
SS ENGINEERING CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .