Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAccepted-Finance 154 VEER ABDUL HAMEED NAGAR KAKRAHI BAZAR DIBIYAPUR AURAIYA UTTAR PRADESH 206244 | AURAIYA | UTTAR PRADESH | 206244 | ₹4.5 Cr | L1 | Accepted-Finance TECHNO COMMERCIAL ACCEPTABLE |
| 2 | L2₹4.5 Cr+₹4.2 L (0.94%)Accepted-Finance | ₹4.5 Cr+₹4.2 L (0.94%) | L2 | Accepted-Finance TECHNO COMMERCIAL ACCEPTABLE |
| 3 | L3₹5.2 Cr+₹69.9 L (15.6%)Accepted-Finance | ₹5.2 Cr+₹69.9 L (15.6%) | L3 | Accepted-Finance TECHNO COMMERCIAL ACCEPTABLE |
| 4 | L4₹5.2 Cr+₹72.5 L (16.1%)Accepted-Finance 0 MANDA KHAS MANDA MEJA ALLAHABAD UTTAR PRADESH 212104 | PRAYAGRAJ | UTTAR PRADESH | 212104 | ₹5.2 Cr+₹72.5 L (16.1%) | L4 | Accepted-Finance TECHNO COMMERCIAL ACCEPTABLE |
| 5 | L5₹5.2 Cr+₹73.8 L (16.4%)Accepted-Finance | ₹5.2 Cr+₹73.8 L (16.4%) | L5 | Accepted-Finance TECHNO COMMERCIAL ACCEPTABLE |
Tender Value
Refer Docs
EMD Value
₹13.0 L
Closing Date
20 Aug 2025, 4:00 pmClosed
TWINKLE GOUR
GAIL PATA
RENOVATION OF 80 HOUSES AT GAIL GAON TOWNSHIP DIBIYAPUR
2025_GAIL_239522_1
GAIL/PA25/20126352/988/TG
Open Tender
Civil Works - Others
Works
730 days
GAIL PATA
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹13.0 L
Yes
THROUGH MS TEAMS
7 Sept 2026
1 Jul 2025
21 Aug 2025
2 Jul 2025
20 Aug 2025
8 Jul 2025
8 Jul 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge
2.6.1: All kinds of soil | 25 | Cum | 150.42 | ₹3,760.5 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 25 | Cum | 166.1 | ₹4,152.5 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 10.73 | Cum | 1,799.79 | ₹19,302.75 |
| 4 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish to the dump areas within the township premises at designated place and as directed by EIC all complete, disposed earth to be leveled and neatly dressed for all kinds of soil | 1,959.38 | Sqm | 28.94 | ₹56,704.31 |
| 5 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 117.5 | cum | 223.69 | ₹26,283.58 |
| 6Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : including dressing and compaction of sub base ( below dismantled floor ) | |||||
| 6.1 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 31.35 | cum | 6,676.69 | ₹2,09,314.23 |
| 6.2 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 382.5 | cum | 5,772.88 | ₹22,08,126.6 |
| 7 | Reinforced cement concrete work at all levels excluding the cost of shuttering and reinforcement with: 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) | 10.73 | cum | 8,871.25 | ₹95,144.16 |
| 8 | Supplying and laying Reinforcement at all levels for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete with Thermo-Mechanically Treated bars of grade Fe-500D or more | 427.5 | kg | 91.4 | ₹39,073.5 |
stage.html
html • 0.11 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.02 MB
TENDER.pdf
Tender Documents • 2.50 MB
BOQ_272525.xls
BOQ • 0.50 MB
Tenderdocument.pdf
Tender Documents • 2.50 MB
BOQ.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .