Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.4 LAccepted-Finance | ₹28.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹28.4 LRejected-Finance | ₹28.4 L | L2 | Rejected-Finance L2 |
Tender Value
₹33.6 L
EMD Value
₹68,000
Closing Date
27 Apr 2026, 12:00 pmClosed
EE RED HAMIRPUR
EE RED HAMIRPUR
NAGAR KSHETRA RATH STHIT MUHAL SIKANDARPURA ME KABIR CHAURA AASHRAM KE PASS YATRI VISHRAMALAY KA NIRMAN KARYA
2026_REDUP_1139129_18
I/885181/2026/RED/TENDER FILE/2025-26 DT. 28/03/2026
Open Tender
Civil Works
180 days
RATH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹68,000
22 May 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | cum | - | - | 1 |
| 2 | Sand filling in BaseSupplying and filling in plinth with sand under floors, including watering,
ramming, consolidating and dressing complete. | - | cum | - | - | 2 |
| 3 | Lean concrete in foundation in 1:4:8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | cum | - | - | 3 |
| 4 | RCC in 1:1.5:3 in foundation Providing and laying in position specified grade of reinforced cement
concrete, excluding the cost of centering, shuttering, finishing and
reinforcement - All work up to plinth (Foundation) | - | cum | - | - | 4 |
| 5 | RCC in 1:1.5:3 in foundation Providing and laying in position specified grade of reinforced cement
concrete, excluding the cost of centering, shuttering, finishing and
reinforcement - All work up to plinth (Plinth beam) | - | cum | - | - | 5 |
| 6 | Providing cutting MS Bar Reinforcement in RCC Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level | - | kg | - | - | 6 |
| 7 | Providing and fixing Shuttering in foundation Foundations, footings, bases of columns, etc. for mass
concrete (Foundation) | - | sqm | - | - | 7 |
| 8 | Providing and fixing Shuttering in foundation Foundations, footings, bases of columns, etc. for mass
concrete (Plinth beam) | - | sqm | - | - | 8 |
| 9 | Back filling of Excavated earth in foundation after casting RCC,flooring of pit | - | cum | - | - | 9 |
| 10 | Supply and fixing Errection MS Tublar structure colum post truss purline Steel work in built up tubular (round, square or rectangular hollow tubesetc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.complete as per design | - | kg | - | - | 10 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.98 MB
BOQ_2126902.xls
BOQ • 0.31 MB
18SBD.pdf
Tender Documents • 2.60 MB
Download all tender documents and submit your bid